Mayo impact fees by project type
Mayo: Single-Family Impact Fees
A new single-family home in Mayo pays at least $412.50 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lafayette County.
The largest line items are Law Enforcement Impact Fee (Town of Mayo) ($412.50).
Water Connection Fee (Town of Mayo) and Sewer Connection Fee (Town of Mayo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Mayo impact fee schedule
- Water Connection Fee (Town of Mayo)Requires confirmationTown of MayoThe Town of Mayo operates its own water system. The connection fee is established by town council resolution and is not published in the town code or a posted fee schedule.
- Sewer Connection Fee (Town of Mayo)Requires confirmationTown of MayoThe Town of Mayo operates its own sewer system (connection required for properties within 200 feet of a line). The connection charge is set by town council resolution and is not published in the town code or a posted fee schedule.
- City Impact Fee (Town of Mayo)$0.00Town of MayoThe Town of Mayo levies no municipal development impact fees; a full review of the town code found no transportation, parks, police, or fire impact fee.
- Law Enforcement Impact Fee (Town of Mayo)$412.50Lafayette County Law Enforcement DistrictLafayette County's Law Enforcement impact fee of $412.50 per dwelling unit (effective Oct 1, 2025; scheduled to rise to $450.00 on Oct 1, 2026) is charged on all new dwelling units. The Town of Mayo has no building department, so Lafayette County issues every building permit within the town and assesses this fee at permitting, so it applies to new homes in Mayo. The town levies no development impact fee of its own.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo: Multifamily Impact Fees
A new multifamily unit in Mayo pays at least $412.50 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lafayette County.
Law Enforcement Impact Fee (Town of Mayo, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (Town of Mayo, MF) and Sewer Connection Fee (Town of Mayo, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Mayo impact fee schedule
- Water Connection Fee (Town of Mayo, MF)Requires confirmationTown of MayoThe Town of Mayo operates its own water system. The connection fee is established by town council resolution and is not published in the town code or a posted fee schedule; no per-unit or master-meter basis for multifamily is published.
- Sewer Connection Fee (Town of Mayo, MF)Requires confirmationTown of MayoThe Town of Mayo operates its own sewer system (connection required for properties within 200 feet of a line). The connection charge is set by town council resolution and is not published in the town code or a posted fee schedule; no per-unit basis for multifamily is published.
- City Impact Fee (Town of Mayo, MF)$0.00Town of MayoThe Town of Mayo levies no municipal development impact fees; a full review of the town code found no transportation, parks, police, or fire impact fee.
- Law Enforcement Impact Fee (Town of Mayo, MF)$412.50Requires confirmationLafayette County Law Enforcement DistrictLafayette County's Law Enforcement impact fee is charged per dwelling unit ($412.50/unit effective Oct 1, 2025; scheduled to rise to $450.00 on Oct 1, 2026), so each unit in a multifamily project pays. The Town of Mayo has no building department, so Lafayette County issues every building permit within the town and assesses this fee at permitting, so it applies to new multifamily units in Mayo. The town levies no development impact fee of its own.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo: Commercial Impact Fees
Commercial development in Mayo pays no per-square-foot impact fees, but owes $412.50 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to at least $412.50. The calculator below adjusts to your exact square footage.
Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Commercial) — Town of Mayo is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Mayo) and Water Connection Fee (Town of Mayo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Mayo impact fee schedule
- Water Connection Fee (Town of Mayo)Requires confirmationTown of Mayo
- Sewer Connection Fee (Town of Mayo)Requires confirmationTown of Mayo
- City Impact Fee (Town of Mayo, Commercial)$0.00Town of Mayo
- Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Commercial) — Town of Mayo$412.50 one-timeRequires confirmationLafayette County Law Enforcement DistrictLafayette County Law Enforcement District impact fee, assessed per structure (not per square foot). Current rate $412.50 per structure, effective 10/1/2025; increases to $450.00 on 10/1/2026.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo: Industrial Impact Fees
Industrial development in Mayo pays no per-square-foot impact fees, but owes $412.50 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to at least $412.50. The calculator below adjusts to your exact square footage.
Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Industrial) — Town of Mayo is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Mayo) and Water Connection Fee (Town of Mayo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Mayo impact fee schedule
- Water Connection Fee (Town of Mayo)Requires confirmationTown of Mayo
- Sewer Connection Fee (Town of Mayo)Requires confirmationTown of Mayo
- City Impact Fee (Town of Mayo, Industrial)$0.00Town of Mayo
- Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Industrial) — Town of Mayo$412.50 one-timeRequires confirmationLafayette County Law Enforcement DistrictLafayette County Law Enforcement District impact fee, assessed per structure (not per square foot). Current rate $412.50 per structure, effective 10/1/2025; increases to $450.00 on 10/1/2026.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo: Office Impact Fees
Office development in Mayo pays no per-square-foot impact fees, but owes $412.50 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 25,000 sq ft building, that comes to at least $412.50. The calculator below adjusts to your exact square footage.
Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Office) — Town of Mayo is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Mayo) and Water Connection Fee (Town of Mayo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Mayo impact fee schedule
- Water Connection Fee (Town of Mayo)Requires confirmationTown of Mayo
- Sewer Connection Fee (Town of Mayo)Requires confirmationTown of Mayo
- City Impact Fee (Town of Mayo, Office)$0.00Town of Mayo
- Law Enforcement Impact Fee (Lafayette County Law Enforcement District, Office) — Town of Mayo$412.50 one-timeRequires confirmationLafayette County Law Enforcement DistrictLafayette County Law Enforcement District impact fee, assessed per structure (not per square foot). Current rate $412.50 per structure, effective 10/1/2025; increases to $450.00 on 10/1/2026.
Where in Lafayette County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayo impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Mayo impact fee FAQs
What are the total impact fees for a single-family home in Mayo, Florida?
A new single-family home in Mayo pays at least $412.50 per unit in combined impact fees (rates sourced July 13, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Mayo?
Commercial development in Mayo pays no per-square-foot impact fees, but owes $412.50 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Mayo charge its own impact fees?
Yes. Mayo levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Mayo, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Lafayette County impact fees page.