Impact fees in Greenlee County depend on where you build. This page details the rates for unincorporated Greenlee County: at least $40.00 per single-family unit as of . One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Greenlee County Impact Fees by Project Type

Where in Greenlee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Greenlee County$40.00this pageIncludes unconfirmed fees
Clifton$740.00Includes unconfirmed feesDuncan$1,650.00

Unincorporated Greenlee County: Single-Family Impact Fees

A new single-family home in unincorporated Greenlee County pays at least $40.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Morenci Water & Electric, Unincorporated) ($40.00).

Sewer Connection Fee (Greenlee County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Greenlee County Impact Fee Schedule
Water$40.00
  • Water Connection Fee (Morenci Water & Electric, Unincorporated)
    The Morenci Water & Electric Company
    Modeled on Morenci Water & Electric, the largest water system in unincorporated Greenlee County (the Morenci townsite): a $40 water connection fee per new service, plus a refundable deposit. Other unincorporated areas are served by small private water companies (Verde Lee, Loma Linda) or by private wells, each with its own charges.
    $40.00
Sewer$0.00
  • Sewer Connection Fee (Greenlee County - Unincorporated)
    Greenlee County
    Greenlee County operates no sewer utility. Outside the towns, most new homes use on-site septic systems permitted by the County Health Department. The Morenci townsite is sewered through a wastewater plant run by the mine owner, and no sewer connection fee is published for it.
    Requires confirmation
City$0.00
County$0.00
Total (unincorporated Greenlee County): $40.00
Sources last checked Official fee schedules:The Morenci Water & Electric Company Greenlee County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Greenlee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Greenlee County$40.00this pageIncludes unconfirmed fees
Clifton$740.00Includes unconfirmed feesDuncan$1,850.00

Unincorporated Greenlee County: Multifamily Impact Fees

A new multifamily unit in unincorporated Greenlee County pays at least $40.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Morenci Water & Electric, Unincorporated, MF) ($40.00).

Sewer Connection Fee (Greenlee County - Unincorporated, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Greenlee County Impact Fee Schedule
Water$40.00
  • Water Connection Fee (Morenci Water & Electric, Unincorporated, MF)
    The Morenci Water & Electric Company
    Modeled on Morenci Water & Electric, the largest water system in unincorporated Greenlee County (the Morenci townsite): a $40 water connection fee per new service, plus a refundable deposit. A building on one connection pays it once. Other unincorporated areas are served by small private water companies or by private wells.
    $40.00
Sewer$0.00
  • Sewer Connection Fee (Greenlee County - Unincorporated, MF)
    Greenlee County
    Greenlee County operates no sewer utility. Outside the towns, new development uses on-site septic systems permitted by the County Health Department. The Morenci townsite is sewered through a wastewater plant run by the mine owner, and no sewer connection fee is published for it.
    Requires confirmation
City$0.00
County$0.00
Total (unincorporated Greenlee County): $40.00
Sources last checked Official fee schedules:The Morenci Water & Electric Company Greenlee County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Greenlee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Greenlee County$40.00*this pageIncludes unconfirmed fees
Clifton$1,040.00*Includes unconfirmed feesDuncan$2,100.00*

Unincorporated Greenlee County: Commercial Impact Fees

Commercial development in unincorporated Greenlee County pays no per-square-foot impact fees, but owes $40.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to at least $40.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Morenci Water & Electric, Unincorporated) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (Greenlee County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Greenlee County Impact Fee Schedule
Water$40.00 one-time
  • Water Connection Fee (Morenci Water & Electric, Unincorporated)
    Morenci Water & Electric (Freeport-McMoRan)
    Modeled on Morenci Water & Electric, the largest water system in unincorporated Greenlee County (the Morenci townsite): a $40 water connection fee per new service, plus a refundable deposit. Larger commercial services may carry main extension charges set by agreement. Other unincorporated areas are served by small private water companies (Verde Lee, Loma Linda) or by private wells, each with its own charges.
    $40.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Greenlee County - Unincorporated)
    Greenlee County
    Greenlee County operates no sewer utility. Outside the towns, most new development uses on-site septic systems permitted by the County Health Department. The Morenci townsite is sewered through a wastewater plant run by the mine owner, and no sewer connection fee is published for it.
    Requires confirmation
City$0.00
County$0.00
Total (unincorporated Greenlee County): $40.00 one-time (≈ $40.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Morenci Water & Electric (Freeport-McMoRan) Greenlee County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Greenlee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Greenlee County$40.00*this pageIncludes unconfirmed fees
Clifton$1,040.00*Includes unconfirmed feesDuncan$2,100.00*

Unincorporated Greenlee County: Industrial Impact Fees

Industrial development in unincorporated Greenlee County pays no per-square-foot impact fees, but owes $40.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to at least $40.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Morenci Water & Electric, Unincorporated) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (Greenlee County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Greenlee County Impact Fee Schedule
Water$40.00 one-time
  • Water Connection Fee (Morenci Water & Electric, Unincorporated)
    Morenci Water & Electric (Freeport-McMoRan)
    Modeled on Morenci Water & Electric, the largest water system in unincorporated Greenlee County (the Morenci townsite): a $40 water connection fee per new service, plus a refundable deposit. Larger commercial services may carry main extension charges set by agreement. Other unincorporated areas are served by small private water companies (Verde Lee, Loma Linda) or by private wells, each with its own charges.
    $40.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Greenlee County - Unincorporated)
    Greenlee County
    Greenlee County operates no sewer utility. Outside the towns, most new development uses on-site septic systems permitted by the County Health Department. The Morenci townsite is sewered through a wastewater plant run by the mine owner, and no sewer connection fee is published for it.
    Requires confirmation
City$0.00
County$0.00
Total (unincorporated Greenlee County): $40.00 one-time (≈ $40.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Morenci Water & Electric (Freeport-McMoRan) Greenlee County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Greenlee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Greenlee County$40.00*this pageIncludes unconfirmed fees
Clifton$1,040.00*Includes unconfirmed feesDuncan$2,100.00*

Unincorporated Greenlee County: Office Impact Fees

Office development in unincorporated Greenlee County pays no per-square-foot impact fees, but owes $40.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 25,000 sq ft building, that comes to at least $40.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Morenci Water & Electric, Unincorporated) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (Greenlee County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Greenlee County Impact Fee Schedule
Water$40.00 one-time
  • Water Connection Fee (Morenci Water & Electric, Unincorporated)
    Morenci Water & Electric (Freeport-McMoRan)
    Modeled on Morenci Water & Electric, the largest water system in unincorporated Greenlee County (the Morenci townsite): a $40 water connection fee per new service, plus a refundable deposit. Larger commercial services may carry main extension charges set by agreement. Other unincorporated areas are served by small private water companies (Verde Lee, Loma Linda) or by private wells, each with its own charges.
    $40.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Greenlee County - Unincorporated)
    Greenlee County
    Greenlee County operates no sewer utility. Outside the towns, most new development uses on-site septic systems permitted by the County Health Department. The Morenci townsite is sewered through a wastewater plant run by the mine owner, and no sewer connection fee is published for it.
    Requires confirmation
City$0.00
County$0.00
Total (unincorporated Greenlee County): $40.00 one-time (≈ $40.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Morenci Water & Electric (Freeport-McMoRan) Greenlee County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Greenlee County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Greenlee County Impact Fee FAQs

What are single-family impact fees in Greenlee County, Arizona?

A new single-family home in unincorporated Greenlee County pays at least $40.00 per unit in impact fees (rates sourced October 16, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Greenlee County?

Multifamily development in unincorporated Greenlee County pays at least $40.00 per unit in impact fees (rates sourced October 16, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Greenlee County?

Commercial development in unincorporated Greenlee County pays no per-square-foot impact fees, but owes $40.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Do cities in Greenlee County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 2 of 2 cities in Greenlee County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000