Plum Branch Impact Fees by Project Type
Plum Branch: Single-Family Impact Fees
A new single-family home in Plum Branch pays at least $6,000.00 per unit in impact fees (rates sourced November 13, 2026). All of it is levied by McCormick County.
The largest line items are Water Tap Fee (McCormick County Water & Sewer) — 3/4" meter ($2,000.00).
Sewer Tap Fee (McCormick County Water & Sewer) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Municipal Development/Impact Fee (Town of Plum Branch) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Plum Branch Impact Fee Schedule
- Water Tap Fee (McCormick County Water & Sewer) — 3/4" meter$2,000.00McCormick County Water and Sewer DepartmentPlum Branch has no town water system; the McCormick County Water and Sewer Department serves it. County tap fee for a 3/4 inch meter, effective July 1, 2026 (raised from $1,000), re-adopted each July. A 1 inch or larger meter costs more.
- Sewer Tap Fee (McCormick County Water & Sewer)$4,000.00Requires confirmationMcCormick County Water and Sewer DepartmentCounty sewer tap fee of $4,000 plus the cost of materials, effective July 1, 2026 (raised from $1,000). County sewer service in Plum Branch is limited; much of the area uses septic or low-pressure tank systems.
- Municipal Development/Impact Fee (Town of Plum Branch)Requires confirmationTown of Plum BranchPlum Branch has no published development impact fee, fee schedule or code of ordinances. Building permits in the town are issued by McCormick County, which has no impact fee.
- County Development Impact Fee (McCormick County) — Plum Branch$0.00McCormick CountyMcCormick County has not adopted a development impact fee. No county impact fee applies in Plum Branch.
Where in McCormick County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plum Branch: Multifamily Impact Fees
A new multifamily unit in Plum Branch pays at least $6,000.00 per unit in impact fees (rates sourced November 13, 2026). All of it is levied by McCormick County.
The largest line items are Water Tap Fee (McCormick County Water & Sewer, MF) — 3/4" meter ($2,000.00).
Sewer Tap Fee (McCormick County Water & Sewer, MF) — Plum Branch is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Municipal Development/Impact Fee (Town of Plum Branch, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Plum Branch Impact Fee Schedule
- Water Tap Fee (McCormick County Water & Sewer, MF) — 3/4" meter$2,000.00McCormick County Water and Sewer DepartmentPlum Branch is served by the McCormick County Water and Sewer Department, which charges tap fees per meter, not per unit: $2,000 for a 3/4 inch meter, effective July 1, 2026. A building served by one connection pays once, at its meter's size.
- Sewer Tap Fee (McCormick County Water & Sewer, MF) — Plum Branch$4,000.00Requires confirmationMcCormick County Water and Sewer DepartmentCounty sewer tap fee of $4,000 plus the cost of materials, effective July 1, 2026, charged per sewer tap; a building served by one tap pays once. County sewer service in Plum Branch is limited; much of the area uses septic or low-pressure tank systems.
- Municipal Development/Impact Fee (Town of Plum Branch, MF)Requires confirmationTown of Plum BranchPlum Branch has no published development impact fee, fee schedule or code of ordinances. Building permits in the town are issued by McCormick County, which has no impact fee.
- County Development Impact Fee (McCormick County, MF) — Plum Branch$0.00McCormick CountyMcCormick County has not adopted a development impact fee. No county impact fee applies in Plum Branch.
Where in McCormick County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plum Branch: Commercial Impact Fees
Commercial development in Plum Branch pays no per-square-foot impact fees, but owes $6,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $6,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (McCormick County Water & Sewer) — 1" & larger meter ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (McCormick County Water & Sewer) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Municipal Development Impact Fee (Town of Plum Branch, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Plum Branch Impact Fee Schedule
- Water Tap Fee (McCormick County Water & Sewer) — 1" & larger meter$2,500.00 one-timeMcCormick County Water & SewerFor a 1" or larger meter, the tap fee is $2,500 plus the incremental cost of the larger meter above a 3/4" meter (billed at actual cost). Effective 7/1/2026, re-adopted annually each July.
- Sewer Tap Fee (McCormick County Water & Sewer)$4,000.00 one-timeRequires confirmationMcCormick County Water & SewerCounty sewer tap is $4,000 plus materials cost (billed at actual cost), effective 7/1/2026 (re-adopted annually each July). County sewer collection in Plum Branch is limited; much of the area is served by septic or low-pressure interceptor systems.
- Municipal Development Impact Fee (Town of Plum Branch, Commercial)Requires confirmationTown of Plum BranchNo Town of Plum Branch development impact fee has been found. Building permits in Plum Branch are issued by McCormick County.
- County Development Impact Fee (McCormick County, Commercial) — Plum Branch$0.00McCormick CountyMcCormick County has not adopted a development impact fee.
Where in McCormick County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plum Branch: Industrial Impact Fees
Industrial development in Plum Branch pays no per-square-foot impact fees, but owes $6,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $6,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (McCormick County Water & Sewer) — 1" & larger meter ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (McCormick County Water & Sewer) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Municipal Development Impact Fee (Town of Plum Branch, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Plum Branch Impact Fee Schedule
- Water Tap Fee (McCormick County Water & Sewer) — 1" & larger meter$2,500.00 one-timeMcCormick County Water & SewerFor a 1" or larger meter, the tap fee is $2,500 plus the incremental cost of the larger meter above a 3/4" meter (billed at actual cost). Effective 7/1/2026, re-adopted annually each July.
- Sewer Tap Fee (McCormick County Water & Sewer)$4,000.00 one-timeRequires confirmationMcCormick County Water & SewerCounty sewer tap is $4,000 plus materials cost (billed at actual cost), effective 7/1/2026 (re-adopted annually each July). County sewer collection in Plum Branch is limited; much of the area is served by septic or low-pressure interceptor systems.
- Municipal Development Impact Fee (Town of Plum Branch, Industrial)Requires confirmationTown of Plum BranchNo Town of Plum Branch development impact fee has been found. Building permits in Plum Branch are issued by McCormick County.
- County Development Impact Fee (McCormick County, Industrial) — Plum Branch$0.00McCormick CountyMcCormick County has not adopted a development impact fee.
Where in McCormick County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plum Branch: Office Impact Fees
Office development in Plum Branch pays no per-square-foot impact fees, but owes $6,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 25,000 sq ft building, that comes to at least $6,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (McCormick County Water & Sewer) — 1" & larger meter ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (McCormick County Water & Sewer) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Municipal Development Impact Fee (Town of Plum Branch, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Plum Branch Impact Fee Schedule
- Water Tap Fee (McCormick County Water & Sewer) — 1" & larger meter$2,500.00 one-timeMcCormick County Water & SewerFor a 1" or larger meter, the tap fee is $2,500 plus the incremental cost of the larger meter above a 3/4" meter (billed at actual cost). Effective 7/1/2026, re-adopted annually each July.
- Sewer Tap Fee (McCormick County Water & Sewer)$4,000.00 one-timeRequires confirmationMcCormick County Water & SewerCounty sewer tap is $4,000 plus materials cost (billed at actual cost), effective 7/1/2026 (re-adopted annually each July). County sewer collection in Plum Branch is limited; much of the area is served by septic or low-pressure interceptor systems.
- Municipal Development Impact Fee (Town of Plum Branch, Office)Requires confirmationTown of Plum BranchNo Town of Plum Branch development impact fee has been found. Building permits in Plum Branch are issued by McCormick County.
- County Development Impact Fee (McCormick County, Office) — Plum Branch$0.00McCormick CountyMcCormick County has not adopted a development impact fee.
Where in McCormick County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plum Branch Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Plum Branch Impact Fee FAQs
What are the total impact fees for a single-family home in Plum Branch, South Carolina?
A new single-family home in Plum Branch pays at least $6,000.00 per unit in combined impact fees (rates sourced November 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Plum Branch?
Commercial development in Plum Branch pays no per-square-foot impact fees, but owes $6,500.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Plum Branch charge its own impact fees?
Yes. Plum Branch levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Plum Branch, with the combined total.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.