Belton Impact Fees by Project Type
Belton: Single-Family Impact Fees
A new single-family home in Belton pays $2,950.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Parkland Dedication Fee-in-Lieu (City of Belton) ($350.00) and Sewer Tap Inspection Fee (City of Belton) ($300.00).
Water Meter Set Fee (City of Belton) and Water Tap Fee (City of Belton) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Belton Impact Fee Schedule
- Water Meter Set Fee (City of Belton)$2,000.00Requires confirmationCity of BeltonNo water impact fee. One-time new meter set base fee of $2,000 plus the cost of the meter for meters up to 2 inches, effective October 1, 2026. Meters are purchased from the city; meters 3 inches and larger are installed by the customer.
- Water Tap Fee (City of Belton)$300.00Requires confirmationCity of BeltonContractor-installed water taps carry a $300 city fee per tap, effective October 1, 2026, in addition to the meter set fee. Taps installed by the city are billed at materials plus 10% plus equipment and labor.
- Sewer Tap Inspection Fee (City of Belton)$300.00City of BeltonNo wastewater impact fee. Contractor-installed sewer taps carry a $300 city inspection fee, effective October 1, 2026; taps installed by the city are billed at materials plus 10% plus equipment and labor. Outside the city limits sewer tap fees are 1.25 times the in-city amount.
- Parkland Dedication Fee-in-Lieu (City of Belton)$350.00City of BeltonPark land dedication fee in lieu of $350 per dwelling unit, effective October 1, 2026.
- County Impact Fee (Bell County)$0.00Bell CountyBell County does not levy development impact fees; Texas counties are not authorized to charge them.
Where in Bell County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belton: Multifamily Impact Fees
A new multifamily unit in Belton pays $2,950.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Parkland Dedication Fee-in-Lieu (City of Belton, MF) ($350.00) and Sewer Tap Inspection Fee (City of Belton, MF) ($300.00).
Water Meter Set Fee (City of Belton, MF) and Water Tap Fee (City of Belton, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Belton Impact Fee Schedule
- Water Meter Set Fee (City of Belton, MF)$2,000.00Requires confirmationCity of BeltonNo water impact fee. One-time new meter set base fee of $2,000 plus the cost of the meter for meters up to 2 inches, effective October 1, 2026. The fee is charged per meter: a building served by one meter pays it once.
- Water Tap Fee (City of Belton, MF)$300.00Requires confirmationCity of BeltonContractor-installed water taps carry a $300 city fee per tap, effective October 1, 2026, in addition to the meter set fee; a building on one tap pays it once. Taps installed by the city are billed at materials plus 10% plus equipment and labor.
- Sewer Tap Inspection Fee (City of Belton, MF)$300.00City of BeltonNo wastewater impact fee. Contractor-installed sewer taps carry a $300 city inspection fee per tap, effective October 1, 2026; a building on one tap pays it once. Taps installed by the city are billed at materials plus 10% plus equipment and labor.
- Parkland Dedication Fee-in-Lieu (City of Belton, MF)$350.00City of BeltonPark land dedication fee in lieu of $350 per dwelling unit, effective October 1, 2026.
- County Impact Fee (Bell County, MF)$0.00Bell CountyBell County does not levy development impact fees; Texas counties are not authorized to charge them.
Where in Bell County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belton: Commercial Impact Fees
Commercial development in Belton pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Set Fee (City of Belton) ($2,000.00 one-time) and Sewer Tap Inspection Fee (City of Belton) ($300.00 one-time).
Water Tap Fee (City of Belton, Contractor-Installed) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Belton Impact Fee Schedule
- Water Meter Set Fee (City of Belton)$2,000.00 one-timeCity of BeltonNo water impact fee. One-time new meter set base fee of $2,000 plus the cost of the meter for meters up to 2 inches, effective October 1, 2026 (previously $1,000); meters must be purchased from the city, and meters 3 inches and larger are installed by the customer. Three Creeks MUD and River Farms MUD areas have charges set by development agreement.
- Water Tap Fee (City of Belton, Contractor-Installed)$300.00 one-timeRequires confirmationCity of BeltonContractor-installed water taps carry a $300 city fee, effective October 1, 2026. Taps installed by the city are billed at materials plus 10% plus equipment and labor.
- Sewer Tap Inspection Fee (City of Belton)$300.00 one-timeCity of BeltonNo wastewater impact fee. Contractor-installed sewer taps carry a $300 city inspection fee, effective October 1, 2026; taps installed by the city are billed at materials plus 10% plus equipment and labor. Outside the city limits the sewer tap fees are 1.25 times the in-city amount.
- City Impact Fee (City of Belton, Commercial)$0.00City of BeltonBelton does not charge development impact fees on commercial construction. The city's park land dedication fee applies per dwelling unit only.
- County Impact Fee (Bell County, Commercial)$0.00Bell CountyBell County does not levy development impact fees; Texas counties are not authorized to charge them.
Where in Bell County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belton: Industrial Impact Fees
Industrial development in Belton pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Set Fee (City of Belton) ($2,000.00 one-time) and Sewer Tap Inspection Fee (City of Belton) ($300.00 one-time).
Water Tap Fee (City of Belton, Contractor-Installed) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Belton Impact Fee Schedule
- Water Meter Set Fee (City of Belton)$2,000.00 one-timeCity of BeltonNo water impact fee. One-time new meter set base fee of $2,000 plus the cost of the meter for meters up to 2 inches, effective October 1, 2026 (previously $1,000); meters must be purchased from the city, and meters 3 inches and larger are installed by the customer. Three Creeks MUD and River Farms MUD areas have charges set by development agreement.
- Water Tap Fee (City of Belton, Contractor-Installed)$300.00 one-timeRequires confirmationCity of BeltonContractor-installed water taps carry a $300 city fee, effective October 1, 2026. Taps installed by the city are billed at materials plus 10% plus equipment and labor.
- Sewer Tap Inspection Fee (City of Belton)$300.00 one-timeCity of BeltonNo wastewater impact fee. Contractor-installed sewer taps carry a $300 city inspection fee, effective October 1, 2026; taps installed by the city are billed at materials plus 10% plus equipment and labor. Outside the city limits the sewer tap fees are 1.25 times the in-city amount.
- City Impact Fee (City of Belton, Industrial)$0.00City of BeltonBelton does not charge development impact fees on industrial construction. The city's park land dedication fee applies per dwelling unit only.
- County Impact Fee (Bell County, Industrial)$0.00Bell CountyBell County does not levy development impact fees; Texas counties are not authorized to charge them.
Where in Bell County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belton: Office Impact Fees
Office development in Belton pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 25,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Set Fee (City of Belton) ($2,000.00 one-time) and Sewer Tap Inspection Fee (City of Belton) ($300.00 one-time).
Water Tap Fee (City of Belton, Contractor-Installed) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Belton Impact Fee Schedule
- Water Meter Set Fee (City of Belton)$2,000.00 one-timeCity of BeltonNo water impact fee. One-time new meter set base fee of $2,000 plus the cost of the meter for meters up to 2 inches, effective October 1, 2026 (previously $1,000); meters must be purchased from the city, and meters 3 inches and larger are installed by the customer. Three Creeks MUD and River Farms MUD areas have charges set by development agreement.
- Water Tap Fee (City of Belton, Contractor-Installed)$300.00 one-timeRequires confirmationCity of BeltonContractor-installed water taps carry a $300 city fee, effective October 1, 2026. Taps installed by the city are billed at materials plus 10% plus equipment and labor.
- Sewer Tap Inspection Fee (City of Belton)$300.00 one-timeCity of BeltonNo wastewater impact fee. Contractor-installed sewer taps carry a $300 city inspection fee, effective October 1, 2026; taps installed by the city are billed at materials plus 10% plus equipment and labor. Outside the city limits the sewer tap fees are 1.25 times the in-city amount.
- City Impact Fee (City of Belton, Office)$0.00City of BeltonBelton does not charge development impact fees on office construction. The city's park land dedication fee applies per dwelling unit only.
- County Impact Fee (Bell County, Office)$0.00Bell CountyBell County does not levy development impact fees; Texas counties are not authorized to charge them.
Where in Bell County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belton Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Belton Impact Fee FAQs
What are the total impact fees for a single-family home in Belton, Texas?
A new single-family home in Belton pays $2,950.00 per unit in combined impact fees (rates sourced November 16, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Belton?
Commercial development in Belton pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Belton charge its own impact fees?
Yes. Belton levies its own municipal impact or utility fees. Bell County does not currently add county-level impact fees inside Belton. The schedule on this page shows every fee that applies to development in Belton.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Bell County impact fees page.