Varnville Impact Fees by Project Type
Varnville: Single-Family Impact Fees
A new single-family home in Varnville pays $6,800.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU ($2,400.00), Sewer Tap Fee (Lowcountry Regional Water System) ($1,000.00) and Water Tap Fee (Lowcountry Regional Water System) ($1,000.00).
Water Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Varnville Impact Fee Schedule
- Water Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU$2,400.00Requires confirmationLowcountry Regional Water System$2,400 per Residential Equivalent Unit (REU), shown at 1 REU per home. LRWS defines its water REU as 150 gallons per day and sets larger users' REU counts from their demand. Rate effective October 1, 2025; the September 2026 rate proposal left capacity fees unchanged.
- Water Tap Fee (Lowcountry Regional Water System)$1,000.00Lowcountry Regional Water SystemLowcountry Regional Water System (LRWS) provides water. $1,000 covers a standard residential meter (generally 3/4 in.); larger connections are billed at actual cost. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU$2,400.00Lowcountry Regional Water System$2,400 per Residential Equivalent Unit (REU), defined as 300 gallons per day, the design flow of a single-family home. Rate effective October 1, 2025; the September 2026 rate proposal left capacity fees unchanged. Charged in addition to the sewer tap fee.
- Sewer Tap Fee (Lowcountry Regional Water System)$1,000.00Lowcountry Regional Water SystemLowcountry Regional Water System (LRWS) provides sewer. $1,000 covers a standard residential gravity connection (typically 4 in.); larger or other connection types are billed at actual cost. Charged in addition to the sewer capacity fee.
- Municipal Impact Fee (Town of Varnville)$0.00Town of VarnvilleThe Town of Varnville has not adopted a development impact fee; its zoning ordinance and published town ordinances contain none. Water and sewer service is provided by the Lowcountry Regional Water System.
- County Impact Fee (Hampton County)$0.00Hampton CountyHampton County has not adopted a development impact fee, so no county impact fee applies. South Carolina requires an adopted comprehensive plan before a county can impose one; the county's new 2040 plan was recommended by its Planning Commission in August 2026.
Where in Hampton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Varnville: Multifamily Impact Fees
A new multifamily unit in Varnville pays at least $3,800.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (Lowcountry Regional Water System, MF) ($1,000.00) and Water Tap Fee (Lowcountry Regional Water System, MF) ($1,000.00).
Sewer Capacity Fee (Lowcountry Regional Water System, MF) — 0.75 REU × $2,400/REU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Capacity Fee (Lowcountry Regional Water System, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Varnville Impact Fee Schedule
- Water Tap Fee (Lowcountry Regional Water System, MF)$1,000.00Lowcountry Regional Water System$1,000 for a standard residential meter (generally 3/4 in.). A building served by one connection pays once; connections larger than the standard meter are billed at actual cost. Charged in addition to the water capacity fee.
- Water Capacity Fee (Lowcountry Regional Water System, MF)Requires confirmationLowcountry Regional Water SystemLRWS charges $2,400 per Residential Equivalent Unit (150 gallons per day for water) and sets the unit count for multifamily and commercial projects from their demand; it publishes no per-apartment figure.
- Sewer Capacity Fee (Lowcountry Regional Water System, MF) — 0.75 REU × $2,400/REU$1,800.00Requires confirmationLowcountry Regional Water SystemShown at 0.75 REU per apartment (a 2-bedroom unit at 225 gallons per day against the 300 gallon REU) at $2,400 per REU. LRWS sets multifamily unit counts from project demand, so the per-unit amount can differ. Rate effective October 1, 2025.
- Sewer Tap Fee (Lowcountry Regional Water System, MF)$1,000.00Lowcountry Regional Water System$1,000 for a standard residential gravity connection (typically 4 in.). A building served by one connection pays once; larger or other connection types are billed at actual cost. Charged in addition to the sewer capacity fee.
- Municipal Impact Fee (Town of Varnville, MF)$0.00Town of VarnvilleThe Town of Varnville has not adopted a development impact fee; its zoning ordinance and published town ordinances contain none. Water and sewer service is provided by the Lowcountry Regional Water System.
- County Impact Fee (Hampton County, MF)$0.00Hampton CountyHampton County has not adopted a development impact fee, so no county impact fee applies. South Carolina requires an adopted comprehensive plan before a county can impose one; the county's new 2040 plan was recommended by its Planning Commission in August 2026.
Where in Hampton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Varnville: Commercial Impact Fees
Commercial development in Varnville pays no per-square-foot impact fees, but owes $6,800.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $6,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Lowcountry Regional Water System) ($1,000.00 one-time) and Sewer Tap Fee (Lowcountry Regional Water System) ($1,000.00 one-time).
Sewer Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU and Water Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Varnville Impact Fee Schedule
- Water Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU$2,400.00 one-timeRequires confirmationLowcountry Regional Water SystemWater capacity fee is $2,400 per Residential Equivalent Unit (REU; one water REU is 150 gallons per day), effective October 1, 2025. For commercial customers the REU count is calculated by LRWS Engineering from the size of the structure, employees, seats, and fixtures; the amount shown is the one-REU minimum. Charged in addition to the tap fee.
- Water Tap Fee (Lowcountry Regional Water System)$1,000.00 one-timeLowcountry Regional Water SystemWater tap fee is $1,000 for a standard meter connection (generally 3/4-inch); larger connections are billed at actual cost. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU$2,400.00 one-timeRequires confirmationLowcountry Regional Water SystemSewer impact/capacity fee is $2,400 per Residential Equivalent Unit (REU; 1 REU = 300 gallons/day), effective 10/1/2025. For commercial customers the REU count is calculated by LRWS Engineering from the size of the structure, employees, seats, and fixtures; the amount shown is the one-REU minimum. Charged in addition to the tap fee.
- Sewer Tap Fee (Lowcountry Regional Water System)$1,000.00 one-timeLowcountry Regional Water SystemSewer tap fee is $1,000 for a standard gravity connection (typically a 4-inch lateral); larger connections or other connection types are billed at actual cost. Charged in addition to the sewer capacity fee.
- Municipal Impact Fee (Town of Varnville, Commercial)$0.00Town of VarnvilleThe Town of Varnville does not levy a municipal impact fee.
- County Impact Fee (Hampton County, Commercial)$0.00Hampton CountyHampton County does not levy a development impact fee.
Where in Hampton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Varnville: Industrial Impact Fees
Industrial development in Varnville pays no per-square-foot impact fees, but owes $6,800.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $6,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Lowcountry Regional Water System) ($1,000.00 one-time) and Sewer Tap Fee (Lowcountry Regional Water System) ($1,000.00 one-time).
Sewer Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU and Water Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Varnville Impact Fee Schedule
- Water Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU$2,400.00 one-timeRequires confirmationLowcountry Regional Water SystemWater capacity fee is $2,400 per Residential Equivalent Unit (REU; one water REU is 150 gallons per day), effective October 1, 2025. For commercial customers the REU count is calculated by LRWS Engineering from the size of the structure, employees, seats, and fixtures; the amount shown is the one-REU minimum. Charged in addition to the tap fee.
- Water Tap Fee (Lowcountry Regional Water System)$1,000.00 one-timeLowcountry Regional Water SystemWater tap fee is $1,000 for a standard meter connection (generally 3/4-inch); larger connections are billed at actual cost. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU$2,400.00 one-timeRequires confirmationLowcountry Regional Water SystemSewer impact/capacity fee is $2,400 per Residential Equivalent Unit (REU; 1 REU = 300 gallons/day), effective 10/1/2025. For commercial customers the REU count is calculated by LRWS Engineering from the size of the structure, employees, seats, and fixtures; the amount shown is the one-REU minimum. Charged in addition to the tap fee.
- Sewer Tap Fee (Lowcountry Regional Water System)$1,000.00 one-timeLowcountry Regional Water SystemSewer tap fee is $1,000 for a standard gravity connection (typically a 4-inch lateral); larger connections or other connection types are billed at actual cost. Charged in addition to the sewer capacity fee.
- Municipal Impact Fee (Town of Varnville, Industrial)$0.00Town of VarnvilleThe Town of Varnville does not levy a municipal impact fee.
- County Impact Fee (Hampton County, Industrial)$0.00Hampton CountyHampton County does not levy a development impact fee.
Where in Hampton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Varnville: Office Impact Fees
Office development in Varnville pays no per-square-foot impact fees, but owes $6,800.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to about $6,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Lowcountry Regional Water System) ($1,000.00 one-time) and Sewer Tap Fee (Lowcountry Regional Water System) ($1,000.00 one-time).
Sewer Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU and Water Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Varnville Impact Fee Schedule
- Water Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU$2,400.00 one-timeRequires confirmationLowcountry Regional Water SystemWater capacity fee is $2,400 per Residential Equivalent Unit (REU; one water REU is 150 gallons per day), effective October 1, 2025. For commercial customers the REU count is calculated by LRWS Engineering from the size of the structure, employees, seats, and fixtures; the amount shown is the one-REU minimum. Charged in addition to the tap fee.
- Water Tap Fee (Lowcountry Regional Water System)$1,000.00 one-timeLowcountry Regional Water SystemWater tap fee is $1,000 for a standard meter connection (generally 3/4-inch); larger connections are billed at actual cost. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (Lowcountry Regional Water System) — 1 REU × $2,400/REU$2,400.00 one-timeRequires confirmationLowcountry Regional Water SystemSewer impact/capacity fee is $2,400 per Residential Equivalent Unit (REU; 1 REU = 300 gallons/day), effective 10/1/2025. For commercial customers the REU count is calculated by LRWS Engineering from the size of the structure, employees, seats, and fixtures; the amount shown is the one-REU minimum. Charged in addition to the tap fee.
- Sewer Tap Fee (Lowcountry Regional Water System)$1,000.00 one-timeLowcountry Regional Water SystemSewer tap fee is $1,000 for a standard gravity connection (typically a 4-inch lateral); larger connections or other connection types are billed at actual cost. Charged in addition to the sewer capacity fee.
- Municipal Impact Fee (Town of Varnville, Office)$0.00Town of VarnvilleThe Town of Varnville does not levy a municipal impact fee.
- County Impact Fee (Hampton County, Office)$0.00Hampton CountyHampton County does not levy a development impact fee.
Where in Hampton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Varnville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Varnville Impact Fee FAQs
What are the total impact fees for a single-family home in Varnville, South Carolina?
A new single-family home in Varnville pays $6,800.00 per unit in combined impact fees (rates sourced November 11, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Varnville?
Commercial development in Varnville pays no per-square-foot impact fees, but owes $6,800.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Varnville charge its own impact fees?
Yes. Varnville levies its own municipal impact or utility fees. Hampton County does not currently add county-level impact fees inside Varnville. The schedule on this page shows every fee that applies to development in Varnville.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Hampton County impact fees page.