Camp Verde Impact Fees by Project Type
Camp Verde: Single-Family Impact Fees
A new single-family home in Camp Verde pays $5,750.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capacity Fee — Town of Camp Verde, 5/8" meter ($4,000.00) and Sewer Capacity Fee (Town of Camp Verde) ($1,750.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Camp Verde Impact Fee Schedule
- Water Capacity Fee — Town of Camp Verde, 5/8" meter$4,000.00Town of Camp VerdeCamp Verde charges a one-time in-town water capacity fee by meter size under its FY26 fee schedule effective July 1, 2025: $4,000 for a 5/8 inch meter. Connections outside town limits pay 150% of the in-town fee, and the service line and meter installation is charged separately. Lots in the Verde Lakes area east of the Verde River are served by Verde Lakes Water Corporation, which charges no capacity fee; choose that provider in the list.
- Sewer Capacity Fee (Town of Camp Verde)$1,750.00Town of Camp VerdeCamp Verde charges a one-time sewer connection fee of $1,750 for a single-family home under its FY26 fee schedule effective July 1, 2025. The town plans to amend its sewer capacity fees after a pending rate study.
- City Development Impact Fee (Town of Camp Verde)$0.00Town of Camp VerdeCamp Verde does not collect development impact fees. Its development fee article remains in the town code, but collection of all development fees has been suspended since January 7, 2012 (Ordinance 2011-A378).
- County Impact Fee (Yavapai County - Camp Verde)$0.00Yavapai CountyYavapai County charges no county development impact fee. Its only one, a roadway development fee, was repealed effective December 1, 2020 (Ordinance 2020-1).
Where in Yavapai County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Camp Verde: Multifamily Impact Fees
A new multifamily unit in Camp Verde pays $5,750.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capacity Fee (MF) — Town of Camp Verde, 5/8" meter ($4,000.00) and Sewer Capacity Fee (Town of Camp Verde, MF) ($1,750.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Camp Verde Impact Fee Schedule
- Water Capacity Fee (MF) — Town of Camp Verde, 5/8" meter$4,000.00Town of Camp VerdeCamp Verde charges a one-time in-town water capacity fee by meter size under its FY26 fee schedule effective July 1, 2025, with no separate multifamily rate: $4,000 for a 5/8 inch meter, rising with the meter size a building needs. Connections outside town limits pay 150%. Lots in the Verde Lakes area east of the Verde River are served by Verde Lakes Water Corporation, which charges no capacity fee; choose that provider in the list.
- Sewer Capacity Fee (Town of Camp Verde, MF)$1,750.00Town of Camp VerdeCamp Verde charges a one-time sewer connection (capacity) fee of $1,750 per residential unit for multi-family buildings under the Town's FY26 fee schedule, effective July 1, 2025.
- City Development Impact Fee (Town of Camp Verde, MF)$0.00Town of Camp VerdeCamp Verde does not collect development impact fees. Its development fee article remains in the town code, but collection of all development fees has been suspended since January 7, 2012 (Ordinance 2011-A378).
- County Impact Fee (Yavapai County - Camp Verde, MF)$0.00Yavapai CountyYavapai County charges no county development impact fee. Its only one, a roadway development fee, was repealed effective December 1, 2020 (Ordinance 2020-1).
Where in Yavapai County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Camp Verde: Commercial Impact Fees
Commercial development in Camp Verde pays no per-square-foot impact fees, but owes $10,027.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).
For a 50,000 sq ft building, that comes to about $10,027.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee — Town of Camp Verde, 1" meter ($8,277.00 one-time) and Wastewater Connection (Capacity) Fee (Town of Camp Verde) ($1,750.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Camp Verde Impact Fee Schedule
- Water Capacity Fee — Town of Camp Verde, 1" meter$8,277.00 one-timeTown of Camp VerdeTown of Camp Verde water capacity fee, FY26 Fee Schedule effective 7/1/2025, charged once per new connection by meter size (1" shown; 5/8" and 3/4" $4,000 up to $400,308 for an 8" or larger turbine meter). One ladder applies to every customer class. Out-of-town connections pay 150% of the in-town amount. Service line and meter installation (1" $700) and inspection ($150 per hour, 2-hour minimum, for nonresidential) are charged separately. Parcels east of the Verde River served by Verde Lakes Water Corporation pay no capacity fee; choose it in the list.
- Wastewater Connection (Capacity) Fee (Town of Camp Verde)$1,750.00 one-timeTown of Camp VerdeTown of Camp Verde wastewater connection (capacity) fee, FY26 Fee Schedule effective 7/1/2025. Commercial connections pay by use: retail and warehouse or manufacturing $0.25 per sq ft, office $0.50 per sq ft, each with a $1,750 minimum; restaurants and bars $30 per seat; hotels, motels, hospitals and care facilities $350 per room ($1,750 per room with a kitchen). The $1,750 minimum is shown; a 50,000 sq ft retail building pays $12,500. Inspection is billed at $150 per hour with a 2-hour minimum.
- City Development Impact Fee (Town of Camp Verde, Commercial)$0.00Town of Camp VerdeThe Town of Camp Verde has suspended collection of all municipal development impact fees since January 7, 2012 (Ordinance 2011-A378), so no town impact fee applies to commercial construction.
- County Development Impact Fee (Yavapai County, Commercial)$0.00Yavapai CountyYavapai County does not levy county development impact fees.
Where in Yavapai County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Camp Verde: Industrial Impact Fees
Industrial development in Camp Verde pays no per-square-foot impact fees, but owes $10,027.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).
For a 50,000 sq ft building, that comes to about $10,027.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee — Town of Camp Verde, 1" meter ($8,277.00 one-time) and Wastewater Connection (Capacity) Fee (Town of Camp Verde) ($1,750.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Camp Verde Impact Fee Schedule
- Water Capacity Fee — Town of Camp Verde, 1" meter$8,277.00 one-timeTown of Camp VerdeTown of Camp Verde water capacity fee, FY26 Fee Schedule effective 7/1/2025, charged once per new connection by meter size (1" shown; 5/8" and 3/4" $4,000 up to $400,308 for an 8" or larger turbine meter). One ladder applies to every customer class. Out-of-town connections pay 150% of the in-town amount. Service line and meter installation (1" $700) and inspection ($150 per hour, 2-hour minimum, for nonresidential) are charged separately. Parcels east of the Verde River served by Verde Lakes Water Corporation pay no capacity fee; choose it in the list.
- Wastewater Connection (Capacity) Fee (Town of Camp Verde)$1,750.00 one-timeTown of Camp VerdeTown of Camp Verde wastewater connection (capacity) fee, FY26 Fee Schedule effective 7/1/2025. Commercial connections pay by use: retail and warehouse or manufacturing $0.25 per sq ft, office $0.50 per sq ft, each with a $1,750 minimum; restaurants and bars $30 per seat; hotels, motels, hospitals and care facilities $350 per room ($1,750 per room with a kitchen). The $1,750 minimum is shown; a 50,000 sq ft retail building pays $12,500. Inspection is billed at $150 per hour with a 2-hour minimum.
- City Development Impact Fee (Town of Camp Verde, Industrial)$0.00Town of Camp VerdeThe Town of Camp Verde has suspended collection of all municipal development impact fees since January 7, 2012 (Ordinance 2011-A378), so no town impact fee applies to industrial construction.
- County Development Impact Fee (Yavapai County, Industrial)$0.00Yavapai CountyYavapai County does not levy county development impact fees.
Where in Yavapai County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Camp Verde: Office Impact Fees
Office development in Camp Verde pays no per-square-foot impact fees, but owes $10,027.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).
For a 25,000 sq ft building, that comes to about $10,027.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee — Town of Camp Verde, 1" meter ($8,277.00 one-time) and Wastewater Connection (Capacity) Fee (Town of Camp Verde) ($1,750.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Camp Verde Impact Fee Schedule
- Water Capacity Fee — Town of Camp Verde, 1" meter$8,277.00 one-timeTown of Camp VerdeTown of Camp Verde water capacity fee, FY26 Fee Schedule effective 7/1/2025, charged once per new connection by meter size (1" shown; 5/8" and 3/4" $4,000 up to $400,308 for an 8" or larger turbine meter). One ladder applies to every customer class. Out-of-town connections pay 150% of the in-town amount. Service line and meter installation (1" $700) and inspection ($150 per hour, 2-hour minimum, for nonresidential) are charged separately. Parcels east of the Verde River served by Verde Lakes Water Corporation pay no capacity fee; choose it in the list.
- Wastewater Connection (Capacity) Fee (Town of Camp Verde)$1,750.00 one-timeTown of Camp VerdeTown of Camp Verde wastewater connection (capacity) fee, FY26 Fee Schedule effective 7/1/2025. Commercial connections pay by use: retail and warehouse or manufacturing $0.25 per sq ft, office $0.50 per sq ft, each with a $1,750 minimum; restaurants and bars $30 per seat; hotels, motels, hospitals and care facilities $350 per room ($1,750 per room with a kitchen). The $1,750 minimum is shown; a 50,000 sq ft retail building pays $12,500. Inspection is billed at $150 per hour with a 2-hour minimum.
- City Development Impact Fee (Town of Camp Verde, Office)$0.00Town of Camp VerdeThe Town of Camp Verde has suspended collection of all municipal development impact fees since January 7, 2012 (Ordinance 2011-A378), so no town impact fee applies to office construction.
- County Development Impact Fee (Yavapai County, Office)$0.00Yavapai CountyYavapai County does not levy county development impact fees.
Where in Yavapai County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Camp Verde Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Camp Verde Impact Fee FAQs
What are the total impact fees for a single-family home in Camp Verde, Arizona?
A new single-family home in Camp Verde pays $5,750.00 per unit in combined impact fees (rates sourced October 15, 2026).
How much are commercial impact fees in Camp Verde?
Commercial development in Camp Verde pays no per-square-foot impact fees, but owes $10,027.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Camp Verde charge its own impact fees?
Yes. Camp Verde levies its own municipal impact or utility fees. Yavapai County does not currently add county-level impact fees inside Camp Verde. The schedule on this page shows every fee that applies to development in Camp Verde.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.