A new single-family home in Anderson pays $10,200.00 per unit in impact fees (rates sourced October 28, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Capacity Reservation Fee (City of Anderson) — $3,500/REU × 1 REU ($3,500.00), Water System Capacity Reservation Fee (City of Anderson) — $3,000/REU × 1 REU ($3,000.00) and Sewer Tapping Fee (City of Anderson) ($2,000.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Anderson Impact Fee Schedule
- Water System Capacity Reservation Fee (City of Anderson) — $3,000/REU × 1 REU$3,000.00City of Anderson (Electric City Utilities)City of Anderson water system capacity reservation fee, since July 1, 2025: $3,000 per residential equivalent unit (a single-family home is one unit). The meter installation fee is separate.
- Water Meter Installation / Tap Fee (City of Anderson) — 3/4-inch meter$1,500.00City of Anderson (Electric City Utilities)Electric City Utilities water meter installation, since July 1, 2024: $1,500 for a 3/4-inch meter, inside or outside the city. Meters 1 inch and larger are charged at cost plus 25%. Street cuts ($230, plus $190 on county roads) are extra where needed. Capacity reservation fees are separate.
- Sewer System Capacity Reservation Fee (City of Anderson) — $3,500/REU × 1 REU$3,500.00City of Anderson (Electric City Utilities)City of Anderson sewer system capacity reservation fee, since July 1, 2025: $3,500 per residential equivalent unit (a single-family home is one unit). Paid before the city issues its capacity letter for the state sewer permit.
- Sewer Tapping Fee (City of Anderson)$2,000.00City of Anderson (Electric City Utilities)City of Anderson residential sewer tap fee, since July 1, 2024: $2,000, inside or outside the city. Street cuts and road bores are extra where needed. The sewer capacity reservation fee is separate.
- New Construction Impact Fee (City of Anderson)$200.00City of AndersonCity of Anderson new construction impact fee: $200 per single-family house, collected with the building permit under the city's comprehensive fee schedule effective July 1, 2022. It is a flat permit-time charge, not a fee under the state Development Impact Fee Act.
- County Impact Fee (Anderson County — City of Anderson)$0.00Anderson County
Where in Anderson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anderson: Multifamily Impact Fees
A new multifamily unit in Anderson pays $10,050.00 per unit in impact fees (rates sourced October 28, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Capacity Reservation Fee (City of Anderson, MF) — $3,500/REU × 1 REU per unit ($3,500.00), Water System Capacity Reservation Fee (City of Anderson, MF) — $3,000/REU × 1 REU per unit ($3,000.00) and Sewer Tapping Fee (City of Anderson, MF) ($2,000.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Anderson Impact Fee Schedule
- Water System Capacity Reservation Fee (City of Anderson, MF) — $3,000/REU × 1 REU per unit$3,000.00City of Anderson (Electric City Utilities)City of Anderson water system capacity reservation fee, since July 1, 2025: $3,000 per residential equivalent unit, charged per dwelling unit. The meter installation fee is separate.
- Water Meter Installation / Tap Fee (City of Anderson, MF) — 3/4-inch meter$1,500.00City of Anderson (Electric City Utilities)Electric City Utilities water meter installation, since July 1, 2024: $1,500 for a 3/4-inch meter. Charged per meter: a building on one meter pays once, and a master meter 1 inch or larger is charged at cost plus 25%.
- Sewer System Capacity Reservation Fee (City of Anderson, MF) — $3,500/REU × 1 REU per unit$3,500.00City of Anderson (Electric City Utilities)City of Anderson sewer system capacity reservation fee, since July 1, 2025: $3,500 per residential equivalent unit, charged per dwelling unit. The sewer tap fee is separate.
- Sewer Tapping Fee (City of Anderson, MF)$2,000.00City of Anderson (Electric City Utilities)City of Anderson residential sewer tap fee, since July 1, 2024: $2,000 per tap, inside or outside the city. Charged per sewer connection: a building on one connection pays once. The per-unit sewer capacity reservation fee is separate.
- New Construction Impact Fee (City of Anderson, MF)$50.00City of AndersonCity of Anderson new construction impact fee for duplex and multifamily buildings: $200 for the first unit plus $50 for each additional unit, with a maximum of $1,000 per project, collected with the building permit (fee schedule effective July 1, 2022). Shown at the $50 additional-unit rate; projects over 17 units pay less per unit because of the cap.
- County Impact Fee (Anderson County — City of Anderson, MF)$0.00Anderson County
Where in Anderson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anderson: Commercial Impact Fees
Commercial development in Anderson pays no per-square-foot impact fees, but owes $10,200.00 in one-time water and sewer connection fees (rates sourced October 28, 2026).
For a 50,000 sq ft building, that comes to about $10,200.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Reservation Fee (City of Anderson) ($3,500.00 one-time), Water System Capacity Reservation Fee (City of Anderson) ($3,000.00 one-time) and Sewer Tapping Fee (City of Anderson) ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Anderson Impact Fee Schedule
- Water System Capacity Reservation Fee (City of Anderson)$3,000.00 one-timeEffective 7/1/2025. $3,000 per Residential Equivalent Unit (REU); a nonresidential project pays one fee per REU of demand.
- Water Meter Installation / Tap Fee (City of Anderson) — 3/4-inch meter$1,500.00 one-time3/4" meterWater meter installation (tap) fee for a 3/4 inch meter: $1,500 inside and outside the city (Ordinance 24-08, effective July 1, 2024). Meters 1 inch and larger are installed at cost plus 25 percent.
- Water Meter Installation / Tap Fee (City of Anderson) — 1-inch and larger meters$0.001" and largerWater meters 1 inch and larger are installed by the City of Anderson at actual cost plus 25 percent (Ordinance 24-08, effective July 1, 2024); no flat fee is published.
- Sewer System Capacity Reservation Fee (City of Anderson)$3,500.00 one-timeEffective 7/1/2025. $3,500 per Residential Equivalent Unit (REU); a nonresidential project pays one fee per REU of demand.
- Sewer Tapping Fee (City of Anderson)$2,000.00 one-timeSewer tapping fee $2,000 per tap inside or outside the city (Ordinance 24-08, effective July 1, 2024). Nonresidential connections are assessed one tap for each 400 gallons per day of estimated flow, and the utility quotes commercial taps based on use. Charged in addition to the sewer capacity reservation fee.
- New Construction Impact Fee (City of Anderson, Commercial)$200.00 one-timeNew construction impact fee of $200 per permit for commercial (nonresidential) construction, City of Anderson Comprehensive Fee Schedule effective July 1, 2022.
- County Impact Fee (Anderson County — Anderson, Commercial)$0.00Anderson County levies no development impact fees.
Where in Anderson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anderson: Industrial Impact Fees
Industrial development in Anderson pays no per-square-foot impact fees, but owes $10,200.00 in one-time water and sewer connection fees (rates sourced October 28, 2026).
For a 50,000 sq ft building, that comes to about $10,200.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Reservation Fee (City of Anderson) ($3,500.00 one-time), Water System Capacity Reservation Fee (City of Anderson) ($3,000.00 one-time) and Sewer Tapping Fee (City of Anderson) ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Anderson Impact Fee Schedule
- Water System Capacity Reservation Fee (City of Anderson)$3,000.00 one-timeEffective 7/1/2025. $3,000 per Residential Equivalent Unit (REU); a nonresidential project pays one fee per REU of demand.
- Water Meter Installation / Tap Fee (City of Anderson) — 3/4-inch meter$1,500.00 one-time3/4" meterWater meter installation (tap) fee for a 3/4 inch meter: $1,500 inside and outside the city (Ordinance 24-08, effective July 1, 2024). Meters 1 inch and larger are installed at cost plus 25 percent.
- Water Meter Installation / Tap Fee (City of Anderson) — 1-inch and larger meters$0.001" and largerWater meters 1 inch and larger are installed by the City of Anderson at actual cost plus 25 percent (Ordinance 24-08, effective July 1, 2024); no flat fee is published.
- Sewer System Capacity Reservation Fee (City of Anderson)$3,500.00 one-timeEffective 7/1/2025. $3,500 per Residential Equivalent Unit (REU); a nonresidential project pays one fee per REU of demand.
- Sewer Tapping Fee (City of Anderson)$2,000.00 one-timeSewer tapping fee $2,000 per tap inside or outside the city (Ordinance 24-08, effective July 1, 2024). Nonresidential connections are assessed one tap for each 400 gallons per day of estimated flow, and the utility quotes commercial taps based on use. Charged in addition to the sewer capacity reservation fee.
- New Construction Impact Fee (City of Anderson, Industrial)$200.00 one-timeNew construction impact fee of $200 per permit for commercial (nonresidential) construction, City of Anderson Comprehensive Fee Schedule effective July 1, 2022.
- County Impact Fee (Anderson County — Anderson, Industrial)$0.00Anderson County levies no development impact fees.
Where in Anderson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anderson: Office Impact Fees
Office development in Anderson pays no per-square-foot impact fees, but owes $10,200.00 in one-time water and sewer connection fees (rates sourced October 28, 2026).
For a 25,000 sq ft building, that comes to about $10,200.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Reservation Fee (City of Anderson) ($3,500.00 one-time), Water System Capacity Reservation Fee (City of Anderson) ($3,000.00 one-time) and Sewer Tapping Fee (City of Anderson) ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Anderson Impact Fee Schedule
- Water System Capacity Reservation Fee (City of Anderson)$3,000.00 one-timeEffective 7/1/2025. $3,000 per Residential Equivalent Unit (REU); a nonresidential project pays one fee per REU of demand.
- Water Meter Installation / Tap Fee (City of Anderson) — 3/4-inch meter$1,500.00 one-time3/4" meterWater meter installation (tap) fee for a 3/4 inch meter: $1,500 inside and outside the city (Ordinance 24-08, effective July 1, 2024). Meters 1 inch and larger are installed at cost plus 25 percent.
- Water Meter Installation / Tap Fee (City of Anderson) — 1-inch and larger meters$0.001" and largerWater meters 1 inch and larger are installed by the City of Anderson at actual cost plus 25 percent (Ordinance 24-08, effective July 1, 2024); no flat fee is published.
- Sewer System Capacity Reservation Fee (City of Anderson)$3,500.00 one-timeEffective 7/1/2025. $3,500 per Residential Equivalent Unit (REU); a nonresidential project pays one fee per REU of demand.
- Sewer Tapping Fee (City of Anderson)$2,000.00 one-timeSewer tapping fee $2,000 per tap inside or outside the city (Ordinance 24-08, effective July 1, 2024). Nonresidential connections are assessed one tap for each 400 gallons per day of estimated flow, and the utility quotes commercial taps based on use. Charged in addition to the sewer capacity reservation fee.
- New Construction Impact Fee (City of Anderson, Office)$200.00 one-timeNew construction impact fee of $200 per permit for commercial (nonresidential) construction, City of Anderson Comprehensive Fee Schedule effective July 1, 2022.
- County Impact Fee (Anderson County — Anderson, Office)$0.00Anderson County levies no development impact fees.
Where in Anderson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anderson Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Anderson Impact Fee FAQs
What are the total impact fees for a single-family home in Anderson, South Carolina?
A new single-family home in Anderson pays $10,200.00 per unit in combined impact fees (rates sourced October 28, 2026).
How much are commercial impact fees in Anderson?
Commercial development in Anderson pays no per-square-foot impact fees, but owes $10,200.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Anderson charge its own impact fees?
Yes. Anderson levies its own municipal impact or utility fees. Anderson County does not currently add county-level impact fees inside Anderson. The schedule on this page shows every fee that applies to development in Anderson.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Anderson County impact fees page.