Rock Hill Impact Fees by Project Type
Rock Hill: Single-Family Impact Fees
A new single-family home in Rock Hill pays at least $3,924.00 per unit in impact fees (rates sourced November 15, 2026). Every line item is levied at the municipal or utility level.
Water Development Impact Fee (City of Rock Hill) — 1.0 ERU × $1,070/ERU, Fire Protection Impact Fee (City of Rock Hill), and Wastewater Development Impact Fee (City of Rock Hill) — 1.0 ERU × $2,110/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap and Meter Fee (City of Rock Hill) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Rock Hill Impact Fee Schedule
- Water Development Impact Fee (City of Rock Hill) — 1.0 ERU × $1,070/ERU$1,070.00Requires confirmationCity of Rock HillCity of Rock Hill water impact fee per ERU; a standard home is 1.0 ERU. Under Ordinance 2026-49 the fee rises to $1,300 per ERU on January 1, 2027.
- Water Tap and Meter Fee (City of Rock Hill)Requires confirmationCity of Rock HillCity of Rock Hill charges a tap fee on a new water connection to cover tapping the main and the new meter, in addition to the water impact fee. The amount is set in the city fee schedule (Code Appendix A).
- Wastewater Development Impact Fee (City of Rock Hill) — 1.0 ERU × $2,110/ERU$2,110.00Requires confirmationCity of Rock HillCity of Rock Hill wastewater impact fee per ERU; a standard home is 1.0 ERU. Under Ordinance 2026-49 the fee rises to $5,760 per ERU on January 1, 2027.
- Fire Protection Impact Fee (City of Rock Hill)$744.00Requires confirmationCity of Rock HillCity of Rock Hill fire protection impact fee per single-family home. On January 1, 2027 it rises to $1,897 (Ordinance 2026-48), and a new police impact fee of $631 per home begins (Ordinance 2026-47).
- County Impact Fee (York County — Rock Hill)$0.00York County
Where in York County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Rock Hill: Multifamily Impact Fees
A new multifamily unit in Rock Hill pays at least $3,726.00 per unit in impact fees (rates sourced November 15, 2026). Every line item is levied at the municipal or utility level.
Water Development Impact Fee (City of Rock Hill, MF), Wastewater Development Impact Fee (City of Rock Hill, MF), and Fire Protection Impact Fee (City of Rock Hill, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap and Meter Fee (City of Rock Hill, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Rock Hill Impact Fee Schedule
- Water Development Impact Fee (City of Rock Hill, MF)$1,070.00Requires confirmationCity of Rock HillCity of Rock Hill water impact fee per 3/4-inch meter connection (1.0 ERU); a building on one connection pays once, and the city may allow a 3-inch or larger master meter instead of multiple 3/4-inch fees. Rises to $1,300 per ERU on January 1, 2027.
- Water Tap and Meter Fee (City of Rock Hill, MF)Requires confirmationCity of Rock HillCity of Rock Hill charges a tap fee on a new water connection to cover tapping the main and the new meter, in addition to the water impact fee; a building on one connection pays once. The amount is set in the city fee schedule (Code Appendix A).
- Wastewater Development Impact Fee (City of Rock Hill, MF)$2,110.00Requires confirmationCity of Rock HillCity of Rock Hill wastewater impact fee per 3/4-inch meter connection (1.0 ERU); a building on one connection pays once, and the city may allow a master meter instead. Rises to $5,760 per ERU on January 1, 2027.
- Fire Protection Impact Fee (City of Rock Hill, MF)$546.00Requires confirmationCity of Rock HillCity of Rock Hill fire protection impact fee per multifamily unit. On January 1, 2027 it rises to $897 (Ordinance 2026-48), and a new police impact fee of $298 per unit begins (Ordinance 2026-47).
- $0.00
Where in York County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Rock Hill: Commercial Impact Fees
Commercial development in Rock Hill pays $0.62 per square foot in impact fees, plus $7,950.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).
For a 50,000 sq ft building, that comes to at least $38,750.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Fire Protection Impact Fee (City of Rock Hill, Commercial), Wastewater Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU), and Water Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap and Meter Fee (City of Rock Hill) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Rock Hill Impact Fee Schedule
- Water Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU)$2,675.00 one-timeRequires confirmationCity of Rock HillCity of Rock Hill water impact fee by meter size; a 1-inch meter is 2.5 equivalent residential units. Under Ordinance 2026-49 the fee rises to $1,300 per unit on January 1, 2027 ($3,250 for a 1-inch meter). A separate tap and meter fee applies.
- Water Tap and Meter Fee (City of Rock Hill)Requires confirmationCity of Rock HillCity of Rock Hill charges a tap fee on a new water connection to cover tapping the main and the new meter, in addition to the water impact fee. The amount is set in the city fee schedule (Code Appendix A).
- Wastewater Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU)$5,275.00 one-timeRequires confirmationCity of Rock HillCity of Rock Hill wastewater impact fee by water meter size; a 1-inch meter is 2.5 equivalent residential units. Under Ordinance 2026-49 the fee rises to $5,760 per unit on January 1, 2027 ($14,400 for a 1-inch meter).
- Fire Protection Impact Fee (City of Rock Hill, Commercial)$0.62/sq ftRequires confirmationCity of Rock HillCity of Rock Hill fire protection impact fee per 1,000 square feet of commercial or institutional finished area, with a minimum fee based on 1,000 square feet. On January 1, 2027 it rises to $1,181 per 1,000 square feet (Ordinance 2026-48), and a new police impact fee of $842 per 1,000 square feet begins (Ordinance 2026-47).
- $0.00
Where in York County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Rock Hill: Industrial Impact Fees
Industrial development in Rock Hill pays $0.37 per square foot in impact fees, plus $7,950.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).
For a 50,000 sq ft building, that comes to at least $26,400.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Fire Protection Impact Fee (City of Rock Hill, Industrial), Wastewater Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU), and Water Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap and Meter Fee (City of Rock Hill) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Rock Hill Impact Fee Schedule
- Water Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU)$2,675.00 one-timeRequires confirmationCity of Rock HillCity of Rock Hill water impact fee by meter size; a 1-inch meter is 2.5 equivalent residential units. Under Ordinance 2026-49 the fee rises to $1,300 per unit on January 1, 2027 ($3,250 for a 1-inch meter). A separate tap and meter fee applies.
- Water Tap and Meter Fee (City of Rock Hill)Requires confirmationCity of Rock HillCity of Rock Hill charges a tap fee on a new water connection to cover tapping the main and the new meter, in addition to the water impact fee. The amount is set in the city fee schedule (Code Appendix A).
- Wastewater Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU)$5,275.00 one-timeRequires confirmationCity of Rock HillCity of Rock Hill wastewater impact fee by water meter size; a 1-inch meter is 2.5 equivalent residential units. Under Ordinance 2026-49 the fee rises to $5,760 per unit on January 1, 2027 ($14,400 for a 1-inch meter).
- Fire Protection Impact Fee (City of Rock Hill, Industrial)$0.37/sq ftRequires confirmationCity of Rock HillCity of Rock Hill fire protection impact fee per 1,000 square feet of industrial or manufacturing finished area, with a minimum fee based on 1,000 square feet. On January 1, 2027 it rises to $591 per 1,000 square feet, and a new police impact fee of $421 per 1,000 square feet begins.
- $0.00
Where in York County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Rock Hill: Office Impact Fees
Office development in Rock Hill pays $0.62 per square foot in impact fees, plus $7,950.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).
For a 25,000 sq ft building, that comes to at least $23,350.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Fire Protection Impact Fee (City of Rock Hill, Office), Wastewater Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU), and Water Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap and Meter Fee (City of Rock Hill) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Rock Hill Impact Fee Schedule
- Water Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU)$2,675.00 one-timeRequires confirmationCity of Rock HillCity of Rock Hill water impact fee by meter size; a 1-inch meter is 2.5 equivalent residential units. Under Ordinance 2026-49 the fee rises to $1,300 per unit on January 1, 2027 ($3,250 for a 1-inch meter). A separate tap and meter fee applies.
- Water Tap and Meter Fee (City of Rock Hill)Requires confirmationCity of Rock HillCity of Rock Hill charges a tap fee on a new water connection to cover tapping the main and the new meter, in addition to the water impact fee. The amount is set in the city fee schedule (Code Appendix A).
- Wastewater Development Impact Fee (City of Rock Hill) — 1" meter (2.5 ERU)$5,275.00 one-timeRequires confirmationCity of Rock HillCity of Rock Hill wastewater impact fee by water meter size; a 1-inch meter is 2.5 equivalent residential units. Under Ordinance 2026-49 the fee rises to $5,760 per unit on January 1, 2027 ($14,400 for a 1-inch meter).
- Fire Protection Impact Fee (City of Rock Hill, Office)$0.62/sq ftRequires confirmationCity of Rock HillCity of Rock Hill fire protection impact fee per 1,000 square feet of office finished area (offices are charged at the commercial and institutional rate), with a minimum fee based on 1,000 square feet. On January 1, 2027 it rises to $1,181 per 1,000 square feet, and a new police impact fee of $842 per 1,000 square feet begins.
- $0.00
Where in York County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Rock Hill Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Rock Hill Impact Fee FAQs
What are the total impact fees for a single-family home in Rock Hill, South Carolina?
A new single-family home in Rock Hill pays at least $3,924.00 per unit in combined impact fees (rates sourced November 15, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Rock Hill?
Commercial development in Rock Hill pays $0.62 per square foot in impact fees, plus $7,950.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $38,750.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Rock Hill charge its own impact fees?
Yes. Rock Hill levies its own municipal impact or utility fees. York County does not currently add county-level impact fees inside Rock Hill. The schedule on this page shows every fee that applies to development in Rock Hill.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the York County impact fees page.