Douglas, Arizona Impact Fees

Douglas applies its own fee schedule. Cochise County does not currently add county-level impact fees inside city limits. A new single-family home pays $4,443.00 per unit (rates sourced ). The full breakdown is below.

Douglas Impact Fees by Project Type

Douglas: Single-Family Impact Fees

A new single-family home in Douglas pays $4,443.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (City of Douglas) — 3/4" meter ($2,100.00), Water Impact Fee (City of Douglas) — 3/4" meter ($1,400.00) and Water Meter Installation (City of Douglas) — 3/4" meter ($943.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Douglas Impact Fee Schedule
Water$2,343.00
  • Water Impact Fee (City of Douglas) — 3/4" meter
    City of Douglas
    Douglas charges a one-time water impact fee by meter size; a standard 3/4 inch residential meter pays $1,400, and larger meters pay by meter ratio (1 inch $3,500 up to 6 inch $70,000). The water meter installation charge is billed separately.
    $1,400.00
  • Water Meter Installation (City of Douglas) — 3/4" meter
    City of Douglas
    Douglas charges a one-time water meter installation charge by meter size; a 3/4 inch residential meter is $943, in addition to the water and sewer impact fees.
    $943.00
Sewer$2,100.00
  • Sewer Impact Fee (City of Douglas) — 3/4" meter
    City of Douglas
    Douglas charges a one-time sewer (wastewater) impact fee by water meter size; a standard 3/4 inch residential meter pays $2,100, and larger meters pay by meter ratio (1 inch $5,250 up to 6 inch $105,000).
    $2,100.00
City$0.00
  • Development Impact Fee (City of Douglas)
    City of Douglas
    Douglas's only development impact fees are its water and sewer impact fees; it charges no transportation, parks, public safety or other development impact fee.
    $0.00
County$0.00
Total (Douglas): $4,443.00
Sources last checked Official fee schedules:City of Douglas Cochise County

Where in Cochise County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Douglas: Multifamily Impact Fees

A new multifamily unit in Douglas pays $4,443.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (City of Douglas, MF) — 3/4" meter ($2,100.00), Water Impact Fee (City of Douglas, MF) — 3/4" meter ($1,400.00) and Water Meter Installation (City of Douglas, MF) — 3/4" meter ($943.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Douglas Impact Fee Schedule
Water$2,343.00
  • Water Impact Fee (City of Douglas, MF) — 3/4" meter
    City of Douglas
    Douglas charges a one-time water impact fee per connection by meter size: $1,400 for a 3/4 inch meter, so a unit with its own meter pays $1,400. A building served by one larger meter pays once at that meter's rate (1 inch $3,500 up to 6 inch $70,000).
    $1,400.00
  • Water Meter Installation (City of Douglas, MF) — 3/4" meter
    City of Douglas
    Douglas charges a one-time water meter installation charge per meter by size: $943 for a 3/4 inch meter. A building served by one larger meter pays once for that meter size.
    $943.00
Sewer$2,100.00
  • Sewer Impact Fee (City of Douglas, MF) — 3/4" meter
    City of Douglas
    Douglas charges a one-time sewer impact fee per connection by water meter size: $2,100 for a 3/4 inch meter, so a unit with its own meter pays $2,100. A building served by one larger meter pays once at that meter's rate (1 inch $5,250 up to 6 inch $105,000).
    $2,100.00
City$0.00
  • Development Impact Fee (City of Douglas, MF)
    City of Douglas
    Douglas's only development impact fees are its water and sewer impact fees; it charges no transportation, parks, public safety or other development impact fee.
    $0.00
County$0.00
Total (Douglas): $4,443.00
Sources last checked Official fee schedules:City of Douglas Cochise County

Where in Cochise County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Douglas: Commercial Impact Fees

Commercial development in Douglas pays no per-square-foot impact fees, but owes $9,979.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $9,979.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Douglas) — 1" meter ($5,250.00 one-time), Water Impact Fee (City of Douglas) — 1" meter ($3,500.00 one-time) and Water Meter Installation (City of Douglas) — 1" meter ($1,229.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Douglas Impact Fee Schedule
Water$4,729.00 one-time
  • Water Impact Fee (City of Douglas) — 1" meter
    City of Douglas
    One-time water impact fee due at building permit, set by water meter size from $1,400 (3/4 inch) to $70,000 (6 inch); shown for a 1 inch meter. Charged in addition to the sewer impact fee and the water meter installation charge.
    $3,500.00 one-time
  • Water Meter Installation (City of Douglas) — 1" meter
    City of Douglas
    One-time charge for the City to install a new water meter, by meter size from $943 (3/4 inch or smaller) to $5,122 (6 inch); shown for a 1 inch meter. The cost of the meter itself is billed in addition.
    $1,229.00 one-time
Sewer$5,250.00 one-time
City$0.00
County$0.00
Total (Douglas): $9,979.00 one-time (≈ $9,979.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Douglas Cochise County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Cochise County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Douglas: Industrial Impact Fees

Industrial development in Douglas pays no per-square-foot impact fees, but owes $9,979.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $9,979.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Douglas) — 1" meter ($5,250.00 one-time), Water Impact Fee (City of Douglas) — 1" meter ($3,500.00 one-time) and Water Meter Installation (City of Douglas) — 1" meter ($1,229.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Douglas Impact Fee Schedule
Water$4,729.00 one-time
  • Water Impact Fee (City of Douglas) — 1" meter
    City of Douglas
    One-time water impact fee due at building permit, set by water meter size from $1,400 (3/4 inch) to $70,000 (6 inch); shown for a 1 inch meter. Charged in addition to the sewer impact fee and the water meter installation charge.
    $3,500.00 one-time
  • Water Meter Installation (City of Douglas) — 1" meter
    City of Douglas
    One-time charge for the City to install a new water meter, by meter size from $943 (3/4 inch or smaller) to $5,122 (6 inch); shown for a 1 inch meter. The cost of the meter itself is billed in addition.
    $1,229.00 one-time
Sewer$5,250.00 one-time
City$0.00
County$0.00
Total (Douglas): $9,979.00 one-time (≈ $9,979.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Douglas Cochise County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Cochise County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Douglas: Office Impact Fees

Office development in Douglas pays no per-square-foot impact fees, but owes $9,979.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 25,000 sq ft building, that comes to about $9,979.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Douglas) — 1" meter ($5,250.00 one-time), Water Impact Fee (City of Douglas) — 1" meter ($3,500.00 one-time) and Water Meter Installation (City of Douglas) — 1" meter ($1,229.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Douglas Impact Fee Schedule
Water$4,729.00 one-time
  • Water Impact Fee (City of Douglas) — 1" meter
    City of Douglas
    One-time water impact fee due at building permit, set by water meter size from $1,400 (3/4 inch) to $70,000 (6 inch); shown for a 1 inch meter. Charged in addition to the sewer impact fee and the water meter installation charge.
    $3,500.00 one-time
  • Water Meter Installation (City of Douglas) — 1" meter
    City of Douglas
    One-time charge for the City to install a new water meter, by meter size from $943 (3/4 inch or smaller) to $5,122 (6 inch); shown for a 1 inch meter. The cost of the meter itself is billed in addition.
    $1,229.00 one-time
Sewer$5,250.00 one-time
City$0.00
County$0.00
Total (Douglas): $9,979.00 one-time (≈ $9,979.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Douglas Cochise County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Cochise County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Douglas Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Douglas Impact Fee FAQs

What are the total impact fees for a single-family home in Douglas, Arizona?

A new single-family home in Douglas pays $4,443.00 per unit in combined impact fees (rates sourced October 15, 2026).

How much are commercial impact fees in Douglas?

Commercial development in Douglas pays no per-square-foot impact fees, but owes $9,979.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Douglas charge its own impact fees?

Yes. Douglas levies its own municipal impact or utility fees. Cochise County does not currently add county-level impact fees inside Douglas. The schedule on this page shows every fee that applies to development in Douglas.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Cochise County impact fees page.