Impact fees in Lancaster County depend on where you build. This page details the rates for unincorporated Lancaster County: at least $20,308.00 per single-family unit as of . This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Lancaster County Impact Fees by Project Type

Where in Lancaster County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lancaster County: Single-Family Impact Fees

A new single-family home in unincorporated Lancaster County pays at least $20,308.00 per unit in impact fees (rates sourced November 12, 2026). All of it is levied by Lancaster County.

The largest line items are School Development Impact Fee (Lancaster County School District) — Panhandle School Service Area ($9,507.00), Sewer Capacity Fee (LCWSD) — 1 REU × $5,350/REU ($5,350.00) and Water Capacity Fee (LCWSD) — 1 REU × $3,200/REU ($3,200.00).

Lancaster County Development Impact Fees — Parks & Rec + Sheriff + EMS + Fire is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Tap Fee (LCWSD) and Sewer Tap Fee (LCWSD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Lancaster County Impact Fee Schedule
Water$3,200.00
  • Water Capacity Fee (LCWSD) — 1 REU × $3,200/REU
    5/8 x 3/4 in meter
    Lancaster County Water and Sewer District (LCWSD)
    Lancaster County Water and Sewer District (LCWSD) water capacity fee, effective August 1, 2026: $3,200 per residential equivalent unit (REU). A standard 5/8 x 3/4 inch meter is 1 REU; a 1 inch meter is 2.5 REU ($8,000). LCWSD also charges a separate water tap fee at connection.
    $3,200.00
  • Water Tap Fee (LCWSD)
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD charges a water tap fee at connection in addition to its capacity fee. The district does not publish the tap fee amount, so it is not included in this total.
    Requires confirmation
Sewer$5,350.00
  • Sewer Capacity Fee (LCWSD) — 1 REU × $5,350/REU
    5/8 x 3/4 in meter
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD sewer capacity fee, effective August 1, 2026: $5,350 per residential equivalent unit (REU). A standard 5/8 x 3/4 inch meter is 1 REU; a 1 inch meter is 2.5 REU ($13,375). A separate LCWSD sewer tap fee also applies at connection.
    $5,350.00
  • Sewer Tap Fee (LCWSD)
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD charges a sewer tap fee at connection in addition to its capacity fee, plus a sewer tap inspection fee. The district does not publish the tap fee amount, so it is not included in this total.
    Requires confirmation
County$11,758.00
  • School Development Impact Fee (Lancaster County School District) — Panhandle School Service Area
    Indian Land / Panhandle School Service Area
    Lancaster County (for the Lancaster County School District)
    Lancaster County collects a school development impact fee for the Lancaster County School District on new homes in the Panhandle school service area (Indian Land): $9,507 per single-family unit in fiscal year 2027 (unchanged from July 1, 2025). Collected when the building permit is issued. The county adjusts the fee each year with its budget.
    $9,507.00
  • Lancaster County Development Impact Fees — Parks & Rec + Sheriff + EMS + Fire
    Indian Land / Van Wyck Fire District
    Lancaster County
    Lancaster County development impact fees for a detached home in the Indian Land and Van Wyck fire districts, fiscal year 2027 (unchanged from July 1, 2025): Parks and Recreation $908, Sheriff $141, EMS $130 and Fire $1,072. The fees apply only in the Greater Panhandle and vary by fire district; this is the highest of the district rates. Collected when the building permit is issued. The county adjusts the schedule each year with its budget.
    $2,251.00Requires confirmation
Total (unincorporated Lancaster County): $20,308.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lancaster County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lancaster County: Multifamily Impact Fees

A new multifamily unit in unincorporated Lancaster County pays at least $18,101.00 per unit in impact fees (rates sourced November 12, 2026). All of it is levied by Lancaster County.

The largest line items are School Development Impact Fee (Lancaster County School District) (MF) ($10,086.00), Sewer Capacity Fee (LCWSD, MF) — 2 BR, 3/4 REU ($4,013.00) and Water Capacity Fee (LCWSD, MF) — 2 BR, 3/4 REU ($2,400.00).

Lancaster County Development Impact Fees — Parks & Rec + Sheriff + EMS + Fire (MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Tap Fee (LCWSD, MF) and Water Tap Fee (LCWSD, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Lancaster County Impact Fee Schedule
Water$2,400.00
  • Water Capacity Fee (LCWSD, MF) — 2 BR, 3/4 REU
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD water capacity fee per attached unit (apartments, condominiums, townhomes), effective August 1, 2026, by bedrooms: 1 BR $1,600, 2 BR $2,400, 3 or more BR $3,200. A separate LCWSD water tap fee also applies at connection.
    $2,400.00
  • Water Tap Fee (LCWSD, MF)
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD charges a water tap fee at connection in addition to its capacity fee. The district does not publish the tap fee amount, so it is not included in this total.
    Requires confirmation
Sewer$4,013.00
  • Sewer Capacity Fee (LCWSD, MF) — 2 BR, 3/4 REU
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD sewer capacity fee per attached unit (apartments, condominiums, townhomes), effective August 1, 2026, by bedrooms: 1 BR $2,675, 2 BR $4,013, 3 or more BR $5,350. A separate LCWSD sewer tap fee also applies at connection.
    $4,013.00
  • Sewer Tap Fee (LCWSD, MF)
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD charges a sewer tap fee at connection in addition to its capacity fee, plus a sewer tap inspection fee. The district does not publish the tap fee amount, so it is not included in this total.
    Requires confirmation
County$11,688.00
  • School Development Impact Fee (Lancaster County School District) (MF)
    Indian Land / Panhandle School Service Area
    Lancaster County (for the Lancaster County School District)
    Lancaster County collects a school development impact fee for the Lancaster County School District on new housing in the Panhandle school service area (Indian Land): $10,086 per multifamily unit in fiscal year 2027 (unchanged from July 1, 2025). Collected when the building permit is issued. The county adjusts the fee each year with its budget.
    $10,086.00
  • Lancaster County Development Impact Fees — Parks & Rec + Sheriff + EMS + Fire (MF)
    Indian Land / Van Wyck Fire District
    Lancaster County
    Lancaster County development impact fees per multifamily unit in the Indian Land and Van Wyck fire districts, fiscal year 2027 (unchanged from July 1, 2025): Parks and Recreation $646, Sheriff $100, EMS $94 and Fire $762. The fees apply only in the Greater Panhandle and vary by fire district; this is the highest of the district rates. Collected when the building permit is issued. The county adjusts the schedule each year with its budget.
    $1,602.00Requires confirmation
Total (unincorporated Lancaster County): $18,101.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lancaster County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lancaster County: Commercial Impact Fees

Commercial development in unincorporated Lancaster County pays $2.05 per square foot in impact fees, plus $10,688.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 50,000 sq ft building, that comes to at least $112,988.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Development Impact Fees — Sheriff/EMS/Fire (Lancaster County, Commercial), Water Capacity Fee (LCWSD) — 1" meter, and Sewer Capacity Fee (LCWSD) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Tap Fee (LCWSD) and Water Tap Fee (LCWSD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lancaster County Impact Fee Schedule
Water$4,000.00 one-time
  • Water Capacity Fee (LCWSD) — 1" meter
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD water capacity fee for nonresidential service, effective August 1, 2026, priced by meter size in residential equivalent units (REU) at the printed non-residential rate of $1,600 per REU. The schedule also states a 50 percent reduction on non-residential capacity fees for commercial and industrial users (not apartments); the amount shown does not deduct it. A separate LCWSD water tap fee also applies.
    $4,000.00 one-timeRequires confirmation
  • Water Tap Fee (LCWSD)
    Lancaster County Water and Sewer District (LCWSD)
    A separate LCWSD tap / meter-installation fee applies in addition to the capacity fee; the commercial amount varies by meter size and is quoted by the District.
    Requires confirmation
Sewer$6,688.00 one-time
  • Sewer Capacity Fee (LCWSD) — 1" meter
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD sewer capacity fee for nonresidential service, effective August 1, 2026, priced by meter size in residential equivalent units (REU) at the printed non-residential rate of $2,675 per REU. The schedule also states a 50 percent reduction on non-residential capacity fees for commercial and industrial users (not apartments); the amount shown does not deduct it. A separate LCWSD sewer tap fee also applies.
    $6,688.00 one-timeRequires confirmation
  • Sewer Tap Fee (LCWSD)
    Lancaster County Water and Sewer District (LCWSD)
    A separate LCWSD sewer tap fee plus a $20 tap-inspection fee applies in addition to the sewer capacity fee; the commercial amount is quoted by the District.
    Requires confirmation
County$2.05/sq ft
  • County Development Impact Fees — Sheriff/EMS/Fire (Lancaster County, Commercial)
    Indian Land / Van Wyck Fire Districts
    Lancaster County
    Lancaster County Sheriff, EMS and Fire development impact fees on retail and other commercial space, per 1,000 sq ft of gross floor area, fiscal year 2027 (unchanged from fiscal year 2026): Fire $1,713, EMS $116 and Sheriff $217. This is the Indian Land and Van Wyck fire district rate, the highest of the county's rate tiers (Pleasant Valley has a lower fire rate), and the fees apply only in the northern Greater Panhandle. The county Parks and Recreation fee is not charged on nonresidential space. Collected when the building permit is issued; the county resets the schedule each year with its budget.
    $2.05/sq ftRequires confirmation
Total (unincorporated Lancaster County): $2.05/sq ft + $10,688.00 one-time (≈ $112,988.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Lancaster County Water and Sewer District (LCWSD) Lancaster County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lancaster County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lancaster County: Industrial Impact Fees

Industrial development in unincorporated Lancaster County pays $0.35 per square foot in impact fees, plus $10,688.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 50,000 sq ft building, that comes to at least $28,338.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Development Impact Fees — Sheriff/EMS/Fire (Lancaster County, Industrial), Water Capacity Fee (LCWSD) — 1" meter, and Sewer Capacity Fee (LCWSD) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Tap Fee (LCWSD) and Water Tap Fee (LCWSD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lancaster County Impact Fee Schedule
Water$4,000.00 one-time
  • Water Capacity Fee (LCWSD) — 1" meter
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD water capacity fee for nonresidential service, effective August 1, 2026, priced by meter size in residential equivalent units (REU) at the printed non-residential rate of $1,600 per REU. The schedule also states a 50 percent reduction on non-residential capacity fees for commercial and industrial users (not apartments); the amount shown does not deduct it. A separate LCWSD water tap fee also applies.
    $4,000.00 one-timeRequires confirmation
  • Water Tap Fee (LCWSD)
    Lancaster County Water and Sewer District (LCWSD)
    A separate LCWSD tap / meter-installation fee applies in addition to the capacity fee; the commercial amount varies by meter size and is quoted by the District.
    Requires confirmation
Sewer$6,688.00 one-time
  • Sewer Capacity Fee (LCWSD) — 1" meter
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD sewer capacity fee for nonresidential service, effective August 1, 2026, priced by meter size in residential equivalent units (REU) at the printed non-residential rate of $2,675 per REU. The schedule also states a 50 percent reduction on non-residential capacity fees for commercial and industrial users (not apartments); the amount shown does not deduct it. A separate LCWSD sewer tap fee also applies.
    $6,688.00 one-timeRequires confirmation
  • Sewer Tap Fee (LCWSD)
    Lancaster County Water and Sewer District (LCWSD)
    A separate LCWSD sewer tap fee plus a $20 tap-inspection fee applies in addition to the sewer capacity fee; the commercial amount is quoted by the District.
    Requires confirmation
County$0.35/sq ft
  • County Development Impact Fees — Sheriff/EMS/Fire (Lancaster County, Industrial)
    Indian Land / Van Wyck Fire Districts
    Lancaster County
    Lancaster County Sheriff, EMS and Fire development impact fees on industrial space, per 1,000 sq ft of gross floor area, fiscal year 2027 (unchanged from fiscal year 2026): Fire $296, EMS $20 and Sheriff $37. This is the Indian Land and Van Wyck fire district rate, the highest of the county's rate tiers (Pleasant Valley has a lower fire rate), and the fees apply only in the northern Greater Panhandle. Warehouse space has its own lower rates.
    $0.35/sq ftRequires confirmation
Total (unincorporated Lancaster County): $0.35/sq ft + $10,688.00 one-time (≈ $28,338.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Lancaster County Water and Sewer District (LCWSD) Lancaster County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lancaster County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lancaster County: Office Impact Fees

Office development in unincorporated Lancaster County pays $0.69 per square foot in impact fees, plus $10,688.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 25,000 sq ft building, that comes to at least $28,038.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Development Impact Fees — Sheriff/EMS/Fire (Lancaster County, Office), Water Capacity Fee (LCWSD) — 1" meter, and Sewer Capacity Fee (LCWSD) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Tap Fee (LCWSD) and Water Tap Fee (LCWSD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lancaster County Impact Fee Schedule
Water$4,000.00 one-time
  • Water Capacity Fee (LCWSD) — 1" meter
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD water capacity fee for nonresidential service, effective August 1, 2026, priced by meter size in residential equivalent units (REU) at the printed non-residential rate of $1,600 per REU. The schedule also states a 50 percent reduction on non-residential capacity fees for commercial and industrial users (not apartments); the amount shown does not deduct it. A separate LCWSD water tap fee also applies.
    $4,000.00 one-timeRequires confirmation
  • Water Tap Fee (LCWSD)
    Lancaster County Water and Sewer District (LCWSD)
    A separate LCWSD tap / meter-installation fee applies in addition to the capacity fee; the commercial amount varies by meter size and is quoted by the District.
    Requires confirmation
Sewer$6,688.00 one-time
  • Sewer Capacity Fee (LCWSD) — 1" meter
    Lancaster County Water and Sewer District (LCWSD)
    LCWSD sewer capacity fee for nonresidential service, effective August 1, 2026, priced by meter size in residential equivalent units (REU) at the printed non-residential rate of $2,675 per REU. The schedule also states a 50 percent reduction on non-residential capacity fees for commercial and industrial users (not apartments); the amount shown does not deduct it. A separate LCWSD sewer tap fee also applies.
    $6,688.00 one-timeRequires confirmation
  • Sewer Tap Fee (LCWSD)
    Lancaster County Water and Sewer District (LCWSD)
    A separate LCWSD sewer tap fee plus a $20 tap-inspection fee applies in addition to the sewer capacity fee; the commercial amount is quoted by the District.
    Requires confirmation
County$0.69/sq ft
  • County Development Impact Fees — Sheriff/EMS/Fire (Lancaster County, Office)
    Indian Land / Van Wyck Fire Districts
    Lancaster County
    Lancaster County Sheriff, EMS and Fire development impact fees on office space, per 1,000 sq ft of gross floor area, fiscal year 2027 (unchanged from fiscal year 2026): Fire $581, EMS $40 and Sheriff $73. This is the Indian Land and Van Wyck fire district rate, the highest of the county's rate tiers (Pleasant Valley has a lower fire rate), and the fees apply only in the northern Greater Panhandle. The county Parks and Recreation fee is not charged on nonresidential space.
    $0.69/sq ftRequires confirmation
Total (unincorporated Lancaster County): $0.69/sq ft + $10,688.00 one-time (≈ $28,038.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Lancaster County Water and Sewer District (LCWSD) Lancaster County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Lancaster County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Lancaster County Impact Fee FAQs

What are single-family impact fees in Lancaster County, South Carolina?

A new single-family home in unincorporated Lancaster County pays at least $20,308.00 per unit in impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Lancaster County?

Multifamily development in unincorporated Lancaster County pays at least $18,101.00 per unit in impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Lancaster County?

Commercial development in unincorporated Lancaster County pays $2.05 per square foot in impact fees, plus $10,688.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $112,988.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Do cities in Lancaster County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 1 of 4 cities in Lancaster County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.