IMPACTFEES.ORG

Arcadia, Florida Impact Fees

Arcadia applies its own fee schedule. DeSoto County does not currently add county-level impact fees inside city limits. A new single-family home pays $1,118.50 per unit (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Arcadia impact fees by project type

Arcadia: Single-Family Impact Fees

A new single-family home in Arcadia pays $1,118.50 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

Water Connection Fee (City of Arcadia) and Sewer Connection Fee (City of Arcadia) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$482.50
  • Water Connection Fee (City of Arcadia)
    City of Arcadia
    Amount from the City of Arcadia's own website (FAQ, Systems Department): residential water connection fee $482.50 inside city limits; $1,500 for county areas served by the City but outside the corporate limits. Code Sec. 102-42 states all utility rates/fees are set by council resolution on file with the city recorder — the adopting resolution is not posted, so this figure is entered from the City's published FAQ rather than an adopted schedule; Unconfirmed remains checked. The posted 2021 Water/Sewer Rate Schedule (eff. 10/1/2021) covers monthly base + volumetric rates only, no connection fees. A Water Rate Study Workshop is set for 8/6/2026 — re-check after. Confirm with City of Arcadia Utilities/Systems: 863-494-1626.
    $482.50Requires confirmation
Sewer$636.00
  • Sewer Connection Fee (City of Arcadia)
    City of Arcadia
    Amount from the City of Arcadia's own website (FAQ, Systems Department): residential sewer connection fee $636.00 inside city limits; $3,500 for county areas served by the City but outside the corporate limits. Code Sec. 102-32 references a sewer connection charge; Sec. 102-42 sets all rates by council resolution on file with the city recorder — the adopting resolution is not posted, so this figure comes from the City's published FAQ rather than an adopted schedule; Unconfirmed remains checked. The posted 2021 Water/Sewer Rate Schedule (eff. 10/1/2021) covers monthly rates only. Water Rate Study Workshop set for 8/6/2026 — re-check after. Confirm with City of Arcadia Utilities/Systems: 863-494-1626.
    $636.00Requires confirmation
City$0.00
  • City Impact Fee (City of Arcadia)
    City of Arcadia
    No dedicated impact fee chapter found in Arcadia Code of Ordinances (Part II reviewed through Supplement 6, updated Jan 2024). Chapters reviewed include Ch. 30 (Buildings), Ch. 74 (Parks), Ch. 94 (Taxation), Ch. 102 (Utilities), and ULDC. No transportation, parks, fire, or other one-time development impact fees identified. Population ~8,000; consistent with no city impact fee program.
    $0.00
County$0.00
  • County Impact Fee (DeSoto County)
    DeSoto County BOCC
    $0 — CONFIRMED. DeSoto County's transportation and other development impact fees have been suspended since January 1, 2008 per BOCC action; the suspension applies countywide, including within incorporated Arcadia. Re-verified 7/11/2026: no impact-fee schedule or reinstating ordinance is posted by the County, and the County's 2023 Affordable Housing Advisory Committee report continues to list impact fees as suspended. No active county impact fee program. Contact: DeSoto County BOCC / Development Dept.
    $0.00
Total (Arcadia): $1,118.50
Sources last checked July 12, 2026Official fee schedule:City of Arcadia
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in DeSoto County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated DeSoto County$6,885.00
Arcadia$1,118.50this pageIncludes unconfirmed fees

Arcadia: Multifamily Impact Fees

A new multifamily unit in Arcadia pays $1,118.50 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

Sewer Connection Fee (City of Arcadia, MF) and Water Connection Fee (City of Arcadia, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$482.50
  • Water Connection Fee (City of Arcadia, MF)
    City of Arcadia
    City of Arcadia FAQ (Systems Dept) publishes a RESIDENTIAL water connection fee of $482.50 inside city limits ($1,500 outside), and states commercial rates 'vary according to the type of business.' Arcadia's rate schedule treats apartments/multifamily as master-metered or individually attached units in the 'all other' class, so the per-unit MF connection charge is not published; $482.50/unit is entered as a representative figure. Code Sec. 102-42 sets all rates by council resolution (not posted). Water Rate Study Workshop set 8/6/2026. Confirm per-unit MF basis with Utilities/Systems: 863-494-1626.
    $482.50Requires confirmation
Sewer$636.00
  • Sewer Connection Fee (City of Arcadia, MF)
    City of Arcadia
    City of Arcadia FAQ (Systems Dept) publishes a RESIDENTIAL sewer connection fee of $636.00 inside city limits ($3,500 outside); commercial rates 'vary according to the type of business.' Arcadia's rate schedule treats apartments/multifamily as master-metered or individually attached units in the 'all other' class, so the per-unit MF connection charge is not published; $636.00/unit is entered as a representative figure. Code Sec. 102-32/102-42 — rates set by council resolution (not posted). Water Rate Study Workshop set 8/6/2026. Confirm per-unit MF basis with Utilities/Systems: 863-494-1626.
    $636.00Requires confirmation
City$0.00
  • City Impact Fee (City of Arcadia, MF)
    City of Arcadia
    No dedicated impact fee chapter found in Arcadia Code of Ordinances (Part II reviewed through Supplement 6, updated Jan 2024). No transportation, parks, fire, or other one-time development impact fees identified. Population ~8,000; consistent with no city impact fee program.
    $0.00
County$0.00
  • County Impact Fee (DeSoto County, MF)
    DeSoto County BOCC
    $0 — CONFIRMED. DeSoto County's transportation and other development impact fees have been suspended since January 1, 2008 per BOCC action; the suspension applies countywide, including within incorporated Arcadia. Re-verified 7/11/2026: no impact-fee schedule or reinstating ordinance is posted by the County, and the County's 2023 Affordable Housing Advisory Committee report continues to list impact fees as suspended.
    $0.00
Total (Arcadia): $1,118.50
Sources last checked July 12, 2026Official fee schedule:City of Arcadia
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in DeSoto County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated DeSoto County$6,885.00Includes unconfirmed fees
Arcadia$1,118.50this pageIncludes unconfirmed fees

Arcadia: Commercial Impact Fees

Commercial development in Arcadia pays no per-square-foot impact fees (rates sourced July 12, 2026).

Water Connection Fee (City of Arcadia) and Sewer Connection Fee (City of Arcadia) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (City of Arcadia)
    City of Arcadia
    UNCONFIRMED — no nonresidential water connection fee is published anywhere by the City of Arcadia. $0 placeholder; the fee exists but its amount is not public. STILL OPEN after audit re-check 2026-07-12: re-fetched the City FAQ (unchanged — still states verbatim 'Commercial rates vary according to the type of business', residential only: water $482.50 in-city / $1,500 outside) and re-fetched the posted City of Arcadia 2021 Water Sewer Rate Schedule PDF (eff. 10/1/2021) in full — it contains ONLY meter-size monthly base charges and per-1,000-gallon volumetric rates, NO connection/tap fee of any kind. The site's Documents > Utility Rates folder holds no fee-schedule or resolution document with connection fees. Sources exhausted 2026-07-12 (twice): (1) Municode Code Ch. 102 Art. II — Sec. 102-31(b)(2)-(3) mandates business/commercial and industrial connection to the city waterworks, and Sec. 102-42(a) provides that ALL rates, fees and charges 'shall be as prescribed by the city council from time to time by resolution... kept on file by the city recorder for public inspection' — no amounts codified, adopting resolutions not posted online. (2) City FAQ. (3) 2021 posted rate schedule. (4) Web search returns nothing (beware: searches surface Arcadia, CALIFORNIA rate schedules — different city). Note Sec. 102-42(b): users outside municipal boundaries pay an additional 50%. A Water Rate Study Workshop is confirmed for 8/6/2026 (city events calendar) — re-check after. TO CONFIRM: request the current commercial/industrial water connection fee resolution. Contact: City of Arcadia Utilities/Systems Dept 863-494-1626; City Clerk Penny Delaney 863-494-4114 x301 / pdelaney@arcadia-fl.gov.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Arcadia)
    City of Arcadia
    UNCONFIRMED — no nonresidential sewer connection fee is published anywhere by the City of Arcadia. $0 placeholder; the fee exists but its amount is not public. STILL OPEN after audit re-check 2026-07-12: re-fetched the City FAQ (unchanged — still states verbatim 'Commercial rates vary according to the type of business', residential only: sewer $636.00 in-city / $3,500 outside) and re-fetched the posted City of Arcadia 2021 Water Sewer Rate Schedule PDF (eff. 10/1/2021) in full — it contains ONLY meter-size monthly base charges and per-1,000-gallon volumetric rates, NO connection/tap fee of any kind. The site's Documents > Utility Rates folder holds no fee-schedule or resolution document with connection fees. Sources exhausted 2026-07-12 (twice): (1) Municode Code Ch. 102 Art. II — Sec. 102-32 requires connection for 'residential, commercial or industrial use' and provides that council rules 'shall provide for a charge for making any such connections in such reasonable amount as such council may fix and determine'; Sec. 102-42(a) sets all rates/fees by council resolution kept on file with the city recorder — no amounts codified, resolutions not posted. Ch. 102 Art. IV (User Charges for Wastewater Treatment Works) defines a 'nonresidential user' class but sets only MONTHLY rates (Sec. 102-104), not connection fees. (2) City FAQ. (3) 2021 posted rate schedule. (4) Web search returns nothing (beware Arcadia, CALIFORNIA same-name trap). Sec. 102-104(d): users outside corporate boundaries pay an additional 50%. Water Rate Study Workshop confirmed for 8/6/2026 (city events calendar) — re-check after. TO CONFIRM: request the current commercial/industrial sewer connection fee resolution. Contact: City of Arcadia Utilities/Systems Dept 863-494-1626; City Clerk Penny Delaney 863-494-4114 x301 / pdelaney@arcadia-fl.gov.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Arcadia, Commercial)
    City of Arcadia
    $0 — CONFIRMED. The City of Arcadia levies no nonresidential development impact fees. Verified 2026-07-12: the Code of Ordinances contains NO impact fee chapter or article. Ch. 102 (Utilities) sets only water/sewer connection and monthly service charges — utility connection fees are NOT city impact fees and are tracked separately in the Water/Sewer table. Chapters reviewed: Ch. 30 (Buildings), Ch. 34 (Businesses), Ch. 74 (Parks), Ch. 94 (Taxation), Ch. 102 (Utilities), and Part III ULDC — no transportation, parks, fire, police, or other one-time nonres development impact fee identified. Population ~7,400; consistent with no municipal impact fee program. No separately posted development fee schedule exists on arcadia-fl.gov. Contact: City of Arcadia, 863-494-4114.
    $0.00
County$0.00
  • County Impact Fee (DeSoto County, Commercial)
    DeSoto County BOCC
    $0 — CONFIRMED. No DeSoto County impact fee applies inside Arcadia — because the County levies none ANYWHERE (not a municipal-exemption question). Verified independently 2026-07-12 against Code Ch. 10 (Taxation, Assessment and Fees), Supp. 15, codified through Ord. 2025-017 (11/18/2025): the chapter contains NO impact fee article — Articles VIII, X, XI and XII are RESERVED, and every remaining article is a gas tax, sales surtax, ad valorem exemption, tourist tax, or RECURRING special assessment (EMS, street lighting, solid waste — not impact fees). County impact fees suspended countywide since 1/1/2008 by BOCC action; 2023 AHAC report still lists them as suspended; no reinstating ordinance posted. Contact: DeSoto County BOCC / Development Dept. RECHECK each cycle.
    $0.00
Total (Arcadia): $0.00
Sources last checked July 12, 2026Official fee schedules:City of Arcadia DeSoto County BOCC
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in DeSoto County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated DeSoto County$10,241.64*
Arcadia$0.00this pageIncludes unconfirmed fees

Arcadia: Industrial Impact Fees

Industrial development in Arcadia pays no per-square-foot impact fees (rates sourced July 12, 2026).

Water Connection Fee (City of Arcadia) and Sewer Connection Fee (City of Arcadia) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (City of Arcadia)
    City of Arcadia
    UNCONFIRMED — no nonresidential water connection fee is published anywhere by the City of Arcadia. $0 placeholder; the fee exists but its amount is not public. STILL OPEN after audit re-check 2026-07-12: re-fetched the City FAQ (unchanged — still states verbatim 'Commercial rates vary according to the type of business', residential only: water $482.50 in-city / $1,500 outside) and re-fetched the posted City of Arcadia 2021 Water Sewer Rate Schedule PDF (eff. 10/1/2021) in full — it contains ONLY meter-size monthly base charges and per-1,000-gallon volumetric rates, NO connection/tap fee of any kind. The site's Documents > Utility Rates folder holds no fee-schedule or resolution document with connection fees. Sources exhausted 2026-07-12 (twice): (1) Municode Code Ch. 102 Art. II — Sec. 102-31(b)(2)-(3) mandates business/commercial and industrial connection to the city waterworks, and Sec. 102-42(a) provides that ALL rates, fees and charges 'shall be as prescribed by the city council from time to time by resolution... kept on file by the city recorder for public inspection' — no amounts codified, adopting resolutions not posted online. (2) City FAQ. (3) 2021 posted rate schedule. (4) Web search returns nothing (beware: searches surface Arcadia, CALIFORNIA rate schedules — different city). Note Sec. 102-42(b): users outside municipal boundaries pay an additional 50%. A Water Rate Study Workshop is confirmed for 8/6/2026 (city events calendar) — re-check after. TO CONFIRM: request the current commercial/industrial water connection fee resolution. Contact: City of Arcadia Utilities/Systems Dept 863-494-1626; City Clerk Penny Delaney 863-494-4114 x301 / pdelaney@arcadia-fl.gov.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Arcadia)
    City of Arcadia
    UNCONFIRMED — no nonresidential sewer connection fee is published anywhere by the City of Arcadia. $0 placeholder; the fee exists but its amount is not public. STILL OPEN after audit re-check 2026-07-12: re-fetched the City FAQ (unchanged — still states verbatim 'Commercial rates vary according to the type of business', residential only: sewer $636.00 in-city / $3,500 outside) and re-fetched the posted City of Arcadia 2021 Water Sewer Rate Schedule PDF (eff. 10/1/2021) in full — it contains ONLY meter-size monthly base charges and per-1,000-gallon volumetric rates, NO connection/tap fee of any kind. The site's Documents > Utility Rates folder holds no fee-schedule or resolution document with connection fees. Sources exhausted 2026-07-12 (twice): (1) Municode Code Ch. 102 Art. II — Sec. 102-32 requires connection for 'residential, commercial or industrial use' and provides that council rules 'shall provide for a charge for making any such connections in such reasonable amount as such council may fix and determine'; Sec. 102-42(a) sets all rates/fees by council resolution kept on file with the city recorder — no amounts codified, resolutions not posted. Ch. 102 Art. IV (User Charges for Wastewater Treatment Works) defines a 'nonresidential user' class but sets only MONTHLY rates (Sec. 102-104), not connection fees. (2) City FAQ. (3) 2021 posted rate schedule. (4) Web search returns nothing (beware Arcadia, CALIFORNIA same-name trap). Sec. 102-104(d): users outside corporate boundaries pay an additional 50%. Water Rate Study Workshop confirmed for 8/6/2026 (city events calendar) — re-check after. TO CONFIRM: request the current commercial/industrial sewer connection fee resolution. Contact: City of Arcadia Utilities/Systems Dept 863-494-1626; City Clerk Penny Delaney 863-494-4114 x301 / pdelaney@arcadia-fl.gov.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Arcadia, Industrial)
    City of Arcadia
    $0 — CONFIRMED. The City of Arcadia levies no nonresidential development impact fees. Verified 2026-07-12: the Code of Ordinances contains NO impact fee chapter or article. Ch. 102 (Utilities) sets only water/sewer connection and monthly service charges — utility connection fees are NOT city impact fees and are tracked separately in the Water/Sewer table. Chapters reviewed: Ch. 30, Ch. 34, Ch. 74, Ch. 94, Ch. 102, and Part III ULDC — no transportation, parks, fire, police, or other one-time nonres development impact fee identified. No separately posted development fee schedule exists on arcadia-fl.gov. Contact: City of Arcadia, 863-494-4114.
    $0.00
County$0.00
  • County Impact Fee (DeSoto County, Industrial)
    DeSoto County BOCC
    $0 — CONFIRMED. No DeSoto County impact fee applies inside Arcadia — because the County levies none ANYWHERE. Verified independently 2026-07-12 against Code Ch. 10 (Taxation, Assessment and Fees), Supp. 15, codified through Ord. 2025-017 (11/18/2025): NO impact fee article — Articles VIII, X, XI and XII are RESERVED; remaining articles are gas taxes, surtaxes, ad valorem exemptions, tourist tax, and RECURRING special assessments (EMS, street lighting, solid waste — not impact fees). Suspended countywide since 1/1/2008; 2023 AHAC report still lists them as suspended; no reinstating ordinance posted. Contact: DeSoto County BOCC / Development Dept. RECHECK each cycle.
    $0.00
Total (Arcadia): $0.00
Sources last checked July 12, 2026Official fee schedules:City of Arcadia DeSoto County BOCC
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in DeSoto County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated DeSoto County$10,241.64*
Arcadia$0.00this pageIncludes unconfirmed fees

Arcadia: Office Impact Fees

Office development in Arcadia pays no per-square-foot impact fees (rates sourced July 12, 2026).

Water Connection Fee (City of Arcadia) and Sewer Connection Fee (City of Arcadia) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (City of Arcadia)
    City of Arcadia
    UNCONFIRMED — no nonresidential water connection fee is published anywhere by the City of Arcadia. $0 placeholder; the fee exists but its amount is not public. STILL OPEN after audit re-check 2026-07-12: re-fetched the City FAQ (unchanged — still states verbatim 'Commercial rates vary according to the type of business', residential only: water $482.50 in-city / $1,500 outside) and re-fetched the posted City of Arcadia 2021 Water Sewer Rate Schedule PDF (eff. 10/1/2021) in full — it contains ONLY meter-size monthly base charges and per-1,000-gallon volumetric rates, NO connection/tap fee of any kind. The site's Documents > Utility Rates folder holds no fee-schedule or resolution document with connection fees. Sources exhausted 2026-07-12 (twice): (1) Municode Code Ch. 102 Art. II — Sec. 102-31(b)(2)-(3) mandates business/commercial and industrial connection to the city waterworks, and Sec. 102-42(a) provides that ALL rates, fees and charges 'shall be as prescribed by the city council from time to time by resolution... kept on file by the city recorder for public inspection' — no amounts codified, adopting resolutions not posted online. (2) City FAQ. (3) 2021 posted rate schedule. (4) Web search returns nothing (beware: searches surface Arcadia, CALIFORNIA rate schedules — different city). Note Sec. 102-42(b): users outside municipal boundaries pay an additional 50%. A Water Rate Study Workshop is confirmed for 8/6/2026 (city events calendar) — re-check after. TO CONFIRM: request the current commercial/industrial water connection fee resolution. Contact: City of Arcadia Utilities/Systems Dept 863-494-1626; City Clerk Penny Delaney 863-494-4114 x301 / pdelaney@arcadia-fl.gov.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Arcadia)
    City of Arcadia
    UNCONFIRMED — no nonresidential sewer connection fee is published anywhere by the City of Arcadia. $0 placeholder; the fee exists but its amount is not public. STILL OPEN after audit re-check 2026-07-12: re-fetched the City FAQ (unchanged — still states verbatim 'Commercial rates vary according to the type of business', residential only: sewer $636.00 in-city / $3,500 outside) and re-fetched the posted City of Arcadia 2021 Water Sewer Rate Schedule PDF (eff. 10/1/2021) in full — it contains ONLY meter-size monthly base charges and per-1,000-gallon volumetric rates, NO connection/tap fee of any kind. The site's Documents > Utility Rates folder holds no fee-schedule or resolution document with connection fees. Sources exhausted 2026-07-12 (twice): (1) Municode Code Ch. 102 Art. II — Sec. 102-32 requires connection for 'residential, commercial or industrial use' and provides that council rules 'shall provide for a charge for making any such connections in such reasonable amount as such council may fix and determine'; Sec. 102-42(a) sets all rates/fees by council resolution kept on file with the city recorder — no amounts codified, resolutions not posted. Ch. 102 Art. IV (User Charges for Wastewater Treatment Works) defines a 'nonresidential user' class but sets only MONTHLY rates (Sec. 102-104), not connection fees. (2) City FAQ. (3) 2021 posted rate schedule. (4) Web search returns nothing (beware Arcadia, CALIFORNIA same-name trap). Sec. 102-104(d): users outside corporate boundaries pay an additional 50%. Water Rate Study Workshop confirmed for 8/6/2026 (city events calendar) — re-check after. TO CONFIRM: request the current commercial/industrial sewer connection fee resolution. Contact: City of Arcadia Utilities/Systems Dept 863-494-1626; City Clerk Penny Delaney 863-494-4114 x301 / pdelaney@arcadia-fl.gov.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Arcadia, Office)
    City of Arcadia
    $0 — CONFIRMED. The City of Arcadia levies no nonresidential development impact fees. Verified 2026-07-12: the Code of Ordinances contains NO impact fee chapter or article. Ch. 102 (Utilities) sets only water/sewer connection and monthly service charges — utility connection fees are NOT city impact fees and are tracked separately in the Water/Sewer table. Chapters reviewed: Ch. 30, Ch. 34, Ch. 74, Ch. 94, Ch. 102, and Part III ULDC — no transportation, parks, fire, police, or other one-time nonres development impact fee identified. No separately posted development fee schedule exists on arcadia-fl.gov. Contact: City of Arcadia, 863-494-4114.
    $0.00
County$0.00
  • County Impact Fee (DeSoto County, Office)
    DeSoto County BOCC
    $0 — CONFIRMED. No DeSoto County impact fee applies inside Arcadia — because the County levies none ANYWHERE. Verified independently 2026-07-12 against Code Ch. 10 (Taxation, Assessment and Fees), Supp. 15, codified through Ord. 2025-017 (11/18/2025): NO impact fee article — Articles VIII, X, XI and XII are RESERVED; remaining articles are gas taxes, surtaxes, ad valorem exemptions, tourist tax, and RECURRING special assessments (EMS, street lighting, solid waste — not impact fees). Suspended countywide since 1/1/2008; 2023 AHAC report still lists them as suspended; no reinstating ordinance posted. Contact: DeSoto County BOCC / Development Dept. RECHECK each cycle.
    $0.00
Total (Arcadia): $0.00
Sources last checked July 12, 2026Official fee schedules:City of Arcadia DeSoto County BOCC
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in DeSoto County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated DeSoto County$10,241.64*
Arcadia$0.00this pageIncludes unconfirmed fees

Estimate your project in Arcadia

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Arcadia, Florida?

A new single-family home in Arcadia pays $1,118.50 per unit in combined impact fees (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Arcadia?

Arcadia does not currently levy impact fees on commercial development.

Does Arcadia charge its own impact fees?

Yes. Arcadia levies its own municipal impact or utility fees. DeSoto County does not currently add county-level impact fees inside Arcadia. The schedule on this page shows every fee that applies to development in Arcadia.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the DeSoto County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000