IMPACTFEES.ORG

Liberty County, Florida Impact Fees

Impact fees in Liberty County depend on where you build. This page details the rates for unincorporated Liberty County: $250.00 per single-family unit as of . Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Liberty County impact fees by project type

Where in Liberty County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Unincorporated Liberty County$250.00this page
Bristol$3,250.00

Unincorporated Liberty County: Single-Family Impact Fees

A new single-family home in unincorporated Liberty County pays $250.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Liberty County.

The largest line items are Water Connection Fee (Liberty County - Hosford-Telogia) ($250.00).

View the full Liberty County impact fee schedule
Water$250.00
  • Water Connection Fee (Liberty County - Hosford-Telogia)
    Liberty County BOCC
    Liberty County (Hosford-Telogia) water connection fee, a $250 minimum (Ord. 98-01, effective 1/1/1999); the actual charge may exceed $250 where line-extension costs are higher. Charged per connection, with each lot or building site separately metered.
    $250.00
Sewer$0.00
City$0.00
County$0.00
Total (unincorporated Liberty County): $250.00
Sources last checked Official fee schedules:Liberty County BOCC N/A — no county sewer utility N/A

Where in Liberty County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Unincorporated Liberty County$250.00this page
Bristol$3,250.00

Unincorporated Liberty County: Multifamily Impact Fees

A new multifamily unit in unincorporated Liberty County pays $250.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Liberty County.

The largest line items are Water Connection Fee (Liberty County - Hosford-Telogia, MF) ($250.00).

View the full Liberty County impact fee schedule
Water$250.00
  • Water Connection Fee (Liberty County - Hosford-Telogia, MF)
    Liberty County BOCC
    Liberty County (Hosford-Telogia) water connection fee, a $250 minimum per connection (Ord. 98-01, effective 1/1/1999). Each lot or building site is a separate unit requiring its own metered connection; a multi-unit building pays $250 per connection installed, so the total scales with the number of connections.
    $250.00
Sewer$0.00
City$0.00
County$0.00
Total (unincorporated Liberty County): $250.00
Sources last checked Official fee schedules:Liberty County BOCC N/A — no county sewer utility N/A

Where in Liberty County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Unincorporated Liberty County$250.00*this page
Bristol$3,500.00*

Unincorporated Liberty County: Commercial Impact Fees

Commercial development in unincorporated Liberty County pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Liberty County Waterworks) ($250.00 one-time).

View the full Liberty County impact fee schedule
Water$250.00 one-time
  • Water Connection Fee (Liberty County Waterworks)
    Liberty County BOCC — County Waterworks System (Hosford-Telogia Water Distribution System)
    Effective January 1, 1999. The $250 water connection fee is a minimum that applies to all users regardless of meter size; a larger commercial or industrial tap may be charged more where line-extension costs are higher.
    $250.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Liberty County - Unincorporated)
    N/A — no county sewer utility
    Liberty County operates no sewer or wastewater utility. Nonresidential wastewater in the unincorporated county area is served by DEP-permitted onsite septic systems, priced by the installer.
    $0.00
City$0.00
County$0.00
Total (unincorporated Liberty County): $250.00 one-time (≈ $250.00 at 50,000 sq ft)

Where in Liberty County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Unincorporated Liberty County$250.00*this page
Bristol$3,500.00*

Unincorporated Liberty County: Industrial Impact Fees

Industrial development in unincorporated Liberty County pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Liberty County Waterworks) ($250.00 one-time).

View the full Liberty County impact fee schedule
Water$250.00 one-time
  • Water Connection Fee (Liberty County Waterworks)
    Liberty County BOCC — County Waterworks System (Hosford-Telogia Water Distribution System)
    Effective January 1, 1999. The $250 water connection fee is a minimum that applies to all users regardless of meter size; a larger commercial or industrial tap may be charged more where line-extension costs are higher.
    $250.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Liberty County - Unincorporated)
    N/A — no county sewer utility
    Liberty County operates no sewer or wastewater utility. Nonresidential wastewater in the unincorporated county area is served by DEP-permitted onsite septic systems, priced by the installer.
    $0.00
City$0.00
County$0.00
Total (unincorporated Liberty County): $250.00 one-time (≈ $250.00 at 50,000 sq ft)

Where in Liberty County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Unincorporated Liberty County$250.00*this page
Bristol$3,500.00*

Unincorporated Liberty County: Office Impact Fees

Office development in unincorporated Liberty County pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Liberty County Waterworks) ($250.00 one-time).

View the full Liberty County impact fee schedule
Water$250.00 one-time
  • Water Connection Fee (Liberty County Waterworks)
    Liberty County BOCC — County Waterworks System (Hosford-Telogia Water Distribution System)
    Effective January 1, 1999. The $250 water connection fee is a minimum that applies to all users regardless of meter size; a larger commercial or industrial tap may be charged more where line-extension costs are higher.
    $250.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Liberty County - Unincorporated)
    N/A — no county sewer utility
    Liberty County operates no sewer or wastewater utility. Nonresidential wastewater in the unincorporated county area is served by DEP-permitted onsite septic systems, priced by the installer.
    $0.00
City$0.00
County$0.00
Total (unincorporated Liberty County): $250.00 one-time (≈ $250.00 at 25,000 sq ft)

Liberty County impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Liberty County impact fee FAQs

What are single-family impact fees in Liberty County, Florida?

A new single-family home in unincorporated Liberty County pays $250.00 per unit in impact fees (rates sourced July 14, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Liberty County?

Multifamily development in unincorporated Liberty County pays $250.00 per unit in impact fees (rates sourced July 14, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Liberty County?

Commercial development in unincorporated Liberty County pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees.

Do cities in Liberty County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 1 of 1 cities in Liberty County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000