Seneca Impact Fees by Project Type
Seneca: Single-Family Impact Fees
A new single-family home in Seneca pays $6,750.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are OJRSA Sewer Impact/Capacity Fee (Seneca) ($4,100.00), Water Tap Fee (Seneca Light & Water) — 3/4" tap ($1,800.00) and Sewer Tap Fee (City of Seneca) ($850.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Seneca Impact Fee Schedule
- Water Tap Fee (Seneca Light & Water) — 3/4" tap$1,800.00Seneca Light & WaterEffective August 11, 2026 (fiscal year 2027 schedule). Seneca Light & Water charges $1,800 for a 3/4-inch water tap inside the city and $2,200 for a 1-inch tap (outside the city $2,200 and $2,500). Where a contractor makes the tap, the charge is $600 for 3/4-inch and $700 for 1-inch inside the city. A one-time user fee ($600 inside the city) is also billed when service starts. Taps larger than 1 inch cost the 1-inch fee plus labor, materials and the meter.
- OJRSA Sewer Impact/Capacity Fee (Seneca)$4,100.00Oconee Joint Regional Sewer Authority (OJRSA)The Oconee Joint Regional Sewer Authority treats Seneca's sewage and charges its own one-time impact fee on every new sewer connection, in addition to the city's sewer tap fee. A house is one equivalent residential unit (300 gallons per day), $4,100 under the OJRSA fee schedule effective July 1, 2026 (reissued September 14, 2026 with the same impact fees). OJRSA must be paid before the city collects its tap fee.
- Sewer Tap Fee (City of Seneca)$850.00City of Seneca (Seneca Light & Water)Effective August 11, 2026 (fiscal year 2027 schedule). The City of Seneca charges $850 for a 4-inch sewer tap inside the city ($1,050 outside), plus a one-time user fee ($600 inside, $800 outside). This is the city's collection charge only: the Oconee Joint Regional Sewer Authority charges its own sewer impact fee in addition.
- City Impact Fee (City of Seneca)$0.00City of SenecaThe City of Seneca does not charge a development impact fee; new homes pay the city's water and sewer tap fees.
- County Impact Fee (Oconee County)$0.00Oconee CountyOconee County does not charge a development impact fee.
Where in Oconee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seneca: Multifamily Impact Fees
A new multifamily unit in Seneca pays $5,723.50 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are OJRSA Sewer Impact/Capacity Fee (Seneca, MF) — 225 gpd × $13.66/gal ($3,073.50), Water Tap Fee (Seneca Light & Water, MF) — 3/4" tap ($1,800.00) and Sewer Tap Fee (City of Seneca, MF) ($850.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Seneca Impact Fee Schedule
- Water Tap Fee (Seneca Light & Water, MF) — 3/4" tap$1,800.00Seneca Light & WaterEffective August 11, 2026 (fiscal year 2027 schedule). Seneca Light & Water sets its water tap charge by tap size and prints no per-unit rate; the amount shown is the full fee for the smallest (3/4-inch) tap inside the city. A building served by one tap pays it once, not once per unit. A 1-inch tap is $2,200, and a contractor-made tap is $600 (3/4-inch) or $700 (1-inch). A one-time user fee ($600 inside the city) is also billed.
- OJRSA Sewer Impact/Capacity Fee (Seneca, MF) — 225 gpd × $13.66/gal$3,073.50Oconee Joint Regional Sewer Authority (OJRSA)The Oconee Joint Regional Sewer Authority charges its own one-time impact fee on new sewer connections, in addition to the city's sewer tap fee. Apartments and condominiums sharing a sewer connection are charged $13.66 per gallon of daily flow, and the authority's impact fee policy assigns 225 gallons per day to a two-bedroom unit (150 for one bedroom, 300 for three or more), so a two-bedroom unit pays $3,073.50. A unit with its own separate sewer connection is charged as a house, $4,100. Rates effective July 1, 2026.
- Sewer Tap Fee (City of Seneca, MF)$850.00City of Seneca (Seneca Light & Water)Effective August 11, 2026 (fiscal year 2027 schedule). The City of Seneca sets its sewer tap charge by tap size and prints no per-unit rate; the amount shown is the full 4-inch tap fee inside the city ($1,050 outside). A building on one sewer connection pays it once, not once per unit. A one-time user fee ($600 inside the city) is also billed, and the Oconee Joint Regional Sewer Authority charges its own impact fee in addition.
- City Impact Fee (City of Seneca, MF)$0.00City of SenecaThe City of Seneca does not charge a development impact fee; new units pay the city's water and sewer tap fees.
- County Impact Fee (Oconee County, MF)$0.00Oconee CountyOconee County does not charge a development impact fee.
Where in Oconee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seneca: Commercial Impact Fees
Commercial development in Seneca pays no per-square-foot impact fees, but owes $7,150.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to about $7,150.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact/Capacity Fee (OJRSA, Seneca) ($4,100.00 one-time), Water Tap Fee (Seneca Light & Water) — 1" meter ($2,200.00 one-time) and Sewer Tap Fee (City of Seneca) ($850.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Seneca Impact Fee Schedule
- Water Tap Fee (Seneca Light & Water) — 1" meter$2,200.00 one-timeEffective August 11, 2026. Water tap fee for a 1-inch tap inside the city, plus a one-time $600 user fee. Same charge for all customer classes; a larger tap is the 1-inch fee plus labor, materials and the meter. Seneca charges no separate water capacity fee.
- Sewer Impact/Capacity Fee (OJRSA, Seneca)$4,100.00 one-timeOconee Joint Regional Sewer Authority one-time sewer impact fee, charged on every new connection in addition to the city sewer tap. Effective July 1, 2026. Minimum (one equivalent residential unit of 300 gallons per day) is $4,100; larger nonresidential users pay $13.66 per gallon of estimated daily flow (about 200 gallons per 1,000 square feet for retail and office).
- Sewer Tap Fee (City of Seneca)$850.00 one-timeEffective August 11, 2026. City of Seneca 4-inch sewer tap inside the city, plus a one-time $600 user fee. The Oconee Joint Regional Sewer Authority impact fee applies in addition.
- City Impact Fee (City of Seneca, Commercial)$0.00The City of Seneca does not charge a development impact fee; new connections pay the city's water and sewer tap fees.
- County Impact Fee (Oconee County, Commercial)$0.00Oconee County does not charge a development impact fee.
Where in Oconee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seneca: Industrial Impact Fees
Industrial development in Seneca pays no per-square-foot impact fees, but owes $7,150.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to about $7,150.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact/Capacity Fee (OJRSA, Seneca) ($4,100.00 one-time), Water Tap Fee (Seneca Light & Water) — 1" meter ($2,200.00 one-time) and Sewer Tap Fee (City of Seneca) ($850.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Seneca Impact Fee Schedule
- Water Tap Fee (Seneca Light & Water) — 1" meter$2,200.00 one-timeEffective August 11, 2026. Water tap fee for a 1-inch tap inside the city, plus a one-time $600 user fee. Same charge for all customer classes; a larger tap is the 1-inch fee plus labor, materials and the meter. Seneca charges no separate water capacity fee.
- Sewer Impact/Capacity Fee (OJRSA, Seneca)$4,100.00 one-timeOconee Joint Regional Sewer Authority one-time sewer impact fee, charged on every new connection in addition to the city sewer tap. Effective July 1, 2026. Minimum (one equivalent residential unit of 300 gallons per day) is $4,100; larger nonresidential users pay $13.66 per gallon of estimated daily flow (about 200 gallons per 1,000 square feet for retail and office).
- Sewer Tap Fee (City of Seneca)$850.00 one-timeEffective August 11, 2026. City of Seneca 4-inch sewer tap inside the city, plus a one-time $600 user fee. The Oconee Joint Regional Sewer Authority impact fee applies in addition.
- City Impact Fee (City of Seneca, Industrial)$0.00The City of Seneca does not charge a development impact fee; new connections pay the city's water and sewer tap fees.
- County Impact Fee (Oconee County, Industrial)$0.00Oconee County does not charge a development impact fee.
Where in Oconee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seneca: Office Impact Fees
Office development in Seneca pays no per-square-foot impact fees, but owes $7,150.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 25,000 sq ft building, that comes to about $7,150.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact/Capacity Fee (OJRSA, Seneca) ($4,100.00 one-time), Water Tap Fee (Seneca Light & Water) — 1" meter ($2,200.00 one-time) and Sewer Tap Fee (City of Seneca) ($850.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Seneca Impact Fee Schedule
- Water Tap Fee (Seneca Light & Water) — 1" meter$2,200.00 one-timeEffective August 11, 2026. Water tap fee for a 1-inch tap inside the city, plus a one-time $600 user fee. Same charge for all customer classes; a larger tap is the 1-inch fee plus labor, materials and the meter. Seneca charges no separate water capacity fee.
- Sewer Impact/Capacity Fee (OJRSA, Seneca)$4,100.00 one-timeOconee Joint Regional Sewer Authority one-time sewer impact fee, charged on every new connection in addition to the city sewer tap. Effective July 1, 2026. Minimum (one equivalent residential unit of 300 gallons per day) is $4,100; larger nonresidential users pay $13.66 per gallon of estimated daily flow (about 200 gallons per 1,000 square feet for retail and office).
- Sewer Tap Fee (City of Seneca)$850.00 one-timeEffective August 11, 2026. City of Seneca 4-inch sewer tap inside the city, plus a one-time $600 user fee. The Oconee Joint Regional Sewer Authority impact fee applies in addition.
- City Impact Fee (City of Seneca, Office)$0.00The City of Seneca does not charge a development impact fee; new connections pay the city's water and sewer tap fees.
- County Impact Fee (Oconee County, Office)$0.00Oconee County does not charge a development impact fee.
Where in Oconee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seneca Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Seneca Impact Fee FAQs
What are the total impact fees for a single-family home in Seneca, South Carolina?
A new single-family home in Seneca pays $6,750.00 per unit in combined impact fees (rates sourced November 14, 2026).
How much are commercial impact fees in Seneca?
Commercial development in Seneca pays no per-square-foot impact fees, but owes $7,150.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Seneca charge its own impact fees?
Yes. Seneca levies its own municipal impact or utility fees. Oconee County does not currently add county-level impact fees inside Seneca. The schedule on this page shows every fee that applies to development in Seneca.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Oconee County impact fees page.