Abbeville Impact Fees by Project Type
Abbeville: Single-Family Impact Fees
A new single-family home in Abbeville pays $1,600.00 per unit in impact fees (rates sourced October 28, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tapping Fee (Abbeville Public Utilities) — 5/8" x 3/4" meter, inside city ($1,000.00) and Sewer Tapping Fee (Abbeville Public Utilities) — 4" connection, inside city ($600.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Abbeville Impact Fee Schedule
- Water Tapping Fee (Abbeville Public Utilities) — 5/8" x 3/4" meter, inside city$1,000.00Abbeville Public Utilities (City of Abbeville)City of Abbeville water tapping fee inside the city, effective November 1, 2025: $1,000 for the standard 5/8 x 3/4-inch residential meter, $1,100 for 1-inch, $1,200 for 1 1/2-inch and $1,400 above 1 1/2 inches. Abbeville Public Utilities installs the service line and meter and sizes the tap.
- Sewer Tapping Fee (Abbeville Public Utilities) — 4" connection, inside city$600.00Abbeville Public Utilities (City of Abbeville)City of Abbeville sewer tapping fee inside the city, effective November 1, 2025: $600 for a standard 4-inch connection, $700 for 6-inch and $900 for 8-inch. A 6- or 8-inch tap that needs a manhole also pays labor and material costs. The customer installs the service line, and a city-licensed plumber makes the connection.
- Municipal Impact Fee (City of Abbeville)$0.00City of AbbevilleThe City of Abbeville has not adopted a development impact fee. Water and sewer tapping fees for new connections are charged separately.
- County Impact Fee (Abbeville County)$0.00Abbeville CountyAbbeville County has not adopted a development impact fee, so no county impact fee applies inside the City of Abbeville.
Where in Abbeville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Abbeville: Multifamily Impact Fees
A new multifamily unit in Abbeville pays $1,600.00 per unit in impact fees (rates sourced October 28, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tapping Fee (Abbeville Public Utilities, MF) — 5/8" x 3/4" meter per unit, inside city ($1,000.00) and Sewer Tapping Fee (Abbeville Public Utilities, MF) — 4" connection, inside city ($600.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Abbeville Impact Fee Schedule
- Water Tapping Fee (Abbeville Public Utilities, MF) — 5/8" x 3/4" meter per unit, inside city$1,000.00Abbeville Public Utilities (City of Abbeville)City of Abbeville water tapping fee inside the city, effective November 1, 2025: $1,000 per 5/8 x 3/4-inch meter, $1,100 for 1-inch, $1,200 for 1 1/2-inch and $1,400 above 1 1/2 inches. The city meters each living unit individually unless that is not feasible, so each apartment unit normally pays its own tap fee; a master-metered building pays one fee by meter size.
- Sewer Tapping Fee (Abbeville Public Utilities, MF) — 4" connection, inside city$600.00Abbeville Public Utilities (City of Abbeville)City of Abbeville sewer tapping fee inside the city, effective November 1, 2025, charged per sewer connection: $600 for a 4-inch connection, $700 for 6-inch and $900 for 8-inch, plus labor and material costs when a 6- or 8-inch tap needs a manhole. A building served by one connection pays the fee once.
- Municipal Impact Fee (City of Abbeville, MF)$0.00City of AbbevilleThe City of Abbeville has not adopted a development impact fee. Water and sewer tapping fees for new connections are charged separately.
- County Impact Fee (Abbeville County, MF)$0.00Abbeville CountyAbbeville County has not adopted a development impact fee, so no county impact fee applies to multifamily development inside the City of Abbeville.
Where in Abbeville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Abbeville: Commercial Impact Fees
Commercial development in Abbeville pays no per-square-foot impact fees, but owes $1,700.00 in one-time water and sewer connection fees (rates sourced October 28, 2026).
For a 50,000 sq ft building, that comes to about $1,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tapping Fee (Abbeville Public Utilities) — 1" meter ($1,100.00 one-time) and Sewer Tapping Fee (Abbeville Public Utilities) — 4" connection ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Abbeville Impact Fee Schedule
- Water Tapping Fee (Abbeville Public Utilities) — 1" meter$1,100.00 one-timeAbbeville Public Utilities (City of Abbeville)Effective 11/1/2025. Water tapping fee varies by meter size (5/8"x3/4"–over 1.5"). Rates shown are inside-city; outside-city tapping fees run $1,400–$1,700 by meter size.
- Sewer Tapping Fee (Abbeville Public Utilities) — 4" connection$600.00 one-timeAbbeville Public Utilities (City of Abbeville)Effective 11/1/2025. Sewer tapping fee varies by connection size (4"/6"/8"). Rates shown are inside-city; outside-city run $775–$1,400. A 6" or 8" tap that requires setting a manhole is priced at the tap fee plus labor and materials.
- Municipal Impact Fee (City of Abbeville, Commercial)$0.00The City of Abbeville has not adopted a development impact fee. Water and sewer tapping fees for new connections are charged separately.
- County Impact Fee (Abbeville County, Commercial)$0.00Abbeville County has not adopted a development impact fee, so no county impact fee applies to nonresidential development inside the City of Abbeville.
Where in Abbeville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Abbeville: Industrial Impact Fees
Industrial development in Abbeville pays no per-square-foot impact fees, but owes $1,700.00 in one-time water and sewer connection fees (rates sourced October 28, 2026).
For a 50,000 sq ft building, that comes to about $1,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tapping Fee (Abbeville Public Utilities) — 1" meter ($1,100.00 one-time) and Sewer Tapping Fee (Abbeville Public Utilities) — 4" connection ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Abbeville Impact Fee Schedule
- Water Tapping Fee (Abbeville Public Utilities) — 1" meter$1,100.00 one-timeAbbeville Public Utilities (City of Abbeville)Effective 11/1/2025. Water tapping fee varies by meter size (5/8"x3/4"–over 1.5"). Rates shown are inside-city; outside-city tapping fees run $1,400–$1,700 by meter size.
- Sewer Tapping Fee (Abbeville Public Utilities) — 4" connection$600.00 one-timeAbbeville Public Utilities (City of Abbeville)Effective 11/1/2025. Sewer tapping fee varies by connection size (4"/6"/8"). Rates shown are inside-city; outside-city run $775–$1,400. A 6" or 8" tap that requires setting a manhole is priced at the tap fee plus labor and materials.
- Municipal Impact Fee (City of Abbeville, Industrial)$0.00The City of Abbeville has not adopted a development impact fee. Water and sewer tapping fees for new connections are charged separately.
- County Impact Fee (Abbeville County, Industrial)$0.00Abbeville County has not adopted a development impact fee, so no county impact fee applies to nonresidential development inside the City of Abbeville.
Where in Abbeville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Abbeville: Office Impact Fees
Office development in Abbeville pays no per-square-foot impact fees, but owes $1,700.00 in one-time water and sewer connection fees (rates sourced October 28, 2026).
For a 25,000 sq ft building, that comes to about $1,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tapping Fee (Abbeville Public Utilities) — 1" meter ($1,100.00 one-time) and Sewer Tapping Fee (Abbeville Public Utilities) — 4" connection ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Abbeville Impact Fee Schedule
- Water Tapping Fee (Abbeville Public Utilities) — 1" meter$1,100.00 one-timeAbbeville Public Utilities (City of Abbeville)Effective 11/1/2025. Water tapping fee varies by meter size (5/8"x3/4"–over 1.5"). Rates shown are inside-city; outside-city tapping fees run $1,400–$1,700 by meter size.
- Sewer Tapping Fee (Abbeville Public Utilities) — 4" connection$600.00 one-timeAbbeville Public Utilities (City of Abbeville)Effective 11/1/2025. Sewer tapping fee varies by connection size (4"/6"/8"). Rates shown are inside-city; outside-city run $775–$1,400. A 6" or 8" tap that requires setting a manhole is priced at the tap fee plus labor and materials.
- Municipal Impact Fee (City of Abbeville, Office)$0.00The City of Abbeville has not adopted a development impact fee. Water and sewer tapping fees for new connections are charged separately.
- County Impact Fee (Abbeville County, Office)$0.00Abbeville County has not adopted a development impact fee, so no county impact fee applies to nonresidential development inside the City of Abbeville.
Where in Abbeville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Abbeville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Abbeville Impact Fee FAQs
What are the total impact fees for a single-family home in Abbeville, South Carolina?
A new single-family home in Abbeville pays $1,600.00 per unit in combined impact fees (rates sourced October 28, 2026).
How much are commercial impact fees in Abbeville?
Commercial development in Abbeville pays no per-square-foot impact fees, but owes $1,700.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Abbeville charge its own impact fees?
Yes. Abbeville levies its own municipal impact or utility fees. Abbeville County does not currently add county-level impact fees inside Abbeville. The schedule on this page shows every fee that applies to development in Abbeville.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Abbeville County impact fees page.