Ridgeland Impact Fees by Project Type
Ridgeland: Single-Family Impact Fees
A new single-family home in Ridgeland pays at least $5,584.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Capacity Fee (Town of Ridgeland) — 1 REU × $3,142/REU ($3,142.00) and Water and Sewer Tap Fee (Town of Ridgeland) — 3/4" meter ($1,231.00).
Water Capacity Fee (Town of Ridgeland) — 1 REU × $1,211/REU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Ridgeland) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Ridgeland Impact Fee Schedule
- Water and Sewer Tap Fee (Town of Ridgeland) — 3/4" meter$1,231.00Town of Ridgeland Water & Sewer DepartmentThe Town of Ridgeland charges one combined water and sewer tap fee set by meter size; a standard home uses the 3/4 inch meter. It is separate from the town's water and sewer capacity fees.
- Water Capacity Fee (Town of Ridgeland) — 1 REU × $1,211/REU$1,211.00Requires confirmationTown of Ridgeland Water & Sewer DepartmentThe Town of Ridgeland charges a one-time water capacity fee per residential equivalency unit (400 gallons per day), the same inside and outside town limits, under its rate ordinance effective July 1, 2026. A single-family home is shown as one unit.
- Sewer Capacity Fee (Town of Ridgeland) — 1 REU × $3,142/REU$3,142.00Town of Ridgeland Water & Sewer DepartmentThe Town of Ridgeland charges a one-time sewer capacity fee of one residential equivalency unit (300 gallons per day) per single-family home, the same inside and outside town limits, under its rate ordinance effective July 1, 2026.
- Sewer Tap Fee (Town of Ridgeland)$0.00Town of Ridgeland Water & Sewer DepartmentThe Town of Ridgeland charges no separate sewer tap fee; the sewer tap is included in its combined water and sewer tap fee, which is set by meter size.
- City Impact Fee (Town of Ridgeland)Requires confirmationTown of RidgelandThe Town of Ridgeland is adding development impact fees for law enforcement, fire protection and parks and recreation (an ordinance adding Code Sections 2-458 through 2-475 had its public hearing and second reading on August 20, 2026). The adopted amounts and effective date are not yet published. The town's water and sewer capacity fees are separate utility charges.
- County Impact Fee (Jasper County, via Ridgeland)$0.00Jasper CountyJasper County has not adopted a development impact fee, so no county impact fee applies inside Ridgeland.
Where in Jasper County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ridgeland: Multifamily Impact Fees
A new multifamily unit in Ridgeland pays at least $4,268.69 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water and Sewer Tap Fee (Town of Ridgeland, MF) — 3/4" meter ($1,231.00).
Water Capacity Fee (Town of Ridgeland, MF) — 0.5625 REU × $1,211/REU and Sewer Capacity Fee (Town of Ridgeland, MF) — 0.75 REU × $3,142/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Ridgeland, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Ridgeland Impact Fee Schedule
- Water and Sewer Tap Fee (Town of Ridgeland, MF) — 3/4" meter$1,231.00Town of Ridgeland Water & Sewer DepartmentThe Town of Ridgeland charges one combined water and sewer tap fee per meter, set by meter size, not per unit. The default shown is the 3/4 inch tap; larger taps run $1,294 (1 inch) to $13,000 (10 inch), and a building served by one meter pays the tap fee once.
- Water Capacity Fee (Town of Ridgeland, MF) — 0.5625 REU × $1,211/REU$681.19Requires confirmationTown of Ridgeland Water & Sewer DepartmentThe Town of Ridgeland charges a one-time water capacity fee of $1,211 per residential equivalency unit (400 gallons per day), the same inside and outside town limits. The ordinance gives no multifamily unit count; the amount shown rates a 2-bedroom apartment at 225 gallons per day.
- Sewer Capacity Fee (Town of Ridgeland, MF) — 0.75 REU × $3,142/REU$2,356.50Requires confirmationTown of Ridgeland Water & Sewer DepartmentThe Town of Ridgeland charges a one-time sewer capacity fee of $3,142 per residential equivalency unit (300 gallons per day), the same inside and outside town limits. The ordinance gives no multifamily unit count; the amount shown rates a 2-bedroom apartment at 225 gallons per day (0.75 unit).
- Sewer Tap Fee (Town of Ridgeland, MF)$0.00Town of Ridgeland Water & Sewer DepartmentThe Town of Ridgeland charges no separate sewer tap fee; the sewer tap is included in its combined water and sewer tap fee, which is set by meter size.
- City Impact Fee (Town of Ridgeland, MF)Requires confirmationTown of RidgelandThe Town of Ridgeland is adding development impact fees for law enforcement, fire protection and parks and recreation (an ordinance adding Code Sections 2-458 through 2-475 had its public hearing and second reading on August 20, 2026). The adopted amounts and effective date are not yet published. The town's water and sewer capacity fees are separate utility charges.
- County Impact Fee (Jasper County, via Ridgeland, MF)$0.00Jasper CountyJasper County has not adopted a development impact fee, so no county impact fee applies inside Ridgeland.
Where in Jasper County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ridgeland: Commercial Impact Fees
Commercial development in Ridgeland pays no per-square-foot impact fees, but owes $5,647.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $5,647.00. The calculator below adjusts to your exact square footage.
The largest line items are Water & Sewer Tap Fee (Town of Ridgeland) — 1" meter ($1,294.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (Town of Ridgeland) — 1 REU × $3,142/REU and Water Capacity Fee (Town of Ridgeland) — 1 REU × $1,211/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Ridgeland, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Ridgeland Impact Fee Schedule
- Water & Sewer Tap Fee (Town of Ridgeland) — 1" meter$1,294.00 one-timeTown of Ridgeland Water & Sewer DepartmentCombined water and sewer tap fee (Town of Ridgeland), effective July 1, 2026, by meter size: one charge covers both the water tap and the sewer tap, inside or outside town limits. Separate from the water and sewer capacity fees.
- Water Capacity Fee (Town of Ridgeland) — 1 REU × $1,211/REU$1,211.00 one-timeRequires confirmationTown of Ridgeland Water & Sewer DepartmentTown of Ridgeland water capacity fee, effective July 1, 2026: $1,211 per residential equivalent unit (REU, 400 gallons per day), the same inside and outside town limits. Shown at one REU; a larger commercial project pays for more REUs. A combined water and sewer tap fee applies separately by meter size.
- Sewer Capacity Fee (Town of Ridgeland) — 1 REU × $3,142/REU$3,142.00 one-timeRequires confirmationTown of Ridgeland Water & Sewer DepartmentTown of Ridgeland sewer capacity fee, effective July 1, 2026: $3,142 per residential equivalent unit (REU, 300 gallons per day), the same inside and outside town limits. Shown at one REU; a larger commercial project pays for more REUs. A combined water and sewer tap fee applies separately by meter size.
- City Impact Fee (Town of Ridgeland, Commercial)Requires confirmationTown of RidgelandThe Town of Ridgeland is adding development impact fees for law enforcement and fire protection that would reach nonresidential development (an ordinance adding Code Sections 2-458 through 2-475 had its public hearing and second reading on August 20, 2026). The adopted amounts and effective date are not yet published. Town water and sewer fees are separate.
- County Impact Fee (Jasper County, via Ridgeland, Commercial)$0.00Jasper CountyJasper County has not adopted a development impact fee for nonresidential development.
Where in Jasper County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ridgeland: Industrial Impact Fees
Industrial development in Ridgeland pays no per-square-foot impact fees, but owes $5,647.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $5,647.00. The calculator below adjusts to your exact square footage.
The largest line items are Water & Sewer Tap Fee (Town of Ridgeland) — 1" meter ($1,294.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (Town of Ridgeland) — 1 REU × $3,142/REU and Water Capacity Fee (Town of Ridgeland) — 1 REU × $1,211/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Ridgeland, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Ridgeland Impact Fee Schedule
- Water & Sewer Tap Fee (Town of Ridgeland) — 1" meter$1,294.00 one-timeTown of Ridgeland Water & Sewer DepartmentCombined water and sewer tap fee (Town of Ridgeland), effective July 1, 2026, by meter size: one charge covers both the water tap and the sewer tap, inside or outside town limits. Separate from the water and sewer capacity fees.
- Water Capacity Fee (Town of Ridgeland) — 1 REU × $1,211/REU$1,211.00 one-timeRequires confirmationTown of Ridgeland Water & Sewer DepartmentTown of Ridgeland water capacity fee, effective July 1, 2026: $1,211 per residential equivalent unit (REU, 400 gallons per day), the same inside and outside town limits. Shown at one REU; a larger commercial project pays for more REUs. A combined water and sewer tap fee applies separately by meter size.
- Sewer Capacity Fee (Town of Ridgeland) — 1 REU × $3,142/REU$3,142.00 one-timeRequires confirmationTown of Ridgeland Water & Sewer DepartmentTown of Ridgeland sewer capacity fee, effective July 1, 2026: $3,142 per residential equivalent unit (REU, 300 gallons per day), the same inside and outside town limits. Shown at one REU; a larger commercial project pays for more REUs. A combined water and sewer tap fee applies separately by meter size.
- City Impact Fee (Town of Ridgeland, Industrial)Requires confirmationTown of RidgelandThe Town of Ridgeland is adding development impact fees for law enforcement and fire protection that would reach nonresidential development (an ordinance adding Code Sections 2-458 through 2-475 had its public hearing and second reading on August 20, 2026). The adopted amounts and effective date are not yet published. Town water and sewer fees are separate.
- County Impact Fee (Jasper County, via Ridgeland, Industrial)$0.00Jasper CountyJasper County has not adopted a development impact fee for nonresidential development.
Where in Jasper County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ridgeland: Office Impact Fees
Office development in Ridgeland pays no per-square-foot impact fees, but owes $5,647.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to at least $5,647.00. The calculator below adjusts to your exact square footage.
The largest line items are Water & Sewer Tap Fee (Town of Ridgeland) — 1" meter ($1,294.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (Town of Ridgeland) — 1 REU × $3,142/REU and Water Capacity Fee (Town of Ridgeland) — 1 REU × $1,211/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Ridgeland, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Ridgeland Impact Fee Schedule
- Water & Sewer Tap Fee (Town of Ridgeland) — 1" meter$1,294.00 one-timeTown of Ridgeland Water & Sewer DepartmentCombined water and sewer tap fee (Town of Ridgeland), effective July 1, 2026, by meter size: one charge covers both the water tap and the sewer tap, inside or outside town limits. Separate from the water and sewer capacity fees.
- Water Capacity Fee (Town of Ridgeland) — 1 REU × $1,211/REU$1,211.00 one-timeRequires confirmationTown of Ridgeland Water & Sewer DepartmentTown of Ridgeland water capacity fee, effective July 1, 2026: $1,211 per residential equivalent unit (REU, 400 gallons per day), the same inside and outside town limits. Shown at one REU; a larger commercial project pays for more REUs. A combined water and sewer tap fee applies separately by meter size.
- Sewer Capacity Fee (Town of Ridgeland) — 1 REU × $3,142/REU$3,142.00 one-timeRequires confirmationTown of Ridgeland Water & Sewer DepartmentTown of Ridgeland sewer capacity fee, effective July 1, 2026: $3,142 per residential equivalent unit (REU, 300 gallons per day), the same inside and outside town limits. Shown at one REU; a larger commercial project pays for more REUs. A combined water and sewer tap fee applies separately by meter size.
- City Impact Fee (Town of Ridgeland, Office)Requires confirmationTown of RidgelandThe Town of Ridgeland is adding development impact fees for law enforcement and fire protection that would reach nonresidential development (an ordinance adding Code Sections 2-458 through 2-475 had its public hearing and second reading on August 20, 2026). The adopted amounts and effective date are not yet published. Town water and sewer fees are separate.
- County Impact Fee (Jasper County, via Ridgeland, Office)$0.00Jasper CountyJasper County has not adopted a development impact fee for nonresidential development.
Where in Jasper County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ridgeland Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Ridgeland Impact Fee FAQs
What are the total impact fees for a single-family home in Ridgeland, South Carolina?
A new single-family home in Ridgeland pays at least $5,584.00 per unit in combined impact fees (rates sourced November 11, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Ridgeland?
Commercial development in Ridgeland pays no per-square-foot impact fees, but owes $5,647.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Ridgeland charge its own impact fees?
Yes. Ridgeland levies its own municipal impact or utility fees. Jasper County does not currently add county-level impact fees inside Ridgeland. The schedule on this page shows every fee that applies to development in Ridgeland.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Jasper County impact fees page.