Jennings, Florida Impact Fees

Jennings applies its own fee schedule. Hamilton County does not currently add county-level impact fees inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The full breakdown is below.

Jennings impact fees by project type

Jennings: Single-Family Impact Fees

Jennings has no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Water Connection Fee (Town of Jennings) and Sewer Connection Fee (Town of Jennings) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Jennings)
    Town of Jennings
    The Town of Jennings operates both a municipal water system and a centralized sanitary sewer system - its land development regulations require connection where the town's centralized sanitary sewer system is accessible and treat existing septic tanks as interim. No connection or tap fee amount is published: the town has no functioning website or online ordinance library, its only publicly posted documents are the NCFRPC-hosted comprehensive plan and land development regulations (neither of which sets utility charges), and the town directs record requests to town hall. Not a documented zero - the town runs the utility, so a charge for new service almost certainly exists; the number simply is not published. Water row. 8/5/2026.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Jennings)
    Town of Jennings
    The Town of Jennings operates both a municipal water system and a centralized sanitary sewer system - its land development regulations require connection where the town's centralized sanitary sewer system is accessible and treat existing septic tanks as interim. No connection or tap fee amount is published: the town has no functioning website or online ordinance library, its only publicly posted documents are the NCFRPC-hosted comprehensive plan and land development regulations (neither of which sets utility charges), and the town directs record requests to town hall. Not a documented zero - the town runs the utility, so a charge for new service almost certainly exists; the number simply is not published. Sewer row. 8/5/2026.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Jennings) — None
    Town of Jennings
    Town of Jennings has no impact fees. The town's adopted Land Development Regulations (hosted by the North Central Florida Regional Planning Council, which prepares and hosts Jennings' comprehensive plan and LDRs) contain no impact fee provision - a full-text search returns no occurrence of 'impact fee', 'connection fee' or 'tap fee'; the 35 hits on 'impact' are all about adverse impacts on adjacent uses. The town's adopted comprehensive plan likewise contains no impact fee reference. Jennings (2020 population 749) maintains no ordinance library or fee schedule online; its only published land development documents contain no impact fee. 8/5/2026.
    $0.00
County$0.00
  • County Impact Fees (Hamilton County, via Jennings) — None
    Hamilton County
    Hamilton County has NO impact fee program — nothing collected within Jennings. Confirmed against the county's current adopted Land Use Fee Schedule, Resolution No. 2026-14 (adopted 4/21/2026; supersedes Res. 2018-004): the complete schedule is application/permit cost-recovery fees only (comp-plan amendment $2,000, rezoning $1,000, variance $500, major subdivision $3,000, special permits) — no impact, mobility, or school fee. County Building Dept issues permits inside Jennings. Re-checked 7/23/2026.
    $0.00
Total (Jennings): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Jennings Hamilton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Hamilton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jennings: Multifamily Impact Fees

Jennings has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Sewer Connection Fee (Town of Jennings, MF) and Water Connection Fee (Town of Jennings, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Jennings, MF)
    Town of Jennings
    The Town of Jennings operates both a municipal water system and a centralized sanitary sewer system - its land development regulations require connection where the town's centralized sanitary sewer system is accessible and treat existing septic tanks as interim. No connection or tap fee amount is published: the town has no functioning website or online ordinance library, its only publicly posted documents are the NCFRPC-hosted comprehensive plan and land development regulations (neither of which sets utility charges), and the town directs record requests to town hall. Not a documented zero - the town runs the utility, so a charge for new service almost certainly exists; the number simply is not published. Water row. 8/5/2026.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Jennings, MF)
    Town of Jennings
    The Town of Jennings operates both a municipal water system and a centralized sanitary sewer system - its land development regulations require connection where the town's centralized sanitary sewer system is accessible and treat existing septic tanks as interim. No connection or tap fee amount is published: the town has no functioning website or online ordinance library, its only publicly posted documents are the NCFRPC-hosted comprehensive plan and land development regulations (neither of which sets utility charges), and the town directs record requests to town hall. Not a documented zero - the town runs the utility, so a charge for new service almost certainly exists; the number simply is not published. Sewer row. 8/5/2026.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Jennings, MF) — None
    Town of Jennings
    Town of Jennings has no impact fees. The town's adopted Land Development Regulations (hosted by the North Central Florida Regional Planning Council, which prepares and hosts Jennings' comprehensive plan and LDRs) contain no impact fee provision - a full-text search returns no occurrence of 'impact fee', 'connection fee' or 'tap fee'; the 35 hits on 'impact' are all about adverse impacts on adjacent uses. The town's adopted comprehensive plan likewise contains no impact fee reference. Jennings (2020 population 749) maintains no ordinance library or fee schedule online; its only published land development documents contain no impact fee. 8/5/2026.
    $0.00
County$0.00
  • County Impact Fees (Hamilton County, via Jennings, MF) — None
    Hamilton County
    Hamilton County has NO impact fee program — nothing collected within Jennings. Confirmed against Resolution No. 2026-14, the county's current adopted Land Use Fee Schedule (adopted 4/21/2026): application/permit cost-recovery fees only — no impact, mobility, or school fee, and no MF-specific rate. Re-checked 7/23/2026.
    $0.00
Total (Jennings): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Jennings Hamilton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Hamilton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jennings: Commercial Impact Fees

Commercial development in Jennings pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection Fee (Town of Jennings) and Water Connection Fee (Town of Jennings) are set by the utility and not published online. City Impact Fees (Town of Jennings, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Jennings)
    Town of Jennings
    Town of Jennings operates its own water supply system. Audit 7/12/2026 located the Town's adopted Land Development Regulations (11/5/1992, NCFRPC-hosted, 379 pp.) — full text extracted: ZERO occurrences of 'connection fee', 'tap fee' or 'capacity fee', so the LDR sets no W/S capital charge. Beyond that the Town publishes nothing: no municipal website, no codifier (absent from the Municode FL client list), no rate sheet, ordinance or tariff online, and no nonresidential meter-size table in the public record. Amount is set administratively and is unpublished. $0 placeholder, Unconfirmed. Verify: Town Hall 386-938-4131.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Jennings)
    Town of Jennings
    Town of Jennings operates its own sewage treatment. Audit 7/12/2026 located the Town's adopted Land Development Regulations (11/5/1992, NCFRPC-hosted, 379 pp.) — full text extracted: ZERO occurrences of 'connection fee', 'tap fee' or 'capacity fee', so the LDR sets no W/S capital charge. The Town publishes nothing else: no municipal website, no codifier, no rate sheet or ordinance online, no nonresidential meter-size or ERU table in the public record. Amount set administratively, unpublished. $0 placeholder, Unconfirmed. Verify: Town Hall 386-938-4131.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Jennings, Commercial)
    Town of Jennings
    Town of Jennings (~750 pop.) levies no nonresidential impact/development fee. Audit 7/12/2026 located the Town's adopted Land Development Regulations (adopted 11/5/1992, NCFRPC-hosted) — 379 pages, full text extracted, ZERO occurrences of 'impact fee'. Still Unconfirmed because that LDR is 34 years old and the Town publishes nothing current: no municipal website, no codifier (absent from the Municode FL client list), no posted ordinance list or fee schedule anywhere online, so a post-1992 stand-alone impact-fee ordinance cannot be ruled out on the record. Hamilton County Building Dept issues permits inside Jennings and the county levies no impact fees. Verify: Town Hall 386-938-4131.
    Requires confirmation
County$0.00
  • County Impact Fees (Town of Jennings, Commercial)
    Hamilton County
    Hamilton County levies NO impact fee of any kind — confirmed $0, nothing collected inside Jennings. Verified 7/12/2026: county LDR (complete land development code) has 16 articles and NO impact-fee article — only the Proportionate Fair-Share Transportation Program (§14.17), a negotiated F.S. 163.3180 mitigation mechanism with no published rate. County's current adopted Land Use Fee Schedule (Res. 2026-14, adopted 4/21/2026, supersedes Res. 2018-004) is application/permit cost-recovery only. Contact: Land Use Admin 386-792-0507.
    $0.00
Total (Jennings): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Jennings Hamilton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Hamilton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jennings: Industrial Impact Fees

Industrial development in Jennings pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection Fee (Town of Jennings) and Water Connection Fee (Town of Jennings) are set by the utility and not published online. City Impact Fees (Town of Jennings, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Jennings)
    Town of Jennings
    Town of Jennings operates its own water supply system. Audit 7/12/2026 located the Town's adopted Land Development Regulations (11/5/1992, NCFRPC-hosted, 379 pp.) — full text extracted: ZERO occurrences of 'connection fee', 'tap fee' or 'capacity fee', so the LDR sets no W/S capital charge. Beyond that the Town publishes nothing: no municipal website, no codifier (absent from the Municode FL client list), no rate sheet, ordinance or tariff online, and no nonresidential meter-size table in the public record. Amount is set administratively and is unpublished. $0 placeholder, Unconfirmed. Verify: Town Hall 386-938-4131.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Jennings)
    Town of Jennings
    Town of Jennings operates its own sewage treatment. Audit 7/12/2026 located the Town's adopted Land Development Regulations (11/5/1992, NCFRPC-hosted, 379 pp.) — full text extracted: ZERO occurrences of 'connection fee', 'tap fee' or 'capacity fee', so the LDR sets no W/S capital charge. The Town publishes nothing else: no municipal website, no codifier, no rate sheet or ordinance online, no nonresidential meter-size or ERU table in the public record. Amount set administratively, unpublished. $0 placeholder, Unconfirmed. Verify: Town Hall 386-938-4131.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Jennings, Industrial)
    Town of Jennings
    Town of Jennings levies no nonresidential impact/development fee. Audit 7/12/2026 located the Town's adopted Land Development Regulations (adopted 11/5/1992, NCFRPC-hosted) — 379 pages, full text extracted, ZERO occurrences of 'impact fee'. Still Unconfirmed: the LDR is 34 years old and the Town publishes nothing current (no website, no codifier, no posted ordinance list or fee schedule), so a later stand-alone impact-fee ordinance cannot be ruled out on the record. County Building Dept issues permits inside Jennings; county levies no impact fees. Verify: Town Hall 386-938-4131.
    Requires confirmation
County$0.00
  • County Impact Fees (Town of Jennings, Industrial)
    Hamilton County
    Hamilton County levies NO impact fee of any kind — confirmed $0, nothing collected inside Jennings. Verified 7/12/2026 against the county LDR (no impact-fee article; only §14.17 proportionate fair-share, no published rate) and the adopted Land Use Fee Schedule Res. 2026-14 (cost-recovery only). Contact: Land Use Admin 386-792-0507.
    $0.00
Total (Jennings): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Jennings Hamilton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Hamilton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jennings: Office Impact Fees

Office development in Jennings pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection Fee (Town of Jennings) and Water Connection Fee (Town of Jennings) are set by the utility and not published online. City Impact Fees (Town of Jennings, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Jennings)
    Town of Jennings
    Town of Jennings operates its own water supply system. Audit 7/12/2026 located the Town's adopted Land Development Regulations (11/5/1992, NCFRPC-hosted, 379 pp.) — full text extracted: ZERO occurrences of 'connection fee', 'tap fee' or 'capacity fee', so the LDR sets no W/S capital charge. Beyond that the Town publishes nothing: no municipal website, no codifier (absent from the Municode FL client list), no rate sheet, ordinance or tariff online, and no nonresidential meter-size table in the public record. Amount is set administratively and is unpublished. $0 placeholder, Unconfirmed. Verify: Town Hall 386-938-4131.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Jennings)
    Town of Jennings
    Town of Jennings operates its own sewage treatment. Audit 7/12/2026 located the Town's adopted Land Development Regulations (11/5/1992, NCFRPC-hosted, 379 pp.) — full text extracted: ZERO occurrences of 'connection fee', 'tap fee' or 'capacity fee', so the LDR sets no W/S capital charge. The Town publishes nothing else: no municipal website, no codifier, no rate sheet or ordinance online, no nonresidential meter-size or ERU table in the public record. Amount set administratively, unpublished. $0 placeholder, Unconfirmed. Verify: Town Hall 386-938-4131.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Jennings, Office)
    Town of Jennings
    Town of Jennings levies no nonresidential impact/development fee. Audit 7/12/2026 located the Town's adopted Land Development Regulations (adopted 11/5/1992, NCFRPC-hosted) — 379 pages, full text extracted, ZERO occurrences of 'impact fee'. Still Unconfirmed: the LDR is 34 years old and the Town publishes nothing current (no website, no codifier, no posted ordinance list or fee schedule), so a later stand-alone impact-fee ordinance cannot be ruled out on the record. County Building Dept issues permits inside Jennings; county levies no impact fees. Verify: Town Hall 386-938-4131.
    Requires confirmation
County$0.00
  • County Impact Fees (Town of Jennings, Office)
    Hamilton County
    Hamilton County levies NO impact fee of any kind — confirmed $0, nothing collected inside Jennings. Verified 7/12/2026 against the county LDR (no impact-fee article; only §14.17 proportionate fair-share, no published rate) and the adopted Land Use Fee Schedule Res. 2026-14 (cost-recovery only). Contact: Land Use Admin 386-792-0507.
    $0.00
Total (Jennings): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Jennings Hamilton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Hamilton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Jennings

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Frequently asked questions

How much are commercial impact fees in Jennings?

Jennings does not currently levy impact fees on commercial development.

Does Jennings charge its own impact fees?

Yes. Jennings levies its own municipal impact or utility fees. Hamilton County does not currently add county-level impact fees inside Jennings. The schedule on this page shows every fee that applies to development in Jennings.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hamilton County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000