Aiken, South Carolina Impact Fees

Aiken applies its own fee schedule: municipal fees plus the Aiken County-levied fees that apply inside city limits. Combined, a new single-family home pays $5,980.55 per unit (rates sourced ). The full breakdown is below.

Aiken Impact Fees by Project Type

Aiken: Single-Family Impact Fees

A new single-family home in Aiken pays $5,980.55 per unit in impact fees (rates sourced October 28, 2026). Of that, Aiken County-levied fees account for $2,994.75 and municipal or utility fees for $2,985.80.

The largest line items are Sewer Capacity Impact Fee (City of Aiken) — 275 GPD x $10.89/gal ($2,994.75), Water Tap & Meter Charge (City of Aiken) — 3/4" meter, 1" tap ($1,335.80) and Residential Water Impact Fee (City of Aiken) — citywide ($750.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Aiken Impact Fee Schedule
Water$2,085.80
  • Water Tap & Meter Charge (City of Aiken) — 3/4" meter, 1" tap
    City of Aiken Engineering & Utilities
    Inside-city water tap and meter charge for a 3/4 inch meter on a 1 inch tap ($2,671.60 outside the city). Where the tap already exists, the meter-only charge applies instead. Residential dual check backflow devices are required on meters that supply irrigation or a pool.
    $1,335.80
  • Residential Water Impact Fee (City of Aiken) — citywide
    City of Aiken Engineering & Utilities
    Residential water impact fee of $750 per residential meter, charged in addition to the tap and meter charge. Water taps made on Croft Mill Road owe an extra $325. Irrigation meters carry their own impact fee ($750 for 3/4 inch up to $2,400 for 2 inch).
    $750.00
Sewer$3,894.75
  • Sewer Capacity Impact Fee (City of Aiken) — 275 GPD x $10.89/gal
    City of Aiken (capacity purchased from Aiken County Public Service Authority)
    Sewer capacity impact fee (Ordinance 03092026E, enacted March 9, 2026, assessed on sewer taps from June 1, 2026): design flow times the Aiken County PSA capacity rate of $10.89 per gallon. A single-family home is figured at 275 gallons per day. Applies inside and outside the city.
    $2,994.75
  • Sanitary Sewer Tap Charge (City of Aiken)
    City of Aiken Engineering & Utilities
    Residential sewer tap made by the City: $500 inside the city, $1,000 outside. A residential cleanout installed by the City costs $300 ($600 outside).
    $500.00
  • Residential Sewer Impact Fee (City of Aiken)
    City of Aiken Engineering & Utilities
    Residential sewer impact fee of $400 per residential sewer tap, charged in addition to the sewer tap charge and the sewer capacity impact fee.
    $400.00
City$0.00
  • City Development Impact Fees (City of Aiken)
    City of Aiken
    The City of Aiken levies no development impact fees for roads, parks or public safety. Its water and sewer impact fees are listed with the water and sewer charges.
    $0.00
County$0.00

Aiken: Multifamily Impact Fees

A new multifamily unit in Aiken pays $5,436.05 per unit in impact fees (rates sourced October 28, 2026). Of that, Aiken County-levied fees account for $2,450.25 and municipal or utility fees for $2,985.80.

The largest line items are Water Tap & Meter Charge (City of Aiken, MF) — 3/4" meter, 1" tap ($1,335.80), Residential Water Impact Fee (City of Aiken, MF) — citywide ($750.00) and Sanitary Sewer Tap Charge (City of Aiken, MF) ($500.00).

Sewer Capacity Impact Fee (City of Aiken, MF) — 225 GPD × $10.89/gal is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Aiken Impact Fee Schedule
Water$2,085.80
Sewer$3,350.25
  • Sewer Capacity Impact Fee (City of Aiken, MF) — 225 GPD × $10.89/gal
    City of Aiken (capacity purchased from Aiken County Public Service Authority)
    Sewer capacity impact fee (Ordinance 03092026E, assessed from June 1, 2026): design flow times the Aiken County PSA rate of $10.89 per gallon, applied inside and outside the city. The amount shown is for a two-bedroom apartment at the state design loading of 225 gallons per day; the City approves each project's design flow from sealed engineering calculations.
    $2,450.25Requires confirmation
  • Sanitary Sewer Tap Charge (City of Aiken, MF)
    City of Aiken Engineering & Utilities
    Residential sewer tap made by the City: $500 inside the city, $1,000 outside, charged per tap; a building on one tap pays once.
    $500.00
  • Residential Sewer Impact Fee (City of Aiken, MF)
    City of Aiken Engineering & Utilities
    Residential sewer impact fee of $400 per residential sewer tap: a building on one tap pays it once. Charged in addition to the sewer tap charge and the sewer capacity impact fee.
    $400.00
City$0.00
County$0.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Aiken: Commercial Impact Fees

Commercial development in Aiken pays no per-square-foot impact fees, but owes $1,614.50 in one-time water and sewer connection fees (rates sourced October 28, 2026).

For a 50,000 sq ft building, that comes to at least $1,614.50. The calculator below adjusts to your exact square footage.

The largest line items are Commercial Water Impact Fee (City of Aiken) — citywide ($750.00 one-time), Water Meter Charge (City of Aiken) — 1" meter ($464.50 one-time) and Commercial Sewer Impact Fee (City of Aiken) ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Impact Fee (City of Aiken) — design flow × $10.89/gal PSA rate is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Aiken Impact Fee Schedule
Water$1,214.50 one-time
  • Commercial Water Impact Fee (City of Aiken) — citywide
    City of Aiken
    Commercial water impact fee = (average monthly water consumption in cubic feet divided by 800) times $750; the $750 shown is the per-800-cubic-foot unit. Water taps on Croft Mill Road owe an extra $325. Separate irrigation-meter impact fees apply ($750 for 3/4 inch up to $2,400 for 2 inch).
    $750.00 one-time
  • Water Meter Charge (City of Aiken) — 1" meter
    City of Aiken
    Inside-city water meter charge for a 1 inch meter ($929 outside the city). Commercial taps, service lines and meter boxes are installed by the developer's contractor, and a $100 witness fee applies per utility. Larger meters are priced from the city's large meter schedule, which is updated annually.
    $464.50 one-time
Sewer$400.00 one-time
  • Commercial Sewer Impact Fee (City of Aiken)
    City of Aiken
    Commercial sewer impact fee = (average monthly water consumption in cubic feet ÷ 1,200) × $400; the $400 shown is the per-1,200-cu.ft. unit.
    $400.00 one-time
  • Commercial Sewer Tap Charge (City of Aiken)
    City of Aiken
    Commercial sewer taps are installed by a certified utility contractor; the City charges no sewer tap fee (a $100 witness fee applies per tap).
    $0.00
  • Sewer Capacity Impact Fee (City of Aiken) — design flow × $10.89/gal PSA rate
    City of Aiken
    Sewer Capacity Impact Fee (Ordinance 03092026E, enacted March 9, 2026 and assessed on sewer taps from June 1, 2026): design flow in gallons per day times the Aiken County PSA capacity rate of $10.89 per gallon. Applies to new development and redevelopment that adds wastewater flow, inside and outside the city; capacity is purchased in 5,000-gallon increments.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Aiken): $1,614.50 one-time (≈ $1,614.50 at 50,000 sq ft)
Sources last checked Official fee schedule:City of Aiken
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Aiken County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Aiken: Industrial Impact Fees

Industrial development in Aiken pays no per-square-foot impact fees, but owes $1,614.50 in one-time water and sewer connection fees (rates sourced October 28, 2026).

For a 50,000 sq ft building, that comes to at least $1,614.50. The calculator below adjusts to your exact square footage.

The largest line items are Commercial Water Impact Fee (City of Aiken) — citywide ($750.00 one-time), Water Meter Charge (City of Aiken) — 1" meter ($464.50 one-time) and Commercial Sewer Impact Fee (City of Aiken) ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Impact Fee (City of Aiken) — design flow × $10.89/gal PSA rate is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Aiken Impact Fee Schedule
Water$1,214.50 one-time
  • Commercial Water Impact Fee (City of Aiken) — citywide
    City of Aiken
    Commercial water impact fee = (average monthly water consumption in cubic feet divided by 800) times $750; the $750 shown is the per-800-cubic-foot unit. Water taps on Croft Mill Road owe an extra $325. Separate irrigation-meter impact fees apply ($750 for 3/4 inch up to $2,400 for 2 inch).
    $750.00 one-time
  • Water Meter Charge (City of Aiken) — 1" meter
    City of Aiken
    Inside-city water meter charge for a 1 inch meter ($929 outside the city). Commercial taps, service lines and meter boxes are installed by the developer's contractor, and a $100 witness fee applies per utility. Larger meters are priced from the city's large meter schedule, which is updated annually.
    $464.50 one-time
Sewer$400.00 one-time
  • Commercial Sewer Impact Fee (City of Aiken)
    City of Aiken
    Commercial sewer impact fee = (average monthly water consumption in cubic feet ÷ 1,200) × $400; the $400 shown is the per-1,200-cu.ft. unit.
    $400.00 one-time
  • Commercial Sewer Tap Charge (City of Aiken)
    City of Aiken
    Commercial sewer taps are installed by a certified utility contractor; the City charges no sewer tap fee (a $100 witness fee applies per tap).
    $0.00
  • Sewer Capacity Impact Fee (City of Aiken) — design flow × $10.89/gal PSA rate
    City of Aiken
    Sewer Capacity Impact Fee (Ordinance 03092026E, enacted March 9, 2026 and assessed on sewer taps from June 1, 2026): design flow in gallons per day times the Aiken County PSA capacity rate of $10.89 per gallon. Applies to new development and redevelopment that adds wastewater flow, inside and outside the city; capacity is purchased in 5,000-gallon increments.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Aiken): $1,614.50 one-time (≈ $1,614.50 at 50,000 sq ft)
Sources last checked Official fee schedule:City of Aiken
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Aiken County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Aiken: Office Impact Fees

Office development in Aiken pays no per-square-foot impact fees, but owes $1,614.50 in one-time water and sewer connection fees (rates sourced October 28, 2026).

For a 25,000 sq ft building, that comes to at least $1,614.50. The calculator below adjusts to your exact square footage.

The largest line items are Commercial Water Impact Fee (City of Aiken) — citywide ($750.00 one-time), Water Meter Charge (City of Aiken) — 1" meter ($464.50 one-time) and Commercial Sewer Impact Fee (City of Aiken) ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Impact Fee (City of Aiken) — design flow × $10.89/gal PSA rate is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Aiken Impact Fee Schedule
Water$1,214.50 one-time
  • Commercial Water Impact Fee (City of Aiken) — citywide
    City of Aiken
    Commercial water impact fee = (average monthly water consumption in cubic feet divided by 800) times $750; the $750 shown is the per-800-cubic-foot unit. Water taps on Croft Mill Road owe an extra $325. Separate irrigation-meter impact fees apply ($750 for 3/4 inch up to $2,400 for 2 inch).
    $750.00 one-time
  • Water Meter Charge (City of Aiken) — 1" meter
    City of Aiken
    Inside-city water meter charge for a 1 inch meter ($929 outside the city). Commercial taps, service lines and meter boxes are installed by the developer's contractor, and a $100 witness fee applies per utility. Larger meters are priced from the city's large meter schedule, which is updated annually.
    $464.50 one-time
Sewer$400.00 one-time
  • Commercial Sewer Impact Fee (City of Aiken)
    City of Aiken
    Commercial sewer impact fee = (average monthly water consumption in cubic feet ÷ 1,200) × $400; the $400 shown is the per-1,200-cu.ft. unit.
    $400.00 one-time
  • Commercial Sewer Tap Charge (City of Aiken)
    City of Aiken
    Commercial sewer taps are installed by a certified utility contractor; the City charges no sewer tap fee (a $100 witness fee applies per tap).
    $0.00
  • Sewer Capacity Impact Fee (City of Aiken) — design flow × $10.89/gal PSA rate
    City of Aiken
    Sewer Capacity Impact Fee (Ordinance 03092026E, enacted March 9, 2026 and assessed on sewer taps from June 1, 2026): design flow in gallons per day times the Aiken County PSA capacity rate of $10.89 per gallon. Applies to new development and redevelopment that adds wastewater flow, inside and outside the city; capacity is purchased in 5,000-gallon increments.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Aiken): $1,614.50 one-time (≈ $1,614.50 at 25,000 sq ft)
Sources last checked Official fee schedule:City of Aiken
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Aiken County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Aiken Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Aiken Impact Fee FAQs

What are the total impact fees for a single-family home in Aiken, South Carolina?

A new single-family home in Aiken pays $5,980.55 per unit in combined impact fees (rates sourced October 28, 2026).

How much are commercial impact fees in Aiken?

Commercial development in Aiken pays no per-square-foot impact fees, but owes $1,614.50 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Aiken charge its own impact fees?

Yes. Aiken levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Aiken, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Aiken County impact fees page.