Williams, Arizona Impact Fees

Williams applies its own fee schedule. Coconino County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $1,580.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Williams Impact Fees by Project Type

Williams: Single-Family Impact Fees

A new single-family home in Williams pays at least $1,580.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

Water Buy-In Fee (City of Williams) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Fee (City of Williams) and Sewer Connection Fee (City of Williams) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Williams Impact Fee Schedule
Water$1,580.00
  • Water Buy-In Fee (City of Williams)
    City of Williams
    Flat water buy-in fee of $1,580 per single-family residence under the Williams City Code, charged before a new water connection in addition to the connection fee and deposit.
    $1,580.00Requires confirmation
  • Water Connection Fee (City of Williams)
    City of Williams
    The City of Williams provides water service. The water connection fee (tap and meter) is set by City Council resolution and is not published; a separate water buy-in fee also applies.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Williams)
    City of Williams
    The City of Williams provides sewer service. Sewer buy-in and connection charges are set by City Council resolution and are not published. A building moratorium tied to wastewater treatment capacity, approved in August 2023 and reported to run until 2027, limits new connections.
    Requires confirmation
City$0.00
  • City Development Impact Fee (City of Williams)
    City of Williams
    The City of Williams levies no development impact fee for streets, parks, police, fire or library; its only development charges are the water and sewer buy-in and connection fees.
    $0.00
County$0.00
Total (Williams): $1,580.00
Sources last checked Official fee schedules:City of Williams Coconino County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Coconino County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Williams: Multifamily Impact Fees

A new multifamily unit in Williams pays at least $1,111.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

Water Buy-In Fee (City of Williams, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (City of Williams, MF) and Water Connection Fee (City of Williams, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Williams Impact Fee Schedule
Water$1,111.00
  • Water Buy-In Fee (City of Williams, MF)
    City of Williams
    Water buy-in fee of $1,111 per multifamily unit under the Williams City Code, charged before a new water connection in addition to the connection fee and deposit.
    $1,111.00Requires confirmation
  • Water Connection Fee (City of Williams, MF)
    City of Williams
    The City of Williams provides water service. The water connection fee (tap and meter) is set by City Council resolution and is not published; a separate water buy-in fee per unit also applies.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Williams, MF)
    City of Williams
    The City of Williams provides sewer service. Sewer buy-in and connection charges are set by City Council resolution and are not published. A building moratorium tied to wastewater treatment capacity, approved in August 2023 and reported to run until 2027, limits new connections.
    Requires confirmation
City$0.00
  • City Development Impact Fee (City of Williams, MF)
    City of Williams
    The City of Williams levies no development impact fee for streets, parks, police, fire or library; its only development charges are the water and sewer buy-in and connection fees.
    $0.00
County$0.00
Total (Williams): $1,111.00
Sources last checked Official fee schedules:City of Williams Coconino County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Coconino County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Williams: Commercial Impact Fees

Commercial development in Williams pays no per-square-foot impact fees, but owes $4,560.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to at least $4,560.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Buy-In Fee (City of Williams) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (City of Williams) and Water Connection Fee (City of Williams) are set by the utility and not published online. City Development Impact Fee (City of Williams, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Williams Impact Fee Schedule
Water$4,560.00 one-time
  • Water Buy-In Fee (City of Williams) — 1" meter
    City of Williams
    Commercial water buy-in fee under the Williams City Code: a flat fee by meter size (3/4 inch $3,510, 1 inch $4,560, 1-1/2 inch $5,640, 2 inch $9,150, 3 inch $35,160, 4 inch $45,710) plus a charge per plumbing fixture unit ($114 for general commercial, institutional and industrial uses, $210 for hotels and motels, $366 for restaurants, $252 for industrial laundries). One meter per commercial property. Amount shown is the meter portion only.
    $4,560.00 one-timeRequires confirmation
  • Water Connection Fee (City of Williams)
    City of Williams Water Department
    The City of Williams provides water service. The water connection fee (tap and meter) is set by City Council resolution and is not published; a separate water buy-in fee also applies.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Williams)
    City of Williams
    The City of Williams provides sewer service. Sewer buy-in and connection charges are set by City Council resolution and are not published. A building moratorium tied to wastewater treatment capacity, approved in August 2023 and reported to run until 2027, limits new connections.
    Requires confirmation
City$0.00
County$0.00
Total (Williams): $4,560.00 one-time (≈ $4,560.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Williams City of Williams Water Department Coconino County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Coconino County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Williams: Industrial Impact Fees

Industrial development in Williams pays no per-square-foot impact fees, but owes $4,560.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to at least $4,560.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Buy-In Fee (City of Williams) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (City of Williams) and Water Connection Fee (City of Williams) are set by the utility and not published online. City Development Impact Fee (City of Williams, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Williams Impact Fee Schedule
Water$4,560.00 one-time
  • Water Buy-In Fee (City of Williams) — 1" meter
    City of Williams
    Commercial water buy-in fee under the Williams City Code: a flat fee by meter size (3/4 inch $3,510, 1 inch $4,560, 1-1/2 inch $5,640, 2 inch $9,150, 3 inch $35,160, 4 inch $45,710) plus a charge per plumbing fixture unit ($114 for general commercial, institutional and industrial uses, $210 for hotels and motels, $366 for restaurants, $252 for industrial laundries). One meter per commercial property. Amount shown is the meter portion only.
    $4,560.00 one-timeRequires confirmation
  • Water Connection Fee (City of Williams)
    City of Williams Water Department
    The City of Williams provides water service. The water connection fee (tap and meter) is set by City Council resolution and is not published; a separate water buy-in fee also applies.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Williams)
    City of Williams
    The City of Williams provides sewer service. Sewer buy-in and connection charges are set by City Council resolution and are not published. A building moratorium tied to wastewater treatment capacity, approved in August 2023 and reported to run until 2027, limits new connections.
    Requires confirmation
City$0.00
County$0.00
Total (Williams): $4,560.00 one-time (≈ $4,560.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Williams City of Williams Water Department Coconino County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Coconino County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Williams: Office Impact Fees

Office development in Williams pays no per-square-foot impact fees, but owes $4,560.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 25,000 sq ft building, that comes to at least $4,560.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Buy-In Fee (City of Williams) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (City of Williams) and Water Connection Fee (City of Williams) are set by the utility and not published online. City Development Impact Fee (City of Williams, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Williams Impact Fee Schedule
Water$4,560.00 one-time
  • Water Buy-In Fee (City of Williams) — 1" meter
    City of Williams
    Commercial water buy-in fee under the Williams City Code: a flat fee by meter size (3/4 inch $3,510, 1 inch $4,560, 1-1/2 inch $5,640, 2 inch $9,150, 3 inch $35,160, 4 inch $45,710) plus a charge per plumbing fixture unit ($114 for general commercial, institutional and industrial uses, $210 for hotels and motels, $366 for restaurants, $252 for industrial laundries). One meter per commercial property. Amount shown is the meter portion only.
    $4,560.00 one-timeRequires confirmation
  • Water Connection Fee (City of Williams)
    City of Williams Water Department
    The City of Williams provides water service. The water connection fee (tap and meter) is set by City Council resolution and is not published; a separate water buy-in fee also applies.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Williams)
    City of Williams
    The City of Williams provides sewer service. Sewer buy-in and connection charges are set by City Council resolution and are not published. A building moratorium tied to wastewater treatment capacity, approved in August 2023 and reported to run until 2027, limits new connections.
    Requires confirmation
City$0.00
County$0.00
Total (Williams): $4,560.00 one-time (≈ $4,560.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Williams City of Williams Water Department Coconino County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Coconino County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Williams Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Williams Impact Fee FAQs

What are the total impact fees for a single-family home in Williams, Arizona?

A new single-family home in Williams pays at least $1,580.00 per unit in combined impact fees (rates sourced October 15, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Williams?

Commercial development in Williams pays no per-square-foot impact fees, but owes $4,560.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Williams charge its own impact fees?

Yes. Williams levies its own municipal impact or utility fees. Coconino County does not currently add county-level impact fees inside Williams. The schedule on this page shows every fee that applies to development in Williams.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Coconino County impact fees page.

Missing a jurisdiction? Get in touch.