Newberry Impact Fees by Project Type
Newberry: Single-Family Impact Fees
A new single-family home in Newberry pays $9,050.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Capacity Fee (City of Newberry) ($2,750.00), Sewer Tap Fee (City of Newberry) ($2,550.00) and Water Tap Fee (City of Newberry) — 5/8" meter ($2,500.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Newberry Impact Fee Schedule
- Water Tap Fee (City of Newberry) — 5/8" meter$2,500.00City of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). The standard 5/8-inch tap is $2,500; larger meters cost more, a splice onto an existing line is $1,150, and a meter set on an existing tap is priced separately. A road bore, where needed, is an added charge. The City's water capacity fee is charged in addition to the tap fee.
- Water Capacity Fee (City of Newberry)$1,250.00City of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A one-time water capacity fee of $1,250 per residential unit (one equivalent residential unit of 300 gallons per day) for new connections to the City's water system, charged in addition to the tap fee.
- Sewer Capacity Fee (City of Newberry)$2,750.00City of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A one-time sewer capacity fee of $2,750 per residential unit (one equivalent residential unit of 300 gallons per day) for new connections to the City's sewer system, charged in addition to the tap fee.
- Sewer Tap Fee (City of Newberry)$2,550.00City of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A standard 4-inch sewer tap is $2,550; 6-inch and larger connections are billed at contractor cost plus $250, and a road bore is billed at actual cost. The City's sewer capacity fee is charged in addition to the tap fee.
- Municipal Impact Fee (City of Newberry)$0.00City of Newberry
- Newberry County Impact Fee$0.00Newberry County
Where in Newberry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Newberry: Multifamily Impact Fees
A new multifamily unit in Newberry pays $9,050.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of Newberry, MF) ($2,550.00) and Water Tap Fee (City of Newberry, MF) — 5/8" meter ($2,500.00).
Sewer Capacity Fee (City of Newberry, MF) and Water Capacity Fee (City of Newberry, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Newberry Impact Fee Schedule
- Water Tap Fee (City of Newberry, MF) — 5/8" meter$2,500.00City of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). The City prices water taps by meter size, starting at $2,500 for a 5/8-inch tap, not per apartment: a building served through one connection pays the tap fee once for that meter. The per-unit water capacity fee is charged in addition.
- Water Capacity Fee (City of Newberry, MF)$1,250.00Requires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). The City's water capacity fee is $1,250 per residential unit for single-family and multifamily development, charged in addition to the tap fee; unusual cases are sized by state flow guidelines.
- Sewer Capacity Fee (City of Newberry, MF)$2,750.00Requires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). The City's sewer capacity fee is $2,750 per residential unit for single-family and multifamily development, charged in addition to the tap fee; unusual cases are sized by state flow guidelines.
- Sewer Tap Fee (City of Newberry, MF)$2,550.00City of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A 4-inch sewer tap is $2,550 and larger connections are billed at contractor cost plus $250. Taps are priced per connection, not per apartment: a building on one sewer connection pays the tap fee once. The per-unit sewer capacity fee is charged in addition.
- Municipal Impact Fee (City of Newberry, MF)$0.00City of Newberry
- Newberry County Impact Fee (MF)$0.00Newberry County
Where in Newberry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Newberry: Commercial Impact Fees
Commercial development in Newberry pays no per-square-foot impact fees, but owes $5,650.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to at least $5,650.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Newberry) — 1" meter ($3,100.00 one-time) and Sewer Tap Fee (City of Newberry) ($2,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of Newberry) — 6" and larger, contractor cost, Sewer Capacity Fee (City of Newberry), and Water Capacity Fee (City of Newberry) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Newberry Impact Fee Schedule
- Water Tap Fee (City of Newberry) — 1" meter$3,100.00 one-timeCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Water tap for a 1-inch meter. Meters above 2 inches are priced at cost plus the meter-only fee; a road bore, where needed, is an added charge. A setting of a meter on an existing tap is priced separately. The City's water capacity fee is charged in addition to the tap fee.
- Water Capacity Fee (City of Newberry)Requires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A one-time water capacity fee applies to new nonresidential connections, set by the project's expected flow under the state's unit contributory flow guidelines. The City's residential rate is $1,250 per equivalent residential unit of 300 gallons per day. Charged in addition to the tap fee.
- Sewer Tap Fee (City of Newberry)$2,550.00 one-timeCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Sewer tap for a standard 4-inch connection. Connections of 6 inches or larger are priced at the contractor's cost plus $250, and a road bore is charged at actual cost. The City's sewer capacity fee is charged in addition to the tap fee.
- Sewer Tap Fee (City of Newberry) — 6" and larger, contractor costRequires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Sewer connections of 6 inches or larger are charged at the contractor's cost plus $250, so no fixed amount is published. The standard 4-inch tap has a set price.
- Sewer Capacity Fee (City of Newberry)Requires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A one-time sewer capacity fee applies to new nonresidential connections, set by the project's expected flow under the state's unit contributory flow guidelines. The City's residential rate is $2,750 per equivalent residential unit of 300 gallons per day. Charged in addition to the tap fee.
- Municipal Impact Fee (City of Newberry, Commercial)$0.00City of Newberry
- County Impact Fee (Newberry County, Commercial)$0.00Newberry County
Where in Newberry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Newberry: Industrial Impact Fees
Industrial development in Newberry pays no per-square-foot impact fees, but owes $5,650.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to at least $5,650.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Newberry) — 1" meter ($3,100.00 one-time) and Sewer Tap Fee (City of Newberry) ($2,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of Newberry) — 6" and larger, contractor cost, Sewer Capacity Fee (City of Newberry), and Water Capacity Fee (City of Newberry) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Newberry Impact Fee Schedule
- Water Tap Fee (City of Newberry) — 1" meter$3,100.00 one-timeCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Water tap for a 1-inch meter. Meters above 2 inches are priced at cost plus the meter-only fee; a road bore, where needed, is an added charge. A setting of a meter on an existing tap is priced separately. The City's water capacity fee is charged in addition to the tap fee.
- Water Capacity Fee (City of Newberry)Requires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A one-time water capacity fee applies to new nonresidential connections, set by the project's expected flow under the state's unit contributory flow guidelines. The City's residential rate is $1,250 per equivalent residential unit of 300 gallons per day. Charged in addition to the tap fee.
- Sewer Tap Fee (City of Newberry)$2,550.00 one-timeCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Sewer tap for a standard 4-inch connection. Connections of 6 inches or larger are priced at the contractor's cost plus $250, and a road bore is charged at actual cost. The City's sewer capacity fee is charged in addition to the tap fee.
- Sewer Tap Fee (City of Newberry) — 6" and larger, contractor costRequires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Sewer connections of 6 inches or larger are charged at the contractor's cost plus $250, so no fixed amount is published. The standard 4-inch tap has a set price.
- Sewer Capacity Fee (City of Newberry)Requires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A one-time sewer capacity fee applies to new nonresidential connections, set by the project's expected flow under the state's unit contributory flow guidelines. The City's residential rate is $2,750 per equivalent residential unit of 300 gallons per day. Charged in addition to the tap fee.
- Municipal Impact Fee (City of Newberry, Industrial)$0.00City of Newberry
- County Impact Fee (Newberry County, Industrial)$0.00Newberry County
Where in Newberry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Newberry: Office Impact Fees
Office development in Newberry pays no per-square-foot impact fees, but owes $5,650.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 25,000 sq ft building, that comes to at least $5,650.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Newberry) — 1" meter ($3,100.00 one-time) and Sewer Tap Fee (City of Newberry) ($2,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of Newberry) — 6" and larger, contractor cost, Sewer Capacity Fee (City of Newberry), and Water Capacity Fee (City of Newberry) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Newberry Impact Fee Schedule
- Water Tap Fee (City of Newberry) — 1" meter$3,100.00 one-timeCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Water tap for a 1-inch meter. Meters above 2 inches are priced at cost plus the meter-only fee; a road bore, where needed, is an added charge. A setting of a meter on an existing tap is priced separately. The City's water capacity fee is charged in addition to the tap fee.
- Water Capacity Fee (City of Newberry)Requires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A one-time water capacity fee applies to new nonresidential connections, set by the project's expected flow under the state's unit contributory flow guidelines. The City's residential rate is $1,250 per equivalent residential unit of 300 gallons per day. Charged in addition to the tap fee.
- Sewer Tap Fee (City of Newberry)$2,550.00 one-timeCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Sewer tap for a standard 4-inch connection. Connections of 6 inches or larger are priced at the contractor's cost plus $250, and a road bore is charged at actual cost. The City's sewer capacity fee is charged in addition to the tap fee.
- Sewer Tap Fee (City of Newberry) — 6" and larger, contractor costRequires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). Sewer connections of 6 inches or larger are charged at the contractor's cost plus $250, so no fixed amount is published. The standard 4-inch tap has a set price.
- Sewer Capacity Fee (City of Newberry)Requires confirmationCity of NewberryEffective July 1, 2026 (Ordinance No. 2026-1004). A one-time sewer capacity fee applies to new nonresidential connections, set by the project's expected flow under the state's unit contributory flow guidelines. The City's residential rate is $2,750 per equivalent residential unit of 300 gallons per day. Charged in addition to the tap fee.
- Municipal Impact Fee (City of Newberry, Office)$0.00City of Newberry
- County Impact Fee (Newberry County, Office)$0.00Newberry County
Where in Newberry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Newberry Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Newberry Impact Fee FAQs
What are the total impact fees for a single-family home in Newberry, South Carolina?
A new single-family home in Newberry pays $9,050.00 per unit in combined impact fees (rates sourced November 14, 2026).
How much are commercial impact fees in Newberry?
Commercial development in Newberry pays no per-square-foot impact fees, but owes $5,650.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Newberry charge its own impact fees?
Yes. Newberry levies its own municipal impact or utility fees. Newberry County does not currently add county-level impact fees inside Newberry. The schedule on this page shows every fee that applies to development in Newberry.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Newberry County impact fees page.