Lake Butler, Florida Impact Fees

Lake Butler applies its own fee schedule. Union County does not currently add county-level impact fees inside city limits. A new single-family home pays $1,935.00 per unit (rates sourced ). The full breakdown is below.

Lake Butler Impact Fees by Project Type

Lake Butler: Single-Family Impact Fees

A new single-family home in Lake Butler pays $1,935.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity/Tap Charge (City of Lake Butler) ($1,284.00) and Water Capacity/Tap Charge (City of Lake Butler) ($651.00).

View the Full Lake Butler Impact Fee Schedule
Water$651.00
  • Water Capacity/Tap Charge (City of Lake Butler)
    City of Lake Butler
    City of Lake Butler water capacity/tap charge: $651 per residential equivalent unit (REU) for a connection inside the city (a single-family home = 1 REU); $814 per REU outside the city limits. A separate irrigation connection is $455.70. REUs are computed per the Florida Rural Water Association study.
    $651.00
Sewer$1,284.00
  • Sewer Capacity/Tap Charge (City of Lake Butler)
    City of Lake Butler
    City of Lake Butler sewer capacity/tap charge: $1,284 per residential equivalent unit (REU) for a connection inside the city (a single-family home = 1 REU); $1,604 per REU outside the city limits. REUs are computed per the Florida Rural Water Association study.
    $1,284.00
City$0.00
  • Municipal Impact Fees (City of Lake Butler) — none
    City of Lake Butler
    The City of Lake Butler levies no municipal development impact fees (no parks, police, fire, or transportation impact fee). Its only development-related charges are the water and sewer capacity/tap charges.
    $0.00
County$0.00
Total (Lake Butler): $1,935.00
Sources last checked Official fee schedules:City of Lake Butler Union County

Where in Union County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Butler: Multifamily Impact Fees

A new multifamily unit in Lake Butler pays $1,935.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

Water Capacity/Tap Charge (City of Lake Butler, MF) and Sewer Capacity/Tap Charge (City of Lake Butler, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lake Butler Impact Fee Schedule
Water$651.00
  • Water Capacity/Tap Charge (City of Lake Butler, MF)
    City of Lake Butler
    City of Lake Butler water capacity/tap charge is $651 per residential equivalent unit (REU) inside the city, $814 per REU outside. A multifamily project pays for the number of REUs it represents, determined per the Florida Rural Water Association REU study; the figure shown is one REU.
    $651.00Requires confirmation
Sewer$1,284.00
  • Sewer Capacity/Tap Charge (City of Lake Butler, MF)
    City of Lake Butler
    City of Lake Butler sewer capacity/tap charge is $1,284 per residential equivalent unit (REU) inside the city, $1,604 per REU outside. A multifamily project pays for the number of REUs it represents, determined per the Florida Rural Water Association REU study; the figure shown is one REU.
    $1,284.00Requires confirmation
City$0.00
County$0.00
Total (Lake Butler): $1,935.00
Sources last checked Official fee schedules:City of Lake Butler Union County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Union County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Butler: Commercial Impact Fees

Commercial development in Lake Butler pays no per-square-foot impact fees, but owes $1,935.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $1,935.00. The calculator below adjusts to your exact square footage.

Water Capacity Fee (City of Lake Butler) — 1 REU and Sewer Capacity Fee (City of Lake Butler) — 1 REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lake Butler Impact Fee Schedule
Water$651.00 one-time
  • Water Capacity Fee (City of Lake Butler) — 1 REU
    Water capacity/installation charge, shown as the inside-city rate for one Residential Equivalent Unit (REU). The outside-city rate is $814 per REU. Nonresidential projects are billed per REU, and a building's REU count is set by the utility's adopted equivalency study, so the total capacity charge scales with the project's assessed demand.
    $651.00 one-timeRequires confirmation
Sewer$1,284.00 one-time
  • Sewer Capacity Fee (City of Lake Butler) — 1 REU
    Sewer capacity/hookup charge, shown as the inside-city rate for one Residential Equivalent Unit (REU). The outside-city rate is $1,604 per REU. Nonresidential projects are billed per REU, and a building's REU count is set by the utility's adopted equivalency study, so the total capacity charge scales with the project's assessed demand.
    $1,284.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Lake Butler): $1,935.00 one-time (≈ $1,935.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Union County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Butler: Industrial Impact Fees

Industrial development in Lake Butler pays no per-square-foot impact fees, but owes $1,935.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $1,935.00. The calculator below adjusts to your exact square footage.

Water Capacity Fee (City of Lake Butler) — 1 REU and Sewer Capacity Fee (City of Lake Butler) — 1 REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lake Butler Impact Fee Schedule
Water$651.00 one-time
  • Water Capacity Fee (City of Lake Butler) — 1 REU
    Water capacity/installation charge, shown as the inside-city rate for one Residential Equivalent Unit (REU). The outside-city rate is $814 per REU. Nonresidential projects are billed per REU, and a building's REU count is set by the utility's adopted equivalency study, so the total capacity charge scales with the project's assessed demand.
    $651.00 one-timeRequires confirmation
Sewer$1,284.00 one-time
  • Sewer Capacity Fee (City of Lake Butler) — 1 REU
    Sewer capacity/hookup charge, shown as the inside-city rate for one Residential Equivalent Unit (REU). The outside-city rate is $1,604 per REU. Nonresidential projects are billed per REU, and a building's REU count is set by the utility's adopted equivalency study, so the total capacity charge scales with the project's assessed demand.
    $1,284.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Lake Butler): $1,935.00 one-time (≈ $1,935.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Union County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Butler: Office Impact Fees

Office development in Lake Butler pays no per-square-foot impact fees, but owes $1,935.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $1,935.00. The calculator below adjusts to your exact square footage.

Water Capacity Fee (City of Lake Butler) — 1 REU and Sewer Capacity Fee (City of Lake Butler) — 1 REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lake Butler Impact Fee Schedule
Water$651.00 one-time
  • Water Capacity Fee (City of Lake Butler) — 1 REU
    Water capacity/installation charge, shown as the inside-city rate for one Residential Equivalent Unit (REU). The outside-city rate is $814 per REU. Nonresidential projects are billed per REU, and a building's REU count is set by the utility's adopted equivalency study, so the total capacity charge scales with the project's assessed demand.
    $651.00 one-timeRequires confirmation
Sewer$1,284.00 one-time
  • Sewer Capacity Fee (City of Lake Butler) — 1 REU
    Sewer capacity/hookup charge, shown as the inside-city rate for one Residential Equivalent Unit (REU). The outside-city rate is $1,604 per REU. Nonresidential projects are billed per REU, and a building's REU count is set by the utility's adopted equivalency study, so the total capacity charge scales with the project's assessed demand.
    $1,284.00 one-timeRequires confirmation
City$0.00
  • Municipal Impact Fee (City of Lake Butler, Office)
    The City of Lake Butler levies no municipal development impact fees (no parks, police, fire or transportation impact fee). Its only development-related capital charges are the water and sewer capacity charges.
    $0.00
County$0.00
Total (Lake Butler): $1,935.00 one-time (≈ $1,935.00 at 25,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Union County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Butler Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Lake Butler Impact Fee FAQs

What are the total impact fees for a single-family home in Lake Butler, Florida?

A new single-family home in Lake Butler pays $1,935.00 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Lake Butler?

Commercial development in Lake Butler pays no per-square-foot impact fees, but owes $1,935.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Lake Butler charge its own impact fees?

Yes. Lake Butler levies its own municipal impact or utility fees. Union County does not currently add county-level impact fees inside Lake Butler. The schedule on this page shows every fee that applies to development in Lake Butler.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Union County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.