Blenheim Impact Fees by Project Type
Blenheim: Single-Family Impact Fees
A new single-family home in Blenheim pays at least $1,500.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
Water Tap Fee (Marlboro Water Company) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Blenheim) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Blenheim Impact Fee Schedule
- Water Tap Fee (Marlboro Water Company)$1,500.00Requires confirmation3/4"Marlboro Water Company, Inc.Marlboro Water Company residential 3/4 inch tap, effective April 15, 2025; a 1 inch tap is $2,500. The town owns no water system.
- Sewer Connection Fee (Town of Blenheim)$0.00None — no sewer provider (septic)Blenheim has no public sewer; homes use on-site septic systems.
- City Impact Fee (Town of Blenheim)Requires confirmationTown of Blenheim
- County Impact Fee (Marlboro County) — Town of Blenheim$0.00Marlboro County
Where in Marlboro County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blenheim: Multifamily Impact Fees
A new multifamily unit in Blenheim pays at least $1,500.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
Water Tap Fee (Marlboro Water Company, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Blenheim, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Blenheim Impact Fee Schedule
- Water Tap Fee (Marlboro Water Company, MF)$1,500.00Requires confirmation3/4"Marlboro Water Company, Inc.Marlboro Water Company prices taps by meter size only and has no per-unit charge. A multifamily building served by one tap pays this fee once; a 1 inch tap is $2,500. Effective April 15, 2025.
- Sewer Connection Fee (Town of Blenheim, MF)$0.00None — no sewer provider (septic)Blenheim has no public sewer; a multifamily project needs an on-site treatment system permitted by SC DES.
- City Impact Fee (Town of Blenheim, MF)Requires confirmationTown of Blenheim
- County Impact Fee (Marlboro County) — Town of Blenheim (MF)$0.00Marlboro County
Where in Marlboro County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blenheim: Commercial Impact Fees
Commercial development in Blenheim pays no per-square-foot impact fees, but owes $2,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $2,500.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Marlboro Water Company) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Blenheim, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Blenheim Impact Fee Schedule
- Water Tap Fee (Marlboro Water Company) — 1" meter$2,500.00 one-timeRequires confirmationMarlboro Water Company 1 inch tap, effective April 15, 2025; the company publishes residential taps only (3/4 inch and 1 inch) and no separate commercial tap schedule. The town owns no water system.
- Sewer Connection Fee (Town of Blenheim)$0.00The town operates no public sewer system; new development is served by on-site septic.
- Requires confirmation
- $0.00
Where in Marlboro County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blenheim: Industrial Impact Fees
Industrial development in Blenheim pays no per-square-foot impact fees, but owes $2,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $2,500.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Marlboro Water Company) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Blenheim, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Blenheim Impact Fee Schedule
- Water Tap Fee (Marlboro Water Company) — 1" meter$2,500.00 one-timeRequires confirmationMarlboro Water Company 1 inch tap, effective April 15, 2025; the company publishes residential taps only (3/4 inch and 1 inch) and no separate commercial tap schedule. The town owns no water system.
- Sewer Connection Fee (Town of Blenheim)$0.00The town operates no public sewer system; new development is served by on-site septic.
- Requires confirmation
- $0.00
Where in Marlboro County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blenheim: Office Impact Fees
Office development in Blenheim pays no per-square-foot impact fees, but owes $2,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 25,000 sq ft building, that comes to at least $2,500.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Marlboro Water Company) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Blenheim, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Blenheim Impact Fee Schedule
- Water Tap Fee (Marlboro Water Company) — 1" meter$2,500.00 one-timeRequires confirmationMarlboro Water Company 1 inch tap, effective April 15, 2025; the company publishes residential taps only (3/4 inch and 1 inch) and no separate commercial tap schedule. The town owns no water system.
- Sewer Connection Fee (Town of Blenheim)$0.00The town operates no public sewer system; new development is served by on-site septic.
- Requires confirmation
- $0.00
Where in Marlboro County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blenheim Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Blenheim Impact Fee FAQs
What are the total impact fees for a single-family home in Blenheim, South Carolina?
A new single-family home in Blenheim pays at least $1,500.00 per unit in combined impact fees (rates sourced November 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Blenheim?
Commercial development in Blenheim pays no per-square-foot impact fees, but owes $2,500.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Blenheim charge its own impact fees?
Yes. Blenheim levies its own municipal impact or utility fees. Marlboro County does not currently add county-level impact fees inside Blenheim. The schedule on this page shows every fee that applies to development in Blenheim.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.