Skip to content
IMPACTFEES.ORG

Nogales, Arizona Impact Fees

Nogales applies its own fee schedule. Santa Cruz County does not currently add county-level impact fees inside city limits. A new single-family home pays $4,436.00 per unit (rates sourced ). The full breakdown is below.

Nogales Impact Fees by Project Type

Nogales: Single-Family Impact Fees

A new single-family home in Nogales pays $4,436.00 per unit in impact fees (rates sourced August 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Supply Connection Fee (City of Nogales) ($2,786.00) and Sewer Connection Fee (City of Nogales) — 15 FU × $110/FU ($1,650.00).

View the Full Nogales Impact Fee Schedule
Water$2,786.00
  • Water Supply Connection Fee (City of Nogales)
    City of Nogales Water Utility
    City of Nogales water supply connection fee for a new single-family detached home inside city limits (Nogales City Code Sec. 19-82(e)), which funds new surface water and groundwater resources for the city water system. A home outside city limits on the city system pays $3,482. The city's meter installation charge, set by City Council resolution, and any tap or pipeline charges are additional.
    $2,786.00
Sewer$1,650.00
  • Sewer Connection Fee (City of Nogales) — 15 FU × $110/FU
    City of Nogales Utilities Dept
    City of Nogales sewer connection fee of $110 per plumbing fixture unit inside city limits ($137.50 outside), Nogales City Code Sec. 19-127, paid before the building permit is issued. The amount shown is for a typical 3 bedroom, 2 bath home of 15 fixture units; the actual fee follows the home's fixture count.
    $1,650.00
City$0.00
  • City Development Impact Fee (City of Nogales)
    City of Nogales
    The City of Nogales does not charge a development impact fee. Its code contains no development fee provisions and the city posts no development fee schedule; new residential construction pays building permit, plan review and utility charges only.
    $0.00
County$0.00
  • County Development Impact Fee (Santa Cruz County)
    Santa Cruz County
    Santa Cruz County does not levy development impact fees under A.R.S. § 11-1102 and has adopted no infrastructure improvements plan, so no county development fee applies to new homes in Nogales.
    $0.00
Total (Nogales): $4,436.00
Sources last checked Official fee schedules:City of Nogales Water Utility City of Nogales Utilities Dept City of Nogales Santa Cruz County

Where in Santa Cruz County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Nogales: Multifamily Impact Fees

A new multifamily unit in Nogales pays $3,886.00 per unit in impact fees (rates sourced August 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Supply Connection Fee (City of Nogales, MF) — 5/8" x 3/4" meter ($2,786.00) and Sewer Connection Fee (City of Nogales, MF) — 10 FU × $110/FU ($1,100.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Nogales Impact Fee Schedule
Water$2,786.00
  • Water Supply Connection Fee (City of Nogales, MF) — 5/8" x 3/4" meter
    City of Nogales Water Utility
    City of Nogales water supply connection fee for uses other than single-family detached homes, set by the required meter size (Nogales City Code Sec. 19-82(e)), inside city limits. The 5/8 x 3/4 inch meter fee is shown per unit, as when each unit has its own meter; a building on one larger master meter pays that meter's fee once (for example $6,965 for 1 inch or $22,289 for 2 inch). Rates outside city limits are higher. The city's meter installation charge, set by City Council resolution, is additional.
    $2,786.00
Sewer$1,100.00
  • Sewer Connection Fee (City of Nogales, MF) — 10 FU × $110/FU
    City of Nogales Utilities Dept
    City of Nogales sewer connection fee of $110 per plumbing fixture unit inside city limits ($137.50 outside), Nogales City Code Sec. 19-127, paid before the building permit is issued. Multifamily projects are assessed on the building's total fixture units; the amount shown is per unit for a typical 2 bedroom, 2 bath unit of 10 fixture units.
    $1,100.00
City$0.00
  • City Development Impact Fee (City of Nogales, MF)
    City of Nogales
    The City of Nogales does not charge a development impact fee on multifamily construction. Its code contains no development fee provisions and the city posts no development fee schedule; new residential construction pays building permit, plan review and utility charges only.
    $0.00
County$0.00
  • County Development Impact Fee (Santa Cruz County, MF)
    Santa Cruz County
    Santa Cruz County does not levy development impact fees under A.R.S. § 11-1102 and has adopted no infrastructure improvements plan, so no county development fee applies to new multifamily units in Nogales.
    $0.00
Total (Nogales): $3,886.00
Sources last checked Official fee schedules:City of Nogales Water Utility City of Nogales Utilities Dept City of Nogales Santa Cruz County

Where in Santa Cruz County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Nogales: Commercial Impact Fees

Commercial development in Nogales pays no per-square-foot impact fees, but owes $6,965.00 in one-time water and sewer connection fees (rates sourced August 13, 2026).

For a 50,000 sq ft building, that comes to at least $6,965.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Supply Connection Fee (City of Nogales) — 1" meter ($6,965.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Nogales) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Nogales Impact Fee Schedule
Water$6,965.00 one-time
  • Water Supply Connection Fee (City of Nogales) — 1" meter
    City of Nogales
    Water supply connection fee by meter size for nonresidential development inside Nogales city limits, paid at building permit (or before the meter is connected when no permit is needed). Outside city limits a separate, higher schedule applies (1 inch meter $8,706.00). Connections needing a meter larger than 8 inches are priced by the city on expected demand. A separate meter installation charge set by City Council resolution applies in addition, with $150 more per connection outside city limits.
    $6,965.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Nogales) — per fixture unit
    City of Nogales
    Sewer connection fee for commercial and industrial development is $220.00 per plumbing fixture unit inside the city; the total scales with the building's fixture-unit count. Outside city limits the rate is $275.00 per fixture unit.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Nogales): $6,965.00 one-time (≈ $6,965.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Nogales Santa Cruz County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Santa Cruz County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Nogales: Industrial Impact Fees

Industrial development in Nogales pays no per-square-foot impact fees, but owes $6,965.00 in one-time water and sewer connection fees (rates sourced August 13, 2026).

For a 50,000 sq ft building, that comes to at least $6,965.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Supply Connection Fee (City of Nogales) — 1" meter ($6,965.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Nogales) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Nogales Impact Fee Schedule
Water$6,965.00 one-time
  • Water Supply Connection Fee (City of Nogales) — 1" meter
    City of Nogales
    Water supply connection fee by meter size for nonresidential development inside Nogales city limits, paid at building permit (or before the meter is connected when no permit is needed). Outside city limits a separate, higher schedule applies (1 inch meter $8,706.00). Connections needing a meter larger than 8 inches are priced by the city on expected demand. A separate meter installation charge set by City Council resolution applies in addition, with $150 more per connection outside city limits.
    $6,965.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Nogales) — per fixture unit
    City of Nogales
    Sewer connection fee for commercial and industrial development is $220.00 per plumbing fixture unit inside the city; the total scales with the building's fixture-unit count. Outside city limits the rate is $275.00 per fixture unit.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Nogales): $6,965.00 one-time (≈ $6,965.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Nogales Santa Cruz County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Santa Cruz County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Nogales: Office Impact Fees

Office development in Nogales pays no per-square-foot impact fees, but owes $6,965.00 in one-time water and sewer connection fees (rates sourced August 13, 2026).

For a 25,000 sq ft building, that comes to at least $6,965.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Supply Connection Fee (City of Nogales) — 1" meter ($6,965.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Nogales) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Nogales Impact Fee Schedule
Water$6,965.00 one-time
  • Water Supply Connection Fee (City of Nogales) — 1" meter
    City of Nogales
    Water supply connection fee by meter size for nonresidential development inside Nogales city limits, paid at building permit (or before the meter is connected when no permit is needed). Outside city limits a separate, higher schedule applies (1 inch meter $8,706.00). Connections needing a meter larger than 8 inches are priced by the city on expected demand. A separate meter installation charge set by City Council resolution applies in addition, with $150 more per connection outside city limits.
    $6,965.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Nogales) — per fixture unit
    City of Nogales
    Sewer connection fee for commercial and industrial development is $220.00 per plumbing fixture unit inside the city; the total scales with the building's fixture-unit count. Outside city limits the rate is $275.00 per fixture unit.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Nogales): $6,965.00 one-time (≈ $6,965.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Nogales Santa Cruz County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Santa Cruz County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Nogales Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Nogales Impact Fee FAQs

What are the total impact fees for a single-family home in Nogales, Arizona?

A new single-family home in Nogales pays $4,436.00 per unit in combined impact fees (rates sourced August 13, 2026).

How much are commercial impact fees in Nogales?

Commercial development in Nogales pays no per-square-foot impact fees, but owes $6,965.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Nogales charge its own impact fees?

Yes. Nogales levies its own municipal impact or utility fees. Santa Cruz County does not currently add county-level impact fees inside Nogales. The schedule on this page shows every fee that applies to development in Nogales.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Santa Cruz County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000