St. Johns applies its own fee schedule. Apache County does not currently add county-level impact fees inside city limits. A new single-family home pays $1,755.00 per unit (rates sourced ). The full breakdown is below.

St. Johns Impact Fees by Project Type

St. Johns: Single-Family Impact Fees

A new single-family home in St. Johns pays $1,755.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter Installation Fee (City of St. Johns) ($1,155.00) and Sewer Connection Fee (City of St. Johns) ($600.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full St. Johns Impact Fee Schedule
Water$1,155.00
  • Water Meter Installation Fee (City of St. Johns)
    3/4"
    City of St. Johns
    Water meter installation charge by meter size under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, covering the meter, box, lid, riser, pipe, tapping valve and saddle, labor and asphalt: 3/4 inch $1,155, 1 inch $1,641. Meters from 2 to 6 inches cost $1,500 plus installation at the cost of meter and materials plus 20%. New customers also pay a $30 connection fee and a $120 deposit.
    $1,155.00
Sewer$600.00
  • Sewer Connection Fee (City of St. Johns)
    City of St. Johns
    Residential manhole connect fee of $600 per connection under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, plus the actual installation cost. Sewer line extensions run $6 per foot for 4 inch pipe and $8 per foot for 6 inch pipe.
    $600.00
City$0.00
County$0.00
  • County Development Impact Fees (Apache County)
    Apache County
    Apache County levies no development impact fees. Its Community Development fee schedule (approved December 1, 2009, amended August 7, 2017) lists planning, zoning and subdivision application fees only.
    $0.00
Total (St. Johns): $1,755.00
Sources last checked Official fee schedules:City of St. Johns Apache County

Where in Apache County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

St. Johns: Multifamily Impact Fees

A new multifamily unit in St. Johns pays $1,755.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter Installation Fee (City of St. Johns, MF) ($1,155.00) and Sewer Connection Fee (City of St. Johns, MF) ($600.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full St. Johns Impact Fee Schedule
Water$1,155.00
  • Water Meter Installation Fee (City of St. Johns, MF)
    3/4"
    City of St. Johns
    Water meter installation charge by meter size under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023: 3/4 inch $1,155, 1 inch $1,641; meters from 2 to 6 inches cost $1,500 plus installation at the cost of meter and materials plus 20%. Charged per meter: a building served by one meter pays once, and larger buildings may need a larger meter. New customers also pay a $30 connection fee and a $120 deposit.
    $1,155.00
Sewer$600.00
  • Sewer Connection Fee (City of St. Johns, MF)
    City of St. Johns
    Residential manhole connect fee of $600 per connection under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, plus the actual installation cost. Charged per connection: a building on one connection pays once.
    $600.00
City$0.00
County$0.00
  • County Development Impact Fees (Apache County, MF)
    Apache County
    Apache County levies no development impact fees. Its Community Development fee schedule (approved December 1, 2009, amended August 7, 2017) lists planning, zoning and subdivision application fees only.
    $0.00
Total (St. Johns): $1,755.00
Sources last checked Official fee schedules:City of St. Johns Apache County

Where in Apache County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

St. Johns: Commercial Impact Fees

Commercial development in St. Johns pays no per-square-foot impact fees, but owes $2,291.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to about $2,291.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Installation Fee (City of St. Johns) ($1,641.00 one-time) and Sewer Connection Fee (City of St. Johns) ($650.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full St. Johns Impact Fee Schedule
Water$1,641.00 one-time
  • Water Meter Installation Fee (City of St. Johns)
    1"
    City of St. Johns
    Water meter installation charge by meter size under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, one schedule for all customer classes, covering the meter, box, lid, riser, pipe, tapping valve and saddle, labor and asphalt: 3/4 inch $1,155, 1 inch $1,641. Meters from 2 to 6 inches cost $1,500 plus installation at the cost of meter and materials plus 20%. New customers also pay a $30 connection fee and a $120 deposit.
    $1,641.00 one-time
Sewer$650.00 one-time
  • Sewer Connection Fee (City of St. Johns)
    City of St. Johns
    Commercial manhole connect fee of $650 per connection under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, plus the actual installation cost. Sewer line extensions run $6 per foot for 4 inch pipe and $8 per foot for 6 inch pipe.
    $650.00 one-time
City$0.00
County$0.00
Total (St. Johns): $2,291.00 one-time (≈ $2,291.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of St. Johns Apache County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Apache County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

St. Johns: Industrial Impact Fees

Industrial development in St. Johns pays no per-square-foot impact fees, but owes $2,291.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to about $2,291.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Installation Fee (City of St. Johns) ($1,641.00 one-time) and Sewer Connection Fee (City of St. Johns) ($650.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full St. Johns Impact Fee Schedule
Water$1,641.00 one-time
  • Water Meter Installation Fee (City of St. Johns)
    1"
    City of St. Johns
    Water meter installation charge by meter size under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, one schedule for all customer classes, covering the meter, box, lid, riser, pipe, tapping valve and saddle, labor and asphalt: 3/4 inch $1,155, 1 inch $1,641. Meters from 2 to 6 inches cost $1,500 plus installation at the cost of meter and materials plus 20%. New customers also pay a $30 connection fee and a $120 deposit.
    $1,641.00 one-time
Sewer$650.00 one-time
  • Sewer Connection Fee (City of St. Johns)
    City of St. Johns
    Commercial manhole connect fee of $650 per connection under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, plus the actual installation cost. Sewer line extensions run $6 per foot for 4 inch pipe and $8 per foot for 6 inch pipe.
    $650.00 one-time
City$0.00
County$0.00
Total (St. Johns): $2,291.00 one-time (≈ $2,291.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of St. Johns Apache County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Apache County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

St. Johns: Office Impact Fees

Office development in St. Johns pays no per-square-foot impact fees, but owes $2,291.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 25,000 sq ft building, that comes to about $2,291.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Installation Fee (City of St. Johns) ($1,641.00 one-time) and Sewer Connection Fee (City of St. Johns) ($650.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full St. Johns Impact Fee Schedule
Water$1,641.00 one-time
  • Water Meter Installation Fee (City of St. Johns)
    1"
    City of St. Johns
    Water meter installation charge by meter size under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, one schedule for all customer classes, covering the meter, box, lid, riser, pipe, tapping valve and saddle, labor and asphalt: 3/4 inch $1,155, 1 inch $1,641. Meters from 2 to 6 inches cost $1,500 plus installation at the cost of meter and materials plus 20%. New customers also pay a $30 connection fee and a $120 deposit.
    $1,641.00 one-time
Sewer$650.00 one-time
  • Sewer Connection Fee (City of St. Johns)
    City of St. Johns
    Commercial manhole connect fee of $650 per connection under the City of St. Johns Rates, Charges and Fees Schedule as amended October 11, 2023, plus the actual installation cost. Sewer line extensions run $6 per foot for 4 inch pipe and $8 per foot for 6 inch pipe.
    $650.00 one-time
City$0.00
County$0.00
  • County Development Impact Fee (Apache County, Office)
    Apache County
    Apache County levies no development impact fees. Its Community Development fee schedule (approved December 1, 2009, amended August 7, 2017) lists planning, zoning and subdivision application fees only.
    $0.00
Total (St. Johns): $2,291.00 one-time (≈ $2,291.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of St. Johns Apache County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Apache County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

St. Johns Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

St. Johns Impact Fee FAQs

What are the total impact fees for a single-family home in St. Johns, Arizona?

A new single-family home in St. Johns pays $1,755.00 per unit in combined impact fees (rates sourced October 16, 2026).

How much are commercial impact fees in St. Johns?

Commercial development in St. Johns pays no per-square-foot impact fees, but owes $2,291.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does St. Johns charge its own impact fees?

Yes. St. Johns levies its own municipal impact or utility fees. Apache County does not currently add county-level impact fees inside St. Johns. The schedule on this page shows every fee that applies to development in St. Johns.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Apache County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000