Mayo impact fees by project type
Mayo: Single-Family Impact Fees
A new single-family home in Mayo pays at least $412.50 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lafayette County.
Law Enforcement Impact Fee (Town of Mayo) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (Town of Mayo) and Sewer Connection Fee (Town of Mayo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Mayo)Requires confirmationTown of MayoTown of Mayo operates its own water system. Municode Sec. 28-63 (Ord. 57 §2, 3-3-1969; Ord. 11-02 §1, 12-12-2011): 'The monthly rates and charges to be paid to the town for water service shall be as established by resolution. The connection fee after construction shall be as established by resolution.' No dollar amount is codified. Mayo's code has NO Appendix A / fee schedule (checked: only Code Comparative Tables follow Ch. 28). Re-searched 7/13/2026 for a town website: Mayo Town Hall has NONE — townofmayo.org is a privately run community site ('Town of Mayo Happenings') that itself lists Town Hall's website as 'NONE'. Fee is genuinely unpublished; phone only. Mayo Town Hall, 276 W. Main St, (386) 294-1551.
- Sewer Connection Fee (Town of Mayo)Requires confirmationTown of MayoTown of Mayo operates its own sewer system (connection required within 200 ft, Sec. 28-20). Sec. 28-97: rates and charges 'shall be as established by resolution'; Sec. 28-19/28-20 leave the connection charge to council rules 'in such reasonable amount as the council may fix.' No dollar amount codified; Mayo's code has no Appendix A / fee schedule. Re-searched 7/13/2026: Mayo Town Hall has NO official website (townofmayo.org is a private community site and confirms Town Hall's website is 'NONE'). Genuinely unpublished; phone only. Mayo Town Hall, 276 W. Main St, (386) 294-1551.
- City Impact Fee (Town of Mayo)$0.00Town of MayoFull Mayo Code of Ordinances reviewed (Supp. 1, codified through Ord. 2023-002, Dec 11 2023). No city-level development impact fee chapter found. Ch. 10 is a CDBG revolving loan program — not an impact fee. No transportation, parks, police, or fire impact fee chapter exists. $0 None.
- Law Enforcement Impact Fee (Town of Mayo)$412.50Requires confirmationLafayette County Law Enforcement DistrictAMOUNT confirmed ($412.50/unit eff 10/1/2025, stepping to $450.00 on 10/1/2026 per Ord. 2023-02); APPLICABILITY INSIDE MAYO IS DISPUTED BY THE COUNTY'S OWN DOCUMENTS. Ord. 86-3 Sec. 3 establishes the Law Enforcement District as 'all unincorporated areas of Lafayette County,' and original Sec. 8(b) barred a CO for units 'within the District' — which would EXCLUDE the Town of Mayo. But Ord. 2023-02's amended Sec. 8(b) says 'within the County,' and the county's posted permit fee schedule says the fee applies to 'all new dwelling units' with no unincorporated-only qualifier. Mayo has no building department (Ch. 8 adopts the state code only), so every new-dwelling permit in Mayo is pulled from Lafayette County Building (120 W. Main St, in Mayo). Kept at $412.50 as the practical collected amount; UNCONFIRMED pending the county's answer on whether the District fee is collected inside town limits. Call Lafayette County Building Dept (386) 294-3611.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo: Multifamily Impact Fees
A new multifamily unit in Mayo pays at least $412.50 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lafayette County.
Law Enforcement Impact Fee (Town of Mayo, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (Town of Mayo, MF) and Sewer Connection Fee (Town of Mayo, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Mayo, MF)Requires confirmationTown of MayoTown of Mayo water connection fee is set by resolution (Sec. 28-63, Ord. 11-02) — no amount codified and no fee schedule in the code (no Appendix A). Re-searched 7/13/2026: Mayo Town Hall has NO official website (townofmayo.org is a private community site that itself lists Town Hall's website as 'NONE'). Neither the per-connection amount nor any MF per-unit / master-meter basis is published — left $0 rather than copying the SFR figure. Mayo Town Hall, 276 W. Main St, (386) 294-1551.
- Sewer Connection Fee (Town of Mayo, MF)Requires confirmationTown of MayoTown of Mayo sewer rates/charges set by resolution (Sec. 28-97); connection charge left to council rules (Sec. 28-19/28-20). No amount codified, no Appendix A fee schedule. Re-searched 7/13/2026: Mayo Town Hall has NO official website. No MF per-unit basis published — left $0 rather than copying SFR. Mayo Town Hall, 276 W. Main St, (386) 294-1551.
- City Impact Fee (Town of Mayo, MF)$0.00Town of MayoFull Mayo Code of Ordinances reviewed — no city-level development impact fee chapter. $0 None.
- Law Enforcement Impact Fee (Town of Mayo, MF)$412.50Requires confirmationLafayette County Law Enforcement DistrictRate confirmed per-unit ($412.50/unit eff 10/1/2025 → $450.00/unit eff 10/1/2026, Ord. 2023-02 Sec. 3.A); APPLICABILITY INSIDE MAYO DISPUTED. Ord. 86-3 Sec. 3 defines the Law Enforcement District as 'all unincorporated areas of Lafayette County' and its original Sec. 8(b) applied the fee 'within the District' — excluding Mayo. Ord. 2023-02's amended Sec. 8(b) instead says 'within the County,' and the posted county permit fee schedule says 'all new dwelling units.' Mayo has no building department, so Mayo permits are issued by Lafayette County Building. Kept at $412.50/unit; UNCONFIRMED pending the county's answer. Call (386) 294-3611.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo: Commercial Impact Fees
Commercial development in Mayo pays no per-square-foot impact fees, but owes $412.50 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to at least $412.50. The calculator below adjusts to your exact square footage.
Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Commercial) — Town of Mayo is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Mayo) and Water Connection Fee (Town of Mayo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Mayo)Requires confirmationTown of Mayo$0 PLACEHOLDER — UNCONFIRMED, fee is genuinely unpublished. The Town of Mayo runs its own water system. Ch. 28 read in full 7/13/2026: Sec. 28-63 (Ord. 57 §2, 3-3-1969; Ord. 11-02 §1, 12-12-2011) — 'The monthly rates and charges to be paid to the town for water service shall be as established by resolution. The connection fee after construction shall be as established by resolution.' Sec. 28-19 leaves the connection charge to council rules 'in such reasonable amount as the council may fix.' NO dollar amount is codified anywhere; no meter-size ladder, no ERC/ERU table, and no nonres multiplier exists in the code. Sec. 28-69 requires every connection to be separately metered, so a meter-based charge is plausible but unpublished. Mayo's code has NO Appendix A / fee schedule (only Code Comparative Tables follow Ch. 28). Sources exhausted 7/13/2026: Municode (only codifier), web search, and town web presence — Mayo Town Hall has NO official website (townofmayo.org is a privately run community site that itself lists Town Hall's website as 'NONE'). The setting resolutions are not posted. TO CONFIRM: the current nonresidential water connection/tap fee and whether it varies by meter size. Contact: Mayo Town Hall, 276 W. Main St, Mayo FL 32066, (386) 294-1551.
- Sewer Connection Fee (Town of Mayo)Requires confirmationTown of Mayo$0 PLACEHOLDER — UNCONFIRMED, fee is genuinely unpublished. The Town of Mayo runs its own sewer system; Sec. 28-20 REQUIRES connection for any building 'for either residential, commercial or industrial use' within 200 ft of a sewer line, so nonres connection charges do exist. Ch. 28 read in full 7/13/2026: Sec. 28-97 (Ord. 87 §1, 9-22-1980; Ord. 113, 6-13-1994; Ord. 11-02, 12-12-2011; Ord. 2021-001 §2, 12-13-2021) — rates and charges for sewer service 'shall be as established by resolution.' Sec. 28-20 leaves the connection charge to council rules 'in such reasonable amount as the council may fix and determine.' NO dollar amount codified; no meter ladder, no ERC/ERU basis, no fixture-unit table, no nonres multiplier. No Appendix A / fee schedule in the code. Sources exhausted 7/13/2026: Municode, web search, town web presence — Mayo Town Hall has NO official website (townofmayo.org is a private community site confirming Town Hall's website is 'NONE'); the setting resolutions (incl. Ord. 2021-001's) are not posted. TO CONFIRM: the current nonresidential sewer connection/tap fee and its basis. Contact: Mayo Town Hall, 276 W. Main St, Mayo FL 32066, (386) 294-1551.
- City Impact Fee (Town of Mayo, Commercial)$0.00Town of MayoCONFIRMED $0 — the Town of Mayo levies no municipal impact or development fee of any kind. Full Code of Ordinances reviewed 7/13/2026 (Supp. No. 1, codified through Ord. No. 2023-002, enacted 12-11-2023): the code has 15 chapters (1 General Provisions, 2 Administration, 4 Alcoholic Beverages, 6 Animals, 8 Buildings, 10 Community Development, 12 Elections, 14 Environment, 16 Floods, 18 Human Rights, 20 Licenses/Taxation, 22 Offenses, 24 Solid Waste, 26 Traffic, 28 Utilities) and NO impact-fee or development-fee chapter. Ch. 10 Community Development is a CDBG revolving loan program, not an impact fee. No transportation, parks, police or fire impact fee exists. The code has no Appendix A / fee schedule (only Code Comparative Tables follow Ch. 28). Mayo also has no building department — Ch. 8 adopts the state code and permits are pulled from Lafayette County Building. The only impact fee reaching Mayo is the county Law Enforcement District fee (separate County-type records).
- Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Commercial) — Town of Mayo$412.50 one-timeRequires confirmationLafayette County Law Enforcement DistrictCounty Law Enforcement District fee, Ord. 86-3 as amended by Ord. 2023-02. AMOUNT + NONRES BASIS confirmed: Sec. 3(D) assesses all commercial/industrial structures per structure; Sec. 8(b)(1) rate $412.50 eff 10/1/2025 → $450.00 on 10/1/2026. TWO OPEN APPLICABILITY QUESTIONS, both UNCONFIRMED: (1) IN-TOWN — Ord. 86-3 Sec. 3 defines the Law Enforcement District as 'all unincorporated areas of Lafayette County,' which would exclude Mayo, but Ord. 2023-02's amended Sec. 8(b) reads 'new development within the County' and Mayo has no building department (Code Ch. 8 adopts the state code only), so every Mayo permit is pulled from Lafayette County Building. (2) NONRES — the county's posted Permit Fee Schedule describes the fee as applying to 'all new dwelling units, including RVs' only, conflicting with Sec. 3(D). Entered at $412.50 as the practical collected amount pending the county's answer. Call Lafayette County Building Dept (386) 294-3611.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo: Industrial Impact Fees
Industrial development in Mayo pays no per-square-foot impact fees, but owes $412.50 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to at least $412.50. The calculator below adjusts to your exact square footage.
Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Industrial) — Town of Mayo is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Mayo) and Water Connection Fee (Town of Mayo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Mayo)Requires confirmationTown of Mayo$0 PLACEHOLDER — UNCONFIRMED, fee is genuinely unpublished. The Town of Mayo runs its own water system. Ch. 28 read in full 7/13/2026: Sec. 28-63 (Ord. 57 §2, 3-3-1969; Ord. 11-02 §1, 12-12-2011) — 'The monthly rates and charges to be paid to the town for water service shall be as established by resolution. The connection fee after construction shall be as established by resolution.' Sec. 28-19 leaves the connection charge to council rules 'in such reasonable amount as the council may fix.' NO dollar amount is codified anywhere; no meter-size ladder, no ERC/ERU table, and no nonres multiplier exists in the code. Sec. 28-69 requires every connection to be separately metered, so a meter-based charge is plausible but unpublished. Mayo's code has NO Appendix A / fee schedule (only Code Comparative Tables follow Ch. 28). Sources exhausted 7/13/2026: Municode (only codifier), web search, and town web presence — Mayo Town Hall has NO official website (townofmayo.org is a privately run community site that itself lists Town Hall's website as 'NONE'). The setting resolutions are not posted. TO CONFIRM: the current nonresidential water connection/tap fee and whether it varies by meter size. Contact: Mayo Town Hall, 276 W. Main St, Mayo FL 32066, (386) 294-1551.
- Sewer Connection Fee (Town of Mayo)Requires confirmationTown of Mayo$0 PLACEHOLDER — UNCONFIRMED, fee is genuinely unpublished. The Town of Mayo runs its own sewer system; Sec. 28-20 REQUIRES connection for any building 'for either residential, commercial or industrial use' within 200 ft of a sewer line, so nonres connection charges do exist. Ch. 28 read in full 7/13/2026: Sec. 28-97 (Ord. 87 §1, 9-22-1980; Ord. 113, 6-13-1994; Ord. 11-02, 12-12-2011; Ord. 2021-001 §2, 12-13-2021) — rates and charges for sewer service 'shall be as established by resolution.' Sec. 28-20 leaves the connection charge to council rules 'in such reasonable amount as the council may fix and determine.' NO dollar amount codified; no meter ladder, no ERC/ERU basis, no fixture-unit table, no nonres multiplier. No Appendix A / fee schedule in the code. Sources exhausted 7/13/2026: Municode, web search, town web presence — Mayo Town Hall has NO official website (townofmayo.org is a private community site confirming Town Hall's website is 'NONE'); the setting resolutions (incl. Ord. 2021-001's) are not posted. TO CONFIRM: the current nonresidential sewer connection/tap fee and its basis. Contact: Mayo Town Hall, 276 W. Main St, Mayo FL 32066, (386) 294-1551.
- City Impact Fee (Town of Mayo, Industrial)$0.00Town of MayoCONFIRMED $0 — same basis as the Mayo Commercial City record. Full Mayo Code of Ordinances reviewed 7/13/2026 (Supp. No. 1, thru Ord. 2023-002): 15 chapters, no impact-fee or development-fee chapter, no Appendix A fee schedule. Town levies no municipal impact fee on any land use.
- Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Industrial) — Town of Mayo$412.50 one-timeRequires confirmationLafayette County Law Enforcement DistrictSame fee as the Mayo Commercial record. $412.50 per structure eff 10/1/2025 → $450.00 on 10/1/2026 (Ord. 2023-02 Sec. 8(b)(1)); Sec. 3(D) names industrial structures expressly. UNCONFIRMED on the same two grounds as the Mayo Commercial record: (1) Ord. 86-3 Sec. 3 defines the Law Enforcement District as the unincorporated area, which would exclude Mayo; (2) the county's posted Permit Fee Schedule mentions only dwelling units. Call Lafayette County Building Dept (386) 294-3611.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo: Office Impact Fees
Office development in Mayo pays no per-square-foot impact fees, but owes $412.50 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 25,000 sq ft building, that comes to at least $412.50. The calculator below adjusts to your exact square footage.
Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Office) — Town of Mayo is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Mayo) and Water Connection Fee (Town of Mayo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Mayo)Requires confirmationTown of Mayo$0 PLACEHOLDER — UNCONFIRMED, fee is genuinely unpublished. The Town of Mayo runs its own water system. Ch. 28 read in full 7/13/2026: Sec. 28-63 (Ord. 57 §2, 3-3-1969; Ord. 11-02 §1, 12-12-2011) — 'The monthly rates and charges to be paid to the town for water service shall be as established by resolution. The connection fee after construction shall be as established by resolution.' Sec. 28-19 leaves the connection charge to council rules 'in such reasonable amount as the council may fix.' NO dollar amount is codified anywhere; no meter-size ladder, no ERC/ERU table, and no nonres multiplier exists in the code. Sec. 28-69 requires every connection to be separately metered, so a meter-based charge is plausible but unpublished. Mayo's code has NO Appendix A / fee schedule (only Code Comparative Tables follow Ch. 28). Sources exhausted 7/13/2026: Municode (only codifier), web search, and town web presence — Mayo Town Hall has NO official website (townofmayo.org is a privately run community site that itself lists Town Hall's website as 'NONE'). The setting resolutions are not posted. TO CONFIRM: the current nonresidential water connection/tap fee and whether it varies by meter size. Contact: Mayo Town Hall, 276 W. Main St, Mayo FL 32066, (386) 294-1551.
- Sewer Connection Fee (Town of Mayo)Requires confirmationTown of Mayo$0 PLACEHOLDER — UNCONFIRMED, fee is genuinely unpublished. The Town of Mayo runs its own sewer system; Sec. 28-20 REQUIRES connection for any building 'for either residential, commercial or industrial use' within 200 ft of a sewer line, so nonres connection charges do exist. Ch. 28 read in full 7/13/2026: Sec. 28-97 (Ord. 87 §1, 9-22-1980; Ord. 113, 6-13-1994; Ord. 11-02, 12-12-2011; Ord. 2021-001 §2, 12-13-2021) — rates and charges for sewer service 'shall be as established by resolution.' Sec. 28-20 leaves the connection charge to council rules 'in such reasonable amount as the council may fix and determine.' NO dollar amount codified; no meter ladder, no ERC/ERU basis, no fixture-unit table, no nonres multiplier. No Appendix A / fee schedule in the code. Sources exhausted 7/13/2026: Municode, web search, town web presence — Mayo Town Hall has NO official website (townofmayo.org is a private community site confirming Town Hall's website is 'NONE'); the setting resolutions (incl. Ord. 2021-001's) are not posted. TO CONFIRM: the current nonresidential sewer connection/tap fee and its basis. Contact: Mayo Town Hall, 276 W. Main St, Mayo FL 32066, (386) 294-1551.
- City Impact Fee (Town of Mayo, Office)$0.00Town of MayoCONFIRMED $0 — same basis as the Mayo Commercial City record. Full Mayo Code of Ordinances reviewed 7/13/2026 (Supp. No. 1, thru Ord. 2023-002): 15 chapters, no impact-fee or development-fee chapter, no Appendix A fee schedule. Town levies no municipal impact fee on any land use.
- Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Office) — Town of Mayo$412.50 one-timeRequires confirmationLafayette County Law Enforcement DistrictSame fee as the Mayo Commercial record. $412.50 per structure eff 10/1/2025 → $450.00 on 10/1/2026 (Ord. 2023-02 Sec. 8(b)(1)). Office assessed under Sec. 3(D)'s 'Commercial and Industrial Structure' clause — the ordinance's Sec. 3 enumeration has no separate Office category. UNCONFIRMED on the same two grounds as the Mayo Commercial record: (1) Ord. 86-3 Sec. 3 defines the Law Enforcement District as the unincorporated area, which would exclude Mayo; (2) the county's posted Permit Fee Schedule mentions only dwelling units. Call Lafayette County Building Dept (386) 294-3611.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Mayo
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Mayo, Florida?
A new single-family home in Mayo pays at least $412.50 per unit in combined impact fees (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Mayo?
Commercial development in Mayo pays no per-square-foot impact fees, but owes $412.50 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Mayo charge its own impact fees?
Yes. Mayo levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Mayo, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.