Eagar Impact Fees by Project Type
Eagar: Single-Family Impact Fees
A new single-family home in Eagar pays $2,175.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection/Capacity Fee (Town of Eagar) ($1,200.00) and Water Meter Connection Fee (Town of Eagar) ($975.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Eagar Impact Fee Schedule
- Water Meter Connection Fee (Town of Eagar)$975.003/4"Town of EagarWater meter connection fee by meter size under the Town of Eagar Fee Schedule effective April 5, 2024: 3/4 inch $975, 1 inch $1,125, 1 1/2 inch $1,400, 2 inch at actual cost. A pressure reducer adds $150 to $250 by size, a road crossing adds $1,250 where required, and rates for county residents outside town limits are doubled.
- Sewer Connection/Capacity Fee (Town of Eagar)$1,200.00Town of EagarSewer connection fee of $1,200 per connection under the Town of Eagar Fee Schedule effective April 5, 2024. A road crossing adds $1,250 where required, and rates for county residents outside town limits are doubled.
- City Development Impact Fees (Town of Eagar)$0.00Town of EagarThe Town of Eagar ended development impact fees for all new construction by Resolution 2011-28, and its current fee schedule (effective April 5, 2024) contains none.
- County Development Impact Fees (Apache County)$0.00Apache CountyApache County levies no development impact fees. Its Community Development fee schedule (approved December 1, 2009, amended August 7, 2017) lists planning, zoning and subdivision application fees only.
Where in Apache County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagar: Multifamily Impact Fees
A new multifamily unit in Eagar pays $2,175.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection/Capacity Fee (Town of Eagar, MF) ($1,200.00) and Water Meter Connection Fee (Town of Eagar, MF) ($975.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Eagar Impact Fee Schedule
- Water Meter Connection Fee (Town of Eagar, MF)$975.003/4"Town of EagarWater meter connection fee by meter size under the Town of Eagar Fee Schedule effective April 5, 2024: 3/4 inch $975, 1 inch $1,125, 1 1/2 inch $1,400, 2 inch at actual cost. Charged per meter: a building served by one meter pays once, and larger buildings may need a larger meter. A pressure reducer adds $150 to $250 by size, a road crossing adds $1,250 where required, and rates for county residents outside town limits are doubled.
- Sewer Connection/Capacity Fee (Town of Eagar, MF)$1,200.00Town of EagarSewer connection fee of $1,200 per connection under the Town of Eagar Fee Schedule effective April 5, 2024. Charged per connection: a building on one connection pays once. A road crossing adds $1,250 where required, and rates for county residents outside town limits are doubled.
- City Development Impact Fees (Town of Eagar, MF)$0.00Town of EagarThe Town of Eagar ended development impact fees for all new construction by Resolution 2011-28, and its current fee schedule (effective April 5, 2024) contains none.
- County Development Impact Fees (Apache County, MF)$0.00Apache CountyApache County levies no development impact fees. Its Community Development fee schedule (approved December 1, 2009, amended August 7, 2017) lists planning, zoning and subdivision application fees only.
Where in Apache County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagar: Commercial Impact Fees
Commercial development in Eagar pays no per-square-foot impact fees, but owes $2,325.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 50,000 sq ft building, that comes to about $2,325.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Eagar) ($1,200.00 one-time) and Water Meter Connection Fee (Town of Eagar) ($1,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Eagar Impact Fee Schedule
- Water Meter Connection Fee (Town of Eagar)$1,125.00 one-time1"Town of EagarWater meter connection fee by meter size under the Town of Eagar Fee Schedule effective April 5, 2024, one schedule for all customer classes: 3/4 inch $975, 1 inch $1,125, 1 1/2 inch $1,400, 2 inch at actual cost. A pressure reducer adds $150 to $250 by size, a road crossing adds $1,250 where required, and rates for county customers outside town limits are doubled. The town code lets a business new to Eagar apply for a waiver of water and sewer connection fees for a structure built to house it.
- Sewer Connection Fee (Town of Eagar)$1,200.00 one-timeTown of EagarSewer connection fee of $1,200 per connection under the Town of Eagar Fee Schedule effective April 5, 2024, one rate for all customer classes. A road crossing adds $1,250 where required, and rates for county customers outside town limits are doubled. The town code lets a business new to Eagar apply for a waiver of water and sewer connection fees for a structure built to house it.
- City Development Impact Fee (Town of Eagar, Commercial)$0.00Town of EagarThe Town of Eagar ended development impact fees for all new construction by Resolution 2011-28, and its current fee schedule (effective April 5, 2024) contains none.
- County Development Impact Fee (Apache County, Commercial)$0.00Apache CountyApache County levies no development impact fees. Its Community Development fee schedule (approved December 1, 2009, amended August 7, 2017) lists planning, zoning and subdivision application fees only.
Where in Apache County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagar: Industrial Impact Fees
Industrial development in Eagar pays no per-square-foot impact fees, but owes $2,325.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 50,000 sq ft building, that comes to about $2,325.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Eagar) ($1,200.00 one-time) and Water Meter Connection Fee (Town of Eagar) ($1,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Eagar Impact Fee Schedule
- Water Meter Connection Fee (Town of Eagar)$1,125.00 one-time1"Town of EagarWater meter connection fee by meter size under the Town of Eagar Fee Schedule effective April 5, 2024, one schedule for all customer classes: 3/4 inch $975, 1 inch $1,125, 1 1/2 inch $1,400, 2 inch at actual cost. A pressure reducer adds $150 to $250 by size, a road crossing adds $1,250 where required, and rates for county customers outside town limits are doubled. The town code lets a business new to Eagar apply for a waiver of water and sewer connection fees for a structure built to house it.
- Sewer Connection Fee (Town of Eagar)$1,200.00 one-timeTown of EagarSewer connection fee of $1,200 per connection under the Town of Eagar Fee Schedule effective April 5, 2024, one rate for all customer classes. A road crossing adds $1,250 where required, and rates for county customers outside town limits are doubled. The town code lets a business new to Eagar apply for a waiver of water and sewer connection fees for a structure built to house it.
- City Development Impact Fee (Town of Eagar, Industrial)$0.00Town of EagarThe Town of Eagar ended development impact fees for all new construction by Resolution 2011-28, and its current fee schedule (effective April 5, 2024) contains none.
- County Development Impact Fee (Apache County, Industrial)$0.00Apache CountyApache County levies no development impact fees. Its Community Development fee schedule (approved December 1, 2009, amended August 7, 2017) lists planning, zoning and subdivision application fees only.
Where in Apache County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagar: Office Impact Fees
Office development in Eagar pays no per-square-foot impact fees, but owes $2,325.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 25,000 sq ft building, that comes to about $2,325.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Eagar) ($1,200.00 one-time) and Water Meter Connection Fee (Town of Eagar) ($1,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Eagar Impact Fee Schedule
- Water Meter Connection Fee (Town of Eagar)$1,125.00 one-time1"Town of EagarWater meter connection fee by meter size under the Town of Eagar Fee Schedule effective April 5, 2024, one schedule for all customer classes: 3/4 inch $975, 1 inch $1,125, 1 1/2 inch $1,400, 2 inch at actual cost. A pressure reducer adds $150 to $250 by size, a road crossing adds $1,250 where required, and rates for county customers outside town limits are doubled. The town code lets a business new to Eagar apply for a waiver of water and sewer connection fees for a structure built to house it.
- Sewer Connection Fee (Town of Eagar)$1,200.00 one-timeTown of EagarSewer connection fee of $1,200 per connection under the Town of Eagar Fee Schedule effective April 5, 2024, one rate for all customer classes. A road crossing adds $1,250 where required, and rates for county customers outside town limits are doubled. The town code lets a business new to Eagar apply for a waiver of water and sewer connection fees for a structure built to house it.
- City Development Impact Fee (Town of Eagar, Office)$0.00Town of EagarThe Town of Eagar ended development impact fees for all new construction by Resolution 2011-28, and its current fee schedule (effective April 5, 2024) contains none.
- County Development Impact Fee (Apache County, Office)$0.00Apache CountyApache County levies no development impact fees. Its Community Development fee schedule (approved December 1, 2009, amended August 7, 2017) lists planning, zoning and subdivision application fees only.
Where in Apache County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagar Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Eagar Impact Fee FAQs
What are the total impact fees for a single-family home in Eagar, Arizona?
A new single-family home in Eagar pays $2,175.00 per unit in combined impact fees (rates sourced October 16, 2026).
How much are commercial impact fees in Eagar?
Commercial development in Eagar pays no per-square-foot impact fees, but owes $2,325.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Eagar charge its own impact fees?
Yes. Eagar levies its own municipal impact or utility fees. Apache County does not currently add county-level impact fees inside Eagar. The schedule on this page shows every fee that applies to development in Eagar.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Apache County impact fees page.