Govan Impact Fees by Project Type
Govan: Single-Family Impact Fees
Govan has no published impact fee amounts for a new single-family home (rates sourced August 13, 2026). The schedule below documents the status of each fee.
Water Tap / Connection Fee (Olar-Govan Water System) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Govan Impact Fee Schedule
- Water Tap / Connection Fee (Olar-Govan Water System)Requires confirmationOlar-Govan Water SystemWater service in Govan is provided by the Olar-Govan Water System, a joint system owned by the Town of Olar. Its water tap fee is not publicly posted.
- Sewer Tap / Connection Fee (Town of Govan)$0.00Town of GovanThe Town of Govan has no public sewer system. The joint Olar-Govan system provides drinking water only, so homes in Govan use on-site septic systems permitted by the state and pay no municipal sewer tap fee.
- City Impact / Development Fees (Town of Govan)$0.00Town of GovanThe Town of Govan has not adopted a development impact fee. South Carolina law only allows impact fees after a detailed study and ordinance, and only a small number of South Carolina jurisdictions have done so; this one is not among them.
- County Impact Fees (Bamberg County) — Town of Govan$0.00Bamberg CountyBamberg County has not adopted a development impact fee, so no county impact fee applies to new homes in Govan.
Where in Bamberg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Govan: Multifamily Impact Fees
Govan has no published impact fee amounts for a new multifamily unit (rates sourced August 13, 2026). The schedule below documents the status of each fee.
Water Tap / Connection Fee (Olar-Govan Water System, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Govan Impact Fee Schedule
- Water Tap / Connection Fee (Olar-Govan Water System, MF)Requires confirmationOlar-Govan Water SystemWater service in Govan is provided by the Olar-Govan Water System, a joint system owned by the Town of Olar. Its water tap fee is not publicly posted.
- Sewer Tap / Connection Fee (Town of Govan, MF)$0.00Town of GovanThe Town of Govan has no public sewer system. The joint Olar-Govan system provides drinking water only, so homes in Govan use on-site septic systems permitted by the state and pay no municipal sewer tap fee.
- City Impact / Development Fees (Town of Govan, MF)$0.00Town of GovanThe Town of Govan has not adopted a development impact fee. South Carolina law only allows impact fees after a detailed study and ordinance, and only a small number of South Carolina jurisdictions have done so; this one is not among them.
- County Impact Fees (Bamberg County) — Town of Govan (MF)$0.00Bamberg CountyBamberg County has not adopted a development impact fee, so no county impact fee applies to new multifamily units in Govan.
Where in Bamberg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Govan: Commercial Impact Fees
Commercial development in Govan pays no per-square-foot impact fees (rates sourced August 13, 2026).
Water Tap / Capacity Fee (Olar-Govan Water System) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Govan Impact Fee Schedule
- Water Tap / Capacity Fee (Olar-Govan Water System)Requires confirmationWater service in Govan is provided by the Olar-Govan Water System (a joint Olar/Govan system). Nonresidential connection/capacity fees are not publicly posted.
- Sewer Tap / Capacity Fee (Town of Govan)$0.00The Town of Govan has no municipal sewer system; nonresidential development uses on-site septic.
- Development Impact Fee (Town of Govan, Commercial)$0.00The Town of Govan does not levy a development impact fee.
- County Development Impact Fee (Bamberg County, Commercial) — Town of Govan$0.00Bamberg County does not levy a development impact fee.
Where in Bamberg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Govan: Industrial Impact Fees
Industrial development in Govan pays no per-square-foot impact fees (rates sourced August 13, 2026).
Water Tap / Capacity Fee (Olar-Govan Water System) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Govan Impact Fee Schedule
- Water Tap / Capacity Fee (Olar-Govan Water System)Requires confirmationWater service in Govan is provided by the Olar-Govan Water System (a joint Olar/Govan system). Nonresidential connection/capacity fees are not publicly posted.
- Sewer Tap / Capacity Fee (Town of Govan)$0.00The Town of Govan has no municipal sewer system; nonresidential development uses on-site septic.
- Development Impact Fee (Town of Govan, Industrial)$0.00The Town of Govan does not levy a development impact fee.
- County Development Impact Fee (Bamberg County, Industrial) — Town of Govan$0.00Bamberg County does not levy a development impact fee.
Where in Bamberg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Govan: Office Impact Fees
Office development in Govan pays no per-square-foot impact fees (rates sourced August 13, 2026).
Water Tap / Capacity Fee (Olar-Govan Water System) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Govan Impact Fee Schedule
- Water Tap / Capacity Fee (Olar-Govan Water System)Requires confirmationWater service in Govan is provided by the Olar-Govan Water System (a joint Olar/Govan system). Nonresidential connection/capacity fees are not publicly posted.
- Sewer Tap / Capacity Fee (Town of Govan)$0.00The Town of Govan has no municipal sewer system; nonresidential development uses on-site septic.
- Development Impact Fee (Town of Govan, Office)$0.00The Town of Govan does not levy a development impact fee.
- County Development Impact Fee (Bamberg County, Office) — Town of Govan$0.00Bamberg County does not levy a development impact fee.
Where in Bamberg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Govan Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Govan Impact Fee FAQs
How much are commercial impact fees in Govan?
Govan does not currently levy impact fees on commercial development.
Does Govan charge its own impact fees?
Yes. Govan levies its own municipal impact or utility fees. Bamberg County does not currently add county-level impact fees inside Govan. The schedule on this page shows every fee that applies to development in Govan.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Bamberg County impact fees page.