Skip to content
IMPACTFEES.ORG

Manning, South Carolina Impact Fees

Manning applies its own fee schedule. Clarendon County does not currently add county-level impact fees inside city limits. A new single-family home pays $3,280.00 per unit (rates sourced ). The full breakdown is below.

Manning Impact Fees by Project Type

Manning: Single-Family Impact Fees

A new single-family home in Manning pays $3,280.00 per unit in impact fees (rates sourced August 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Manning) ($1,200.00), Water Tap Fee (City of Manning) — 3/4" meter ($1,200.00) and Sewer Capacity (Impact) Fee (City of Manning) ($440.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Manning Impact Fee Schedule
Water$1,640.00
  • Water Tap Fee (City of Manning) — 3/4" meter
    In-town, 3/4" meter
    City of Manning
    City of Manning residential water tap fee for a 3/4 inch meter inside city limits under the FY2025-2026 fee schedule; a 1 inch meter is $1,500. Where the city must bore under or open-cut a roadway, the tap is billed at actual cost plus 20%. The separate $440 water impact fee is charged in addition.
    $1,200.00
  • Water Capacity (Impact) Fee (City of Manning)
    City of Manning
    City of Manning water capacity (impact) fee under the FY2025-2026 fee schedule, a flat one-time charge for a new water connection, paid in addition to the water tap fee.
    $440.00
Sewer$1,640.00
  • Sewer Tap Fee (City of Manning)
    City of Manning
    City of Manning residential sewer tap fee inside city limits under the FY2025-2026 fee schedule (based on a 4 inch service). Where the city must bore under or open-cut a roadway, the tap is billed at actual cost plus 20%. The separate $440 sewer impact fee is charged in addition.
    $1,200.00
  • Sewer Capacity (Impact) Fee (City of Manning)
    City of Manning
    City of Manning sewer capacity (impact) fee under the FY2025-2026 fee schedule, a flat one-time charge for a new sewer connection, paid in addition to the sewer tap fee.
    $440.00
County$0.00
Total (Manning): $3,280.00
Sources last checked Official fee schedules:City of Manning Clarendon County

Where in Clarendon County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manning: Multifamily Impact Fees

A new multifamily unit in Manning pays $3,280.00 per unit in impact fees (rates sourced August 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Manning, MF) ($1,200.00), Water Tap Fee (City of Manning, MF) — 3/4" meter ($1,200.00) and Water Capacity (Impact) Fee (City of Manning, MF) ($440.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Manning Impact Fee Schedule
Water$1,640.00
  • Water Tap Fee (City of Manning, MF) — 3/4" meter
    In-town, 3/4" meter, per unit
    City of Manning
    City of Manning water tap fee per unit for a 3/4 inch meter inside city limits under the FY2025-2026 fee schedule; a 1 inch meter is $1,500. Manning's water and sewer rate schedule (July 1, 2025) requires new multifamily developments to meter each unit individually, so each unit pays its own tap. Where the city must bore under or open-cut a roadway, the tap is billed at actual cost plus 20%. The separate $440 water impact fee is charged in addition.
    $1,200.00
  • Water Capacity (Impact) Fee (City of Manning, MF)
    City of Manning
    City of Manning water capacity (impact) fee under the FY2025-2026 fee schedule, a flat one-time charge per new connection. New multifamily developments must meter each unit individually, so each unit pays it.
    $440.00
Sewer$1,640.00
  • Sewer Tap Fee (City of Manning, MF)
    City of Manning
    City of Manning sewer tap fee per unit inside city limits under the FY2025-2026 fee schedule (based on a 4 inch service). Each unit of a new multifamily development is metered and billed separately. Where the city must bore under or open-cut a roadway, the tap is billed at actual cost plus 20%. The separate $440 sewer impact fee is charged in addition.
    $1,200.00
  • Sewer Capacity (Impact) Fee (City of Manning, MF)
    City of Manning
    City of Manning sewer capacity (impact) fee under the FY2025-2026 fee schedule, a flat one-time charge per new connection. New multifamily developments must meter each unit individually, so each unit pays it.
    $440.00
Total (Manning): $3,280.00
Sources last checked Official fee schedules:City of Manning Clarendon County

Where in Clarendon County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manning: Commercial Impact Fees

Commercial development in Manning pays no per-square-foot impact fees, but owes $3,780.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).

For a 50,000 sq ft building, that comes to about $3,780.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Manning, Commercial) — 1" meter ($1,500.00 one-time), Sewer Tap Fee (City of Manning, Commercial) ($1,400.00 one-time) and Sewer Capacity (Impact) Fee (City of Manning) ($440.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Manning Impact Fee Schedule
Water$1,940.00 one-time
  • Water Tap Fee (City of Manning, Commercial) — 1" meter
    City of Manning
    One-time commercial water tap fee, City of Manning (in-town), effective July 1, 2025. In-town by meter: 3/4" $1,300, 1" $1,500, 1.5" $2,150, 2" $2,700. Out-of-town (rural) rates are higher; meters over 2" set at actual cost plus 20%.
    $1,500.00 one-time
  • Water Capacity (Impact) Fee (City of Manning)
    City of Manning
    One-time water capacity (impact) fee, City of Manning; flat $440 regardless of meter size. Charged in addition to the water tap fee.
    $440.00 one-time
Sewer$1,840.00 one-time
  • Sewer Tap Fee (City of Manning, Commercial)
    City of Manning
    One-time commercial sewer tap fee, City of Manning: $1,400 in-town / $1,700 out-of-town. Where a roadway bore/open-cut is required, the fee is actual cost plus 20%. Effective July 1, 2025.
    $1,400.00 one-time
  • Sewer Capacity (Impact) Fee (City of Manning)
    City of Manning
    One-time sewer capacity (impact) fee, City of Manning; flat $440. Charged in addition to the sewer tap fee.
    $440.00 one-time
City$0.00
County$0.00
Total (Manning): $3,780.00 one-time (≈ $3,780.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Manning Clarendon County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clarendon County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manning: Industrial Impact Fees

Industrial development in Manning pays no per-square-foot impact fees, but owes $3,780.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).

For a 50,000 sq ft building, that comes to about $3,780.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Manning, Commercial) — 1" meter ($1,500.00 one-time), Sewer Tap Fee (City of Manning, Commercial) ($1,400.00 one-time) and Sewer Capacity (Impact) Fee (City of Manning) ($440.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Manning Impact Fee Schedule
Water$1,940.00 one-time
  • Water Tap Fee (City of Manning, Commercial) — 1" meter
    City of Manning
    One-time commercial water tap fee, City of Manning (in-town), effective July 1, 2025. In-town by meter: 3/4" $1,300, 1" $1,500, 1.5" $2,150, 2" $2,700. Out-of-town (rural) rates are higher; meters over 2" set at actual cost plus 20%.
    $1,500.00 one-time
  • Water Capacity (Impact) Fee (City of Manning)
    City of Manning
    One-time water capacity (impact) fee, City of Manning; flat $440 regardless of meter size. Charged in addition to the water tap fee.
    $440.00 one-time
Sewer$1,840.00 one-time
  • Sewer Tap Fee (City of Manning, Commercial)
    City of Manning
    One-time commercial sewer tap fee, City of Manning: $1,400 in-town / $1,700 out-of-town. Where a roadway bore/open-cut is required, the fee is actual cost plus 20%. Effective July 1, 2025.
    $1,400.00 one-time
  • Sewer Capacity (Impact) Fee (City of Manning)
    City of Manning
    One-time sewer capacity (impact) fee, City of Manning; flat $440. Charged in addition to the sewer tap fee.
    $440.00 one-time
City$0.00
County$0.00
Total (Manning): $3,780.00 one-time (≈ $3,780.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Manning Clarendon County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clarendon County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manning: Office Impact Fees

Office development in Manning pays no per-square-foot impact fees, but owes $3,780.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).

For a 25,000 sq ft building, that comes to about $3,780.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Manning, Commercial) — 1" meter ($1,500.00 one-time), Sewer Tap Fee (City of Manning, Commercial) ($1,400.00 one-time) and Sewer Capacity (Impact) Fee (City of Manning) ($440.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Manning Impact Fee Schedule
Water$1,940.00 one-time
  • Water Tap Fee (City of Manning, Commercial) — 1" meter
    City of Manning
    One-time commercial water tap fee, City of Manning (in-town), effective July 1, 2025. In-town by meter: 3/4" $1,300, 1" $1,500, 1.5" $2,150, 2" $2,700. Out-of-town (rural) rates are higher; meters over 2" set at actual cost plus 20%.
    $1,500.00 one-time
  • Water Capacity (Impact) Fee (City of Manning)
    City of Manning
    One-time water capacity (impact) fee, City of Manning; flat $440 regardless of meter size. Charged in addition to the water tap fee.
    $440.00 one-time
Sewer$1,840.00 one-time
  • Sewer Tap Fee (City of Manning, Commercial)
    City of Manning
    One-time commercial sewer tap fee, City of Manning: $1,400 in-town / $1,700 out-of-town. Where a roadway bore/open-cut is required, the fee is actual cost plus 20%. Effective July 1, 2025.
    $1,400.00 one-time
  • Sewer Capacity (Impact) Fee (City of Manning)
    City of Manning
    One-time sewer capacity (impact) fee, City of Manning; flat $440. Charged in addition to the sewer tap fee.
    $440.00 one-time
City$0.00
County$0.00
Total (Manning): $3,780.00 one-time (≈ $3,780.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Manning Clarendon County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clarendon County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manning Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Manning Impact Fee FAQs

What are the total impact fees for a single-family home in Manning, South Carolina?

A new single-family home in Manning pays $3,280.00 per unit in combined impact fees (rates sourced August 14, 2026).

How much are commercial impact fees in Manning?

Commercial development in Manning pays no per-square-foot impact fees, but owes $3,780.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Manning charge its own impact fees?

Yes. Manning levies its own municipal impact or utility fees. Clarendon County does not currently add county-level impact fees inside Manning. The schedule on this page shows every fee that applies to development in Manning.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Clarendon County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000