Parker Impact Fees by Project Type
Parker: Single-Family Impact Fees
A new single-family home in Parker pays at least $1,200.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Installation Fee (Town of Parker) — 3/4" meter ($1,200.00).
Sewer Connection Fee (CRSS Joint Venture) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Parker Impact Fee Schedule
- Water Meter Installation Fee (Town of Parker) — 3/4" meter$1,200.00Town of ParkerThe Town of Parker charges a one-time water meter installation fee by meter size; the 3/4-inch meter is the smallest residential service. A refundable meter deposit is also collected and is not included. Amounts are from the Town's schedule of fees and rates adopted June 17, 2025 and effective August 1, 2025. Sewer service in Parker is provided by a separate joint venture, which has halted new connections that add capacity since late 2024.
- Sewer Connection Fee (CRSS Joint Venture)Requires confirmationColorado River Sewage System Joint VentureSanitary sewer service in Parker is provided by the Colorado River Sewage System Joint Venture, a partnership of the Town of Parker and the Colorado River Indian Tribes, rather than by the Town itself. The Joint Venture sets its own connection charges and does not publish a connection fee schedule. New connections that add capacity have been halted since late 2024 while the Joint Venture's treatment plant is repaired or replaced, and in 2025 the Town adopted written findings supporting a building moratorium on that basis.
- City Development Impact Fee (Town of Parker)$0.00Town of ParkerThe Town of Parker does not levy development impact fees. Its adopted schedule of fees and rates, effective August 1, 2025, contains building, planning and utility service charges only.
- County Development Fee (La Paz County)$0.00La Paz CountyLa Paz County does not levy development impact fees, inside the Town of Parker or elsewhere.
Where in La Paz County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Parker: Multifamily Impact Fees
A new multifamily unit in Parker pays at least $1,200.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Installation Fee (Town of Parker, MF) — 3/4" meter ($1,200.00).
Sewer Connection Fee (CRSS Joint Venture, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Parker Impact Fee Schedule
- Water Meter Installation Fee (Town of Parker, MF) — 3/4" meter$1,200.00Town of ParkerThe Town of Parker charges a one-time water meter installation fee by meter size, with no separate multifamily rate. This is the smallest residential meter, one connection per unit; a building served by one larger meter pays once at that meter's rate. A refundable meter deposit is also collected and is not included. Amounts are from the Town's schedule of fees and rates adopted June 17, 2025 and effective August 1, 2025. Sewer service in Parker is provided by a separate joint venture, which has halted new connections that add capacity since late 2024.
- Sewer Connection Fee (CRSS Joint Venture, MF)Requires confirmationColorado River Sewage System Joint VentureSanitary sewer service in Parker is provided by the Colorado River Sewage System Joint Venture, a partnership of the Town of Parker and the Colorado River Indian Tribes, rather than by the Town itself. The Joint Venture sets its own connection charges and publishes no connection fee schedule, including no per-dwelling-unit multifamily rate. New connections that add capacity have been halted since late 2024 while the Joint Venture's treatment plant is repaired or replaced, and in 2025 the Town adopted written findings supporting a building moratorium on that basis.
- City Development Impact Fee (Town of Parker, MF)$0.00Town of ParkerThe Town of Parker does not levy development impact fees. Its adopted schedule of fees and rates, effective August 1, 2025, contains building, planning and utility service charges only.
- County Development Fee (La Paz County, MF)$0.00La Paz CountyLa Paz County does not levy development impact fees, inside the Town of Parker or elsewhere.
Where in La Paz County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Parker: Commercial Impact Fees
Commercial development in Parker pays no per-square-foot impact fees, but owes $1,460.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 50,000 sq ft building, that comes to at least $1,460.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Fee (Town of Parker) — 1" meter ($1,460.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (CRSS Joint Venture) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Parker Impact Fee Schedule
- Water Meter Installation Fee (Town of Parker) — 1" meter$1,460.00 one-timeTown of ParkerThe Town of Parker charges a one-time water meter installation fee by meter size on every new water service, residential or commercial; the 1-inch meter is shown and other sizes are listed. A refundable meter deposit is also collected and is not included. Amounts are from the Town's schedule of fees and rates adopted June 17, 2025 and effective August 1, 2025. Sewer service in Parker is provided by a separate joint venture, which has halted new connections that add capacity since late 2024.
- Sewer Connection Fee (CRSS Joint Venture)Requires confirmationColorado River Sewage System Joint VentureSanitary sewer service in Parker is provided by the Colorado River Sewage System Joint Venture, a partnership of the Town of Parker and the Colorado River Indian Tribes, rather than by the Town itself. The Joint Venture sets its own connection charges and does not publish a connection fee schedule. New connections that add capacity have been halted since late 2024 while the Joint Venture's treatment plant is repaired or replaced, and in 2025 the Town adopted written findings supporting a building moratorium on that basis.
- City Development Impact Fee (Town of Parker, Commercial)$0.00Town of ParkerThe Town of Parker has not adopted development impact fees; its schedule of fees and rates effective August 1, 2025 contains none. Water meter installation and sewer charges are listed separately.
- County Development Impact Fee (La Paz County, Commercial)$0.00La Paz CountyLa Paz County does not levy development impact fees, inside the Town of Parker or elsewhere in the county.
Where in La Paz County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Parker: Industrial Impact Fees
Industrial development in Parker pays no per-square-foot impact fees, but owes $1,460.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 50,000 sq ft building, that comes to at least $1,460.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Fee (Town of Parker) — 1" meter ($1,460.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (CRSS Joint Venture) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Parker Impact Fee Schedule
- Water Meter Installation Fee (Town of Parker) — 1" meter$1,460.00 one-timeTown of ParkerThe Town of Parker charges a one-time water meter installation fee by meter size on every new water service, residential or commercial; the 1-inch meter is shown and other sizes are listed. A refundable meter deposit is also collected and is not included. Amounts are from the Town's schedule of fees and rates adopted June 17, 2025 and effective August 1, 2025. Sewer service in Parker is provided by a separate joint venture, which has halted new connections that add capacity since late 2024.
- Sewer Connection Fee (CRSS Joint Venture)Requires confirmationColorado River Sewage System Joint VentureSanitary sewer service in Parker is provided by the Colorado River Sewage System Joint Venture, a partnership of the Town of Parker and the Colorado River Indian Tribes, rather than by the Town itself. The Joint Venture sets its own connection charges and does not publish a connection fee schedule. New connections that add capacity have been halted since late 2024 while the Joint Venture's treatment plant is repaired or replaced, and in 2025 the Town adopted written findings supporting a building moratorium on that basis.
- City Development Impact Fee (Town of Parker, Industrial)$0.00Town of ParkerThe Town of Parker has not adopted development impact fees; its schedule of fees and rates effective August 1, 2025 contains none. Water meter installation and sewer charges are listed separately.
- County Development Impact Fee (La Paz County, Industrial)$0.00La Paz CountyLa Paz County does not levy development impact fees, inside the Town of Parker or elsewhere in the county.
Where in La Paz County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Parker: Office Impact Fees
Office development in Parker pays no per-square-foot impact fees, but owes $1,460.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 25,000 sq ft building, that comes to at least $1,460.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Fee (Town of Parker) — 1" meter ($1,460.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (CRSS Joint Venture) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Parker Impact Fee Schedule
- Water Meter Installation Fee (Town of Parker) — 1" meter$1,460.00 one-timeTown of ParkerThe Town of Parker charges a one-time water meter installation fee by meter size on every new water service, residential or commercial; the 1-inch meter is shown and other sizes are listed. A refundable meter deposit is also collected and is not included. Amounts are from the Town's schedule of fees and rates adopted June 17, 2025 and effective August 1, 2025. Sewer service in Parker is provided by a separate joint venture, which has halted new connections that add capacity since late 2024.
- Sewer Connection Fee (CRSS Joint Venture)Requires confirmationColorado River Sewage System Joint VentureSanitary sewer service in Parker is provided by the Colorado River Sewage System Joint Venture, a partnership of the Town of Parker and the Colorado River Indian Tribes, rather than by the Town itself. The Joint Venture sets its own connection charges and does not publish a connection fee schedule. New connections that add capacity have been halted since late 2024 while the Joint Venture's treatment plant is repaired or replaced, and in 2025 the Town adopted written findings supporting a building moratorium on that basis.
- City Development Impact Fee (Town of Parker, Office)$0.00Town of ParkerThe Town of Parker has not adopted development impact fees; its schedule of fees and rates effective August 1, 2025 contains none. Water meter installation and sewer charges are listed separately.
- County Development Impact Fee (La Paz County, Office)$0.00La Paz CountyLa Paz County does not levy development impact fees, inside the Town of Parker or elsewhere in the county.
Where in La Paz County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Parker Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Parker Impact Fee FAQs
What are the total impact fees for a single-family home in Parker, Arizona?
A new single-family home in Parker pays at least $1,200.00 per unit in combined impact fees (rates sourced October 16, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Parker?
Commercial development in Parker pays no per-square-foot impact fees, but owes $1,460.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Parker charge its own impact fees?
Yes. Parker levies its own municipal impact or utility fees. La Paz County does not currently add county-level impact fees inside Parker. The schedule on this page shows every fee that applies to development in Parker.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.