IMPACTFEES.ORG

Sebring, Florida Impact Fees

Sebring applies its own fee schedule: municipal fees plus the Highlands County-levied fees that apply inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The full breakdown is below.

Sebring impact fees by project type

Sebring: Single-Family Impact Fees

Sebring has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.

Sewer Capacity Fee (City of Sebring) and Water Capacity Fee (City of Sebring) are set by the utility and not published online. County Impact Fee (Highlands County) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Capacity Fee (City of Sebring)
    City of Sebring
    Sebring Code §23-36 imposes a water 'system development charge' based on meter size and ERC per AWWA, but sets no amounts; §23-66 provides all water rates/fees are 'as established by resolution.' Res. 2025-23 (Oct 7, 2025) raised new-service fees 5% eff. 11/1/2025; no rate/fee schedule posted online (re-checked 7/12/2026). VERIFY current water SDC: Utilities Dept (863) 471-5112.
    Requires confirmation
Sewer$0.00
  • Sewer Capacity Fee (City of Sebring)
    City of Sebring
    Sebring Code Ch. 23 sets NO dollar amounts — §23-66 (and the sewer article) provide that all rates, fees and charges are 'as established by resolution.' Res. 2025-23 (Oct 7, 2025) raised sewer rates 20% and new-service fees 5% eff. 11/1/2025, but the city posts no rate/fee schedule online (mysebring.com Utilities page and FAQs carry none; re-checked 7/12/2026). VERIFY current sewer capacity/connection charge: Utilities Dept (863) 471-5112 (Bob Boggus, Utilities Director).
    Requires confirmation
City$0.00
  • City Impact Fee (City of Sebring)
    City of Sebring
    Confirmed $0: Sebring's Code of Ordinances has no impact-fee chapter (full chapter list re-checked 7/12/2026; Ch. 23 Utilities carries only water/sewer charges, set by resolution). No city development impact fees. County Ch.13 impact fees are collected by the county on permits within the city (see County record).
    $0.00
County$0.00
  • County Impact Fee (Highlands County)
    Highlands County
    Code Ch. 13 (Ord. 05-06-44) county impact fees are collected by the county on permits it issues, including inside municipalities (§13-51). §13-29(3) (Ord. 24-25-014) suspended all §§13-21—13-28 fees 'through and including June 30, 2026' — that suspension has now LAPSED (Municode current 7/1/2026; no further extension codified). New impact fee study went to BCC workshop 5/12/2026; NO fee/rate adopted as of 7/12/2026. $0 + Unconfirmed. VERIFY: Development Services (863) 402-6650 / lsauls@highlandsfl.gov.
    Requires confirmation
Total (Sebring): $0.00
Sources last checked July 13, 2026Official fee schedules:City of Sebring Highlands County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Highlands County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sebring: Multifamily Impact Fees

Sebring has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.

Sewer Capacity Fee (City of Sebring, MF) and Water Capacity Fee (City of Sebring, MF) are set by the utility and not published online. County Impact Fee (Highlands County, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Capacity Fee (City of Sebring, MF)
    City of Sebring
    Sebring Code §23-36 imposes a meter-size/ERC-based water system development charge but sets no amounts (§23-66: rates by resolution). Res. 2025-23 (10/7/2025) raised new-service fees 5% eff. 11/1/2025; no schedule posted online (re-checked 7/12/2026), and no MF per-unit basis is published. VERIFY: Utilities Dept (863) 471-5112.
    Requires confirmation
Sewer$0.00
  • Sewer Capacity Fee (City of Sebring, MF)
    City of Sebring
    Sebring Code Ch. 23 sets no dollar amounts — all utility rates/fees are 'as established by resolution' (§23-66). Res. 2025-23 (10/7/2025) raised sewer rates 20% and new-service fees 5% eff. 11/1/2025; no schedule posted online (re-checked 7/12/2026), and no MF per-unit basis is published. VERIFY: Utilities Dept (863) 471-5112.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Sebring, MF)
    City of Sebring
    Confirmed $0: Sebring's code has no impact-fee chapter (full chapter list re-checked 7/12/2026). No city development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Highlands County, MF)
    Highlands County
    Code Ch. 13 (Ord. 05-06-44) county impact fees carry a separate multifamily rate column. §13-29(3) (Ord. 24-25-014) suspended all §§13-21—13-28 fees 'through and including June 30, 2026' — that suspension has now LAPSED (Municode current 7/1/2026; no further extension codified). New impact fee study went to BCC workshop 5/12/2026; NO fee/rate adopted as of 7/12/2026. $0 + Unconfirmed. VERIFY: Development Services (863) 402-6650 / lsauls@highlandsfl.gov.
    Requires confirmation
Total (Sebring): $0.00
Sources last checked July 13, 2026Official fee schedules:City of Sebring Highlands County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Highlands County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sebring: Commercial Impact Fees

Commercial development in Sebring pays no per-square-foot impact fees, but owes $5,408.26 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to at least $5,408.26. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Sebring) — 1" meter ($2,900.50 one-time), Water Connection Fee (City of Sebring) — 1" meter ($1,688.01 one-time) and Water Meter Setting Charge (City of Sebring) — 1" meter ($819.75 one-time).

County Impact Fee (Highlands County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,507.76 one-time
  • Water Connection Fee (City of Sebring) — 1" meter
    City of Sebring Utilities Department
    CANONICAL DEFAULT (1" meter). RESOLVED ON AUDIT 7/13/2026 — amount previously $0/Unconfirmed. Source: City of Sebring Resolution 2025-23, adopted at the 10/7/2025 Council public hearing (F.S. 180.191), effective 11/1/2025, §II.1.F 'Commercial Connection Fees', Single Service, INSIDE City. The resolution is not posted on the city website or in Municode (Code §23-66 / §23-141 set all rates by resolution) — it exists only as pages 136–141 of the 10/7/2025 Council agenda packet (image-only scan). Full inside-city commercial single-service ladder (equivalent multiplier in parens): 5/8" & 3/4" (1.0) $998.12; 1" (1.7) $1,688.01; 1.5" (3.5) $3,492.77; 2" (6.7) $6,700.91; 3" (15.0) $14,998.02; 4" (27.0) $26,991.21; 6" (60.0) $59,886.98; 8" (114.0) $113,785.27; 10" set by the Utilities Director. Outside-city column is separate (1" = $2,280.86) and a Master Meter column applies to multi-unit services (1" inside = $5,426.03). The commercial single-service ladder is identical to the §II.1.B single-family ladder — one shared table for all customer classes, not residential contamination. Meter Setting Charge (§II.1.A) is additional. Some subdivisions (Lake Haven Estates, Sebring Country Estates, Sebring Hills, Highway 27 South) carry an additional system development charge on top.
    $1,688.01 one-time
  • Water Meter Setting Charge (City of Sebring) — 1" meter
    CANONICAL DEFAULT (1" meter). Res. 2025-23 (adopted 10/7/2025, eff. 11/1/2025) §II.1.A 'Meter Setting Charge (Residential and Commercial)' — the physical meter-set charge, separate from and IN ADDITION TO the §II.1.F commercial connection fee. Inside-city ladder: 5/8" & 3/4" $668.92; 1" $819.75; 1.5" $1,799.98; 2" $1,880.82; 3" $4,493.52; 4" $7,389.19; 6" $10,144.93; 8" $13,655.42; 10" set by the Utilities Director. Outside city is a separate higher column (1" = $1,017.79). Source: pages 138-139 of the 10/7/2025 Council agenda packet (image-only scan; resolution not posted separately and not in Municode). Per §II.1.E, commercial developers bear the cost of furnishing and installing meters (RF module + dual check valve).
    $819.75 one-time
Sewer$2,900.50 one-time
  • Sewer Connection Fee (City of Sebring) — 1" meter
    City of Sebring Utilities Department
    CANONICAL DEFAULT (1" meter). RESOLVED ON AUDIT 7/13/2026 — amount previously $0/Unconfirmed. Source: City of Sebring Resolution 2025-23, adopted 10/7/2025, effective 11/1/2025, §I.1.B 'Sewer Connection Fees', INSIDE City. Not posted on the city website or in Municode (Code §23-66 / §23-141 set all rates by resolution) — it exists only as pages 136–137 of the 10/7/2025 Council agenda packet (image-only scan). Fee is ERU-based but published as a WATER-METER-SIZE ladder (1 ERU = 350 gpd average daily flow; larger meters = multiple ERUs). Full inside-city ladder (equivalent multiplier in parens): 5/8" & 3/4" (1.0) $1,689.57; 1" (1.7) $2,900.50; 1.5" (3.5) $5,970.35; 2" (6.7) $11,321.64; 3" (15.0) $25,582.75; 4" (27.0) $46,048.02; 6" (60.0) $102,336.93; 8" (114.0) $194,462.95. Outside city = 125% of inside (1" = $3,624.48). Master-water-meter multi-unit properties pay the greater of $969.83/unit or the meter-size fee. Collected at building permit issuance; meter upsizing triggers the difference. One shared ladder for all customer classes.
    $2,900.50 one-time
City$0.00
  • City Impact Fee (City of Sebring, Commercial)
    City of Sebring
    Confirmed $0 (checked 7/12/2026). The City of Sebring Code of Ordinances has NO impact-fee chapter — full chapter list reviewed. Ch. 23 (Utilities) carries only water/sewer charges, all of which are set 'by resolution' (§23-66) and are tracked in the Water/Sewer table. No municipal impact fee applies to nonresidential development. County Ch. 13 impact fees are collected by Highlands County on permits within the city (see County record).
    $0.00
County$0.00
  • County Impact Fee (Highlands County, Commercial)
    Highlands County
    Highlands County Code Ch. 13 (Ord. 05-06-44, eff. 1/1/2007); the county collects its impact fees on permits issued inside municipalities. Nonres components: Transportation (§13-28) and EMS (§13-24) apply countywide; Fire Rescue (§13-23) applies ONLY in the unincorporated area and the Town of Lake Placid, so it does NOT apply in Sebring; Correctional, Law Enforcement, Library, Parks and Education fees are residential-only. §13-29(3) suspended ALL §§13-21—13-28 fees through and including 6/30/2026 — lapsed on paper (Municode current 7/1/2026; no further extension codified) — but the county has collected no impact fees since 2009 and its Impact Fee Study page (checked 7/12/2026) says the Board has yet to decide which fees to adopt and at what rate after the 5/12/2026 workshop. §13-29(2) imposes these at only 30% of the codified rate, subject to annual index resolutions (none since 2009). $0 + Unconfirmed. Codified (suspended) nonres Commercial rates, per 1,000 sf: Transportation ITE 820 'Retail 50,000 gsf or less' = $12,153; EMS same row = $113.65. Retail measured on gross LEASABLE area per §13-2(a)(8). VERIFY: Development Services (863) 402-6650 / lsauls@highlandsfl.gov.
    Requires confirmation
Total (Sebring): $5,408.26 one-time (≈ $5,408.26 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Sebring Utilities Department City of Sebring Highlands County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Highlands County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sebring: Industrial Impact Fees

Industrial development in Sebring pays no per-square-foot impact fees, but owes $5,408.26 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to at least $5,408.26. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Sebring) — 1" meter ($2,900.50 one-time), Water Connection Fee (City of Sebring) — 1" meter ($1,688.01 one-time) and Water Meter Setting Charge (City of Sebring) — 1" meter ($819.75 one-time).

County Impact Fee (Highlands County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,507.76 one-time
  • Water Connection Fee (City of Sebring) — 1" meter
    City of Sebring Utilities Department
    CANONICAL DEFAULT (1" meter). RESOLVED ON AUDIT 7/13/2026 — amount previously $0/Unconfirmed. Source: City of Sebring Resolution 2025-23, adopted at the 10/7/2025 Council public hearing (F.S. 180.191), effective 11/1/2025, §II.1.F 'Commercial Connection Fees', Single Service, INSIDE City. The resolution is not posted on the city website or in Municode (Code §23-66 / §23-141 set all rates by resolution) — it exists only as pages 136–141 of the 10/7/2025 Council agenda packet (image-only scan). Full inside-city commercial single-service ladder (equivalent multiplier in parens): 5/8" & 3/4" (1.0) $998.12; 1" (1.7) $1,688.01; 1.5" (3.5) $3,492.77; 2" (6.7) $6,700.91; 3" (15.0) $14,998.02; 4" (27.0) $26,991.21; 6" (60.0) $59,886.98; 8" (114.0) $113,785.27; 10" set by the Utilities Director. Outside-city column is separate (1" = $2,280.86) and a Master Meter column applies to multi-unit services (1" inside = $5,426.03). The commercial single-service ladder is identical to the §II.1.B single-family ladder — one shared table for all customer classes, not residential contamination. Meter Setting Charge (§II.1.A) is additional. Some subdivisions (Lake Haven Estates, Sebring Country Estates, Sebring Hills, Highway 27 South) carry an additional system development charge on top.
    $1,688.01 one-time
  • Water Meter Setting Charge (City of Sebring) — 1" meter
    CANONICAL DEFAULT (1" meter). Res. 2025-23 (adopted 10/7/2025, eff. 11/1/2025) §II.1.A 'Meter Setting Charge (Residential and Commercial)' — the physical meter-set charge, separate from and IN ADDITION TO the §II.1.F commercial connection fee. Inside-city ladder: 5/8" & 3/4" $668.92; 1" $819.75; 1.5" $1,799.98; 2" $1,880.82; 3" $4,493.52; 4" $7,389.19; 6" $10,144.93; 8" $13,655.42; 10" set by the Utilities Director. Outside city is a separate higher column (1" = $1,017.79). Source: pages 138-139 of the 10/7/2025 Council agenda packet (image-only scan; resolution not posted separately and not in Municode). Per §II.1.E, commercial developers bear the cost of furnishing and installing meters (RF module + dual check valve).
    $819.75 one-time
Sewer$2,900.50 one-time
  • Sewer Connection Fee (City of Sebring) — 1" meter
    City of Sebring Utilities Department
    CANONICAL DEFAULT (1" meter). RESOLVED ON AUDIT 7/13/2026 — amount previously $0/Unconfirmed. Source: City of Sebring Resolution 2025-23, adopted 10/7/2025, effective 11/1/2025, §I.1.B 'Sewer Connection Fees', INSIDE City. Not posted on the city website or in Municode (Code §23-66 / §23-141 set all rates by resolution) — it exists only as pages 136–137 of the 10/7/2025 Council agenda packet (image-only scan). Fee is ERU-based but published as a WATER-METER-SIZE ladder (1 ERU = 350 gpd average daily flow; larger meters = multiple ERUs). Full inside-city ladder (equivalent multiplier in parens): 5/8" & 3/4" (1.0) $1,689.57; 1" (1.7) $2,900.50; 1.5" (3.5) $5,970.35; 2" (6.7) $11,321.64; 3" (15.0) $25,582.75; 4" (27.0) $46,048.02; 6" (60.0) $102,336.93; 8" (114.0) $194,462.95. Outside city = 125% of inside (1" = $3,624.48). Master-water-meter multi-unit properties pay the greater of $969.83/unit or the meter-size fee. Collected at building permit issuance; meter upsizing triggers the difference. One shared ladder for all customer classes.
    $2,900.50 one-time
City$0.00
  • City Impact Fee (City of Sebring, Industrial)
    City of Sebring
    Confirmed $0 (checked 7/12/2026). No impact-fee chapter in the Sebring Code; Ch. 23 Utilities carries only water/sewer charges set by resolution (tracked in the Water/Sewer table). No municipal impact fee applies to nonresidential development.
    $0.00
County$0.00
  • County Impact Fee (Highlands County, Industrial)
    Highlands County
    Highlands County Code Ch. 13 (Ord. 05-06-44, eff. 1/1/2007); the county collects its impact fees on permits issued inside municipalities. Nonres components: Transportation (§13-28) and EMS (§13-24) apply countywide; Fire Rescue (§13-23) applies ONLY in the unincorporated area and the Town of Lake Placid, so it does NOT apply in Sebring; Correctional, Law Enforcement, Library, Parks and Education fees are residential-only. §13-29(3) suspended ALL §§13-21—13-28 fees through and including 6/30/2026 — lapsed on paper (Municode current 7/1/2026; no further extension codified) — but the county has collected no impact fees since 2009 and its Impact Fee Study page (checked 7/12/2026) says the Board has yet to decide which fees to adopt and at what rate after the 5/12/2026 workshop. §13-29(2) imposes these at only 30% of the codified rate, subject to annual index resolutions (none since 2009). $0 + Unconfirmed. Codified (suspended) nonres Industrial rates, per 1,000 sf GFA: Transportation ITE 110 'General industrial/industrial park' = $4,663; EMS same row = $27.32. VERIFY: Development Services (863) 402-6650 / lsauls@highlandsfl.gov.
    Requires confirmation
Total (Sebring): $5,408.26 one-time (≈ $5,408.26 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Sebring Utilities Department City of Sebring Highlands County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Highlands County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sebring: Office Impact Fees

Office development in Sebring pays no per-square-foot impact fees, but owes $5,408.26 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to at least $5,408.26. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Sebring) — 1" meter ($2,900.50 one-time), Water Connection Fee (City of Sebring) — 1" meter ($1,688.01 one-time) and Water Meter Setting Charge (City of Sebring) — 1" meter ($819.75 one-time).

County Impact Fee (Highlands County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,507.76 one-time
  • Water Connection Fee (City of Sebring) — 1" meter
    City of Sebring Utilities Department
    CANONICAL DEFAULT (1" meter). RESOLVED ON AUDIT 7/13/2026 — amount previously $0/Unconfirmed. Source: City of Sebring Resolution 2025-23, adopted at the 10/7/2025 Council public hearing (F.S. 180.191), effective 11/1/2025, §II.1.F 'Commercial Connection Fees', Single Service, INSIDE City. The resolution is not posted on the city website or in Municode (Code §23-66 / §23-141 set all rates by resolution) — it exists only as pages 136–141 of the 10/7/2025 Council agenda packet (image-only scan). Full inside-city commercial single-service ladder (equivalent multiplier in parens): 5/8" & 3/4" (1.0) $998.12; 1" (1.7) $1,688.01; 1.5" (3.5) $3,492.77; 2" (6.7) $6,700.91; 3" (15.0) $14,998.02; 4" (27.0) $26,991.21; 6" (60.0) $59,886.98; 8" (114.0) $113,785.27; 10" set by the Utilities Director. Outside-city column is separate (1" = $2,280.86) and a Master Meter column applies to multi-unit services (1" inside = $5,426.03). The commercial single-service ladder is identical to the §II.1.B single-family ladder — one shared table for all customer classes, not residential contamination. Meter Setting Charge (§II.1.A) is additional. Some subdivisions (Lake Haven Estates, Sebring Country Estates, Sebring Hills, Highway 27 South) carry an additional system development charge on top.
    $1,688.01 one-time
  • Water Meter Setting Charge (City of Sebring) — 1" meter
    CANONICAL DEFAULT (1" meter). Res. 2025-23 (adopted 10/7/2025, eff. 11/1/2025) §II.1.A 'Meter Setting Charge (Residential and Commercial)' — the physical meter-set charge, separate from and IN ADDITION TO the §II.1.F commercial connection fee. Inside-city ladder: 5/8" & 3/4" $668.92; 1" $819.75; 1.5" $1,799.98; 2" $1,880.82; 3" $4,493.52; 4" $7,389.19; 6" $10,144.93; 8" $13,655.42; 10" set by the Utilities Director. Outside city is a separate higher column (1" = $1,017.79). Source: pages 138-139 of the 10/7/2025 Council agenda packet (image-only scan; resolution not posted separately and not in Municode). Per §II.1.E, commercial developers bear the cost of furnishing and installing meters (RF module + dual check valve).
    $819.75 one-time
Sewer$2,900.50 one-time
  • Sewer Connection Fee (City of Sebring) — 1" meter
    City of Sebring Utilities Department
    CANONICAL DEFAULT (1" meter). RESOLVED ON AUDIT 7/13/2026 — amount previously $0/Unconfirmed. Source: City of Sebring Resolution 2025-23, adopted 10/7/2025, effective 11/1/2025, §I.1.B 'Sewer Connection Fees', INSIDE City. Not posted on the city website or in Municode (Code §23-66 / §23-141 set all rates by resolution) — it exists only as pages 136–137 of the 10/7/2025 Council agenda packet (image-only scan). Fee is ERU-based but published as a WATER-METER-SIZE ladder (1 ERU = 350 gpd average daily flow; larger meters = multiple ERUs). Full inside-city ladder (equivalent multiplier in parens): 5/8" & 3/4" (1.0) $1,689.57; 1" (1.7) $2,900.50; 1.5" (3.5) $5,970.35; 2" (6.7) $11,321.64; 3" (15.0) $25,582.75; 4" (27.0) $46,048.02; 6" (60.0) $102,336.93; 8" (114.0) $194,462.95. Outside city = 125% of inside (1" = $3,624.48). Master-water-meter multi-unit properties pay the greater of $969.83/unit or the meter-size fee. Collected at building permit issuance; meter upsizing triggers the difference. One shared ladder for all customer classes.
    $2,900.50 one-time
City$0.00
  • City Impact Fee (City of Sebring, Office)
    City of Sebring
    Confirmed $0 (checked 7/12/2026). No impact-fee chapter in the Sebring Code; Ch. 23 Utilities carries only water/sewer charges set by resolution (tracked in the Water/Sewer table). No municipal impact fee applies to nonresidential development.
    $0.00
County$0.00
  • County Impact Fee (Highlands County, Office)
    Highlands County
    Highlands County Code Ch. 13 (Ord. 05-06-44, eff. 1/1/2007); the county collects its impact fees on permits issued inside municipalities. Nonres components: Transportation (§13-28) and EMS (§13-24) apply countywide; Fire Rescue (§13-23) applies ONLY in the unincorporated area and the Town of Lake Placid, so it does NOT apply in Sebring; Correctional, Law Enforcement, Library, Parks and Education fees are residential-only. §13-29(3) suspended ALL §§13-21—13-28 fees through and including 6/30/2026 — lapsed on paper (Municode current 7/1/2026; no further extension codified) — but the county has collected no impact fees since 2009 and its Impact Fee Study page (checked 7/12/2026) says the Board has yet to decide which fees to adopt and at what rate after the 5/12/2026 workshop. §13-29(2) imposes these at only 30% of the codified rate, subject to annual index resolutions (none since 2009). $0 + Unconfirmed. Codified (suspended) nonres Office rates, per 1,000 sf GFA: Transportation ITE 710 'Office 50,000 sf or less' = $12,380; EMS same row = $66.13. VERIFY: Development Services (863) 402-6650 / lsauls@highlandsfl.gov.
    Requires confirmation
Total (Sebring): $5,408.26 one-time (≈ $5,408.26 at 25,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Sebring Utilities Department City of Sebring Highlands County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Highlands County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Sebring

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

How much are commercial impact fees in Sebring?

Commercial development in Sebring pays no per-square-foot impact fees, but owes $5,408.26 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Sebring charge its own impact fees?

Yes. Sebring levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Sebring, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Highlands County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000