Nichols Impact Fees by Project Type
Nichols: Single-Family Impact Fees
A new single-family home in Nichols pays at least $5,770.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (GSWSA) ($2,735.00), Water Impact Fee (GSWSA) ($1,225.00) and Sewer Tap Fee (GSWSA) ($1,020.00).
City Impact Fee (Town of Nichols) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Nichols Impact Fee Schedule
- Water Impact Fee (GSWSA)$1,225.00Grand Strand Water & Sewer AuthorityGrand Strand Water and Sewer Authority water impact fee: $1,225 per residential equivalent unit, and a home counts as one unit. GSWSA bought and runs the former Town of Nichols water system.
- Water Tap Fee (GSWSA) — new tap$790.00Grand Strand Water & Sewer AuthorityGSWSA water tap fee for a new service tap. Where a tap was already made, for example on a lot in a developer-built subdivision, GSWSA charges a $630 meter base fee instead, never both. Separate from the water impact fee; a $40 new service installation fee also applies.
- Sewer Impact Fee (GSWSA)$2,735.00Grand Strand Water & Sewer AuthorityGrand Strand Water and Sewer Authority sewer impact fee: $2,735 per residential equivalent unit, and a home counts as one unit. GSWSA runs the Nichols wastewater system.
- Sewer Tap Fee (GSWSA)$1,020.00Grand Strand Water & Sewer AuthorityGrand Strand Water and Sewer Authority sewer tap fee for a standard residential service connection, plus an $80 sewer connection inspection fee. Deeper or nonstandard taps are priced higher. Separate from the sewer impact fee.
- City Impact Fee (Town of Nichols)Requires confirmationTown of NicholsThe Town of Nichols does not operate its own utilities; Grand Strand Water & Sewer Authority purchased and now runs the town's water and wastewater systems. The town publishes no development fee schedule.
- County Impact Fee (Marion County)$0.00Marion County
Where in Marion County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nichols: Multifamily Impact Fees
A new multifamily unit in Nichols pays at least $5,770.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (GSWSA, MF) — 1 REU per dwelling unit × $2,735/REU ($2,735.00), Water Impact Fee (GSWSA, MF) — 1 REU per dwelling unit × $1,225/REU ($1,225.00) and Sewer Tap Fee (GSWSA, MF) ($1,020.00).
City Impact Fee (Town of Nichols, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Nichols Impact Fee Schedule
- Water Impact Fee (GSWSA, MF) — 1 REU per dwelling unit × $1,225/REU$1,225.00Grand Strand Water & Sewer AuthorityGrand Strand Water and Sewer Authority water impact fee: $1,225 per residential equivalent unit. GSWSA counts each dwelling unit as one unit, whether single family or multifamily and whether individually or master metered.
- Water Tap Fee (GSWSA, MF) — new tap$790.00Grand Strand Water & Sewer AuthorityCharged per tap, not per unit: a building served by one water connection pays it once. Where a tap was already made, GSWSA charges a $630 meter base fee instead, never both. Separate from the water impact fee.
- Sewer Impact Fee (GSWSA, MF) — 1 REU per dwelling unit × $2,735/REU$2,735.00Grand Strand Water & Sewer AuthorityGrand Strand Water and Sewer Authority sewer impact fee: $2,735 per residential equivalent unit. GSWSA counts each dwelling unit as one unit, whether single family or multifamily and whether individually or master metered.
- Sewer Tap Fee (GSWSA, MF)$1,020.00Grand Strand Water & Sewer AuthorityGrand Strand Water and Sewer Authority sewer tap fee for a standard service connection, plus an $80 sewer connection inspection fee. Charged per connection, not per unit: a building served by one sewer service line pays it once. Separate from the sewer impact fee, which is charged per dwelling unit.
- City Impact Fee (Town of Nichols, MF)Requires confirmationTown of NicholsThe Town of Nichols does not operate its own utilities; Grand Strand Water & Sewer Authority purchased and now runs the town's water and wastewater systems. The town publishes no development fee schedule.
- County Impact Fee (Marion County, MF)$0.00Marion County
Where in Marion County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nichols: Commercial Impact Fees
Commercial development in Nichols pays no per-square-foot impact fees, but owes $17,650.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $17,650.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU, Water Tap Fee (GSWSA), Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU, and Sewer Tap Fee (GSWSA) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Nichols, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Nichols Impact Fee Schedule
- Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU$4,900.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGrand Strand Water & Sewer Authority charges its water impact fee per Residential Equivalent Unit ($1,225 each). A commercial account pays for the higher of the minimum units for its meter size (4 for a 1" meter) or its calculated demand, so this is a floor. Paid in addition to the water tap fee. Certain areas carry supplemental impact fees.
- Water Tap Fee (GSWSA)$790.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGSWSA water tap fee, the only tap price GSWSA publishes; commercial taps and larger meters are quoted by GSWSA. Where a tap was already made, a meter base fee is charged instead of the tap fee, never both. A $40 new service installation fee also applies.
- Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU$10,940.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGrand Strand Water & Sewer Authority charges its sewer impact fee per Residential Equivalent Unit ($2,735 each). A commercial account pays for the higher of the minimum units for its water meter size (4 for a 1" meter) or its calculated demand, so this is a floor. Paid in addition to the sewer tap fee. Certain areas carry supplemental impact fees.
- Sewer Tap Fee (GSWSA)$1,020.00 one-timeRequires confirmationGrand Strand Water & Sewer Authority$1,020 sewer tap plus an $80 connection inspection fee. Larger commercial connections are priced individually by Grand Strand Water & Sewer Authority.
- Requires confirmation
- $0.00
Where in Marion County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nichols: Industrial Impact Fees
Industrial development in Nichols pays no per-square-foot impact fees, but owes $17,650.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $17,650.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU, Water Tap Fee (GSWSA), Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU, and Sewer Tap Fee (GSWSA) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Nichols, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Nichols Impact Fee Schedule
- Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU$4,900.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGrand Strand Water & Sewer Authority charges its water impact fee per Residential Equivalent Unit ($1,225 each). A commercial account pays for the higher of the minimum units for its meter size (4 for a 1" meter) or its calculated demand, so this is a floor. Paid in addition to the water tap fee. Certain areas carry supplemental impact fees.
- Water Tap Fee (GSWSA)$790.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGSWSA water tap fee, the only tap price GSWSA publishes; commercial taps and larger meters are quoted by GSWSA. Where a tap was already made, a meter base fee is charged instead of the tap fee, never both. A $40 new service installation fee also applies.
- Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU$10,940.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGrand Strand Water & Sewer Authority charges its sewer impact fee per Residential Equivalent Unit ($2,735 each). A commercial account pays for the higher of the minimum units for its water meter size (4 for a 1" meter) or its calculated demand, so this is a floor. Paid in addition to the sewer tap fee. Certain areas carry supplemental impact fees.
- Sewer Tap Fee (GSWSA)$1,020.00 one-timeRequires confirmationGrand Strand Water & Sewer Authority$1,020 sewer tap plus an $80 connection inspection fee. Larger commercial connections are priced individually by Grand Strand Water & Sewer Authority.
- Requires confirmation
- $0.00
Where in Marion County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nichols: Office Impact Fees
Office development in Nichols pays no per-square-foot impact fees, but owes $17,650.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 25,000 sq ft building, that comes to at least $17,650.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU, Water Tap Fee (GSWSA), Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU, and Sewer Tap Fee (GSWSA) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Nichols, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Nichols Impact Fee Schedule
- Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU$4,900.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGrand Strand Water & Sewer Authority charges its water impact fee per Residential Equivalent Unit ($1,225 each). A commercial account pays for the higher of the minimum units for its meter size (4 for a 1" meter) or its calculated demand, so this is a floor. Paid in addition to the water tap fee. Certain areas carry supplemental impact fees.
- Water Tap Fee (GSWSA)$790.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGSWSA water tap fee, the only tap price GSWSA publishes; commercial taps and larger meters are quoted by GSWSA. Where a tap was already made, a meter base fee is charged instead of the tap fee, never both. A $40 new service installation fee also applies.
- Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU$10,940.00 one-timeRequires confirmationGrand Strand Water & Sewer AuthorityGrand Strand Water & Sewer Authority charges its sewer impact fee per Residential Equivalent Unit ($2,735 each). A commercial account pays for the higher of the minimum units for its water meter size (4 for a 1" meter) or its calculated demand, so this is a floor. Paid in addition to the sewer tap fee. Certain areas carry supplemental impact fees.
- Sewer Tap Fee (GSWSA)$1,020.00 one-timeRequires confirmationGrand Strand Water & Sewer Authority$1,020 sewer tap plus an $80 connection inspection fee. Larger commercial connections are priced individually by Grand Strand Water & Sewer Authority.
- Requires confirmation
- $0.00
Where in Marion County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nichols Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Nichols Impact Fee FAQs
What are the total impact fees for a single-family home in Nichols, South Carolina?
A new single-family home in Nichols pays at least $5,770.00 per unit in combined impact fees (rates sourced November 13, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Nichols?
Commercial development in Nichols pays no per-square-foot impact fees, but owes $17,650.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Nichols charge its own impact fees?
Yes. Nichols levies its own municipal impact or utility fees. Marion County does not currently add county-level impact fees inside Nichols. The schedule on this page shows every fee that applies to development in Nichols.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Marion County impact fees page.