Bullhead City, Arizona Impact Fees

Bullhead City applies its own fee schedule. Mohave County does not currently add county-level impact fees inside city limits. A new single-family home pays $12,914.00 per unit (rates sourced ). The full breakdown is below.

Bullhead City Impact Fees by Project Type

Bullhead City: Single-Family Impact Fees

A new single-family home in Bullhead City pays $12,914.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Service Line and Meter Installation (Bullhead City) — 5/8" x 3/4" meter ($8,055.00), Sewer Capacity Charge (Bullhead City) ($4,304.00) and Water Resource Development Fee (Bullhead City) — Bullhead City contract area ($405.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Bullhead City Impact Fee Schedule
Water$8,460.00
  • Water Service Line and Meter Installation (Bullhead City) — 5/8" x 3/4" meter
    Bullhead City
    One-time Bullhead City charge to install the water service line and meter, a non-refundable contribution set by meter size under the FY 2026-27 comprehensive fee schedule effective July 1, 2026: $7,600 for the service line plus $455 for a 5/8 by 3/4 inch meter, the standard home meter. Meters 3 inches and larger are billed at cost. Parcels served by Bermuda Water Company pay that company's charges instead.
    $8,055.00
  • Water Resource Development Fee (Bullhead City) — Bullhead City contract area
    Bullhead City
    One-time Bullhead City water resource development fee per single-family home, collected when the building permit is issued (developers may prepay during subdivision). The rate depends on the City water contract area: $405 in the Bullhead City contract area and $721 in the Mohave Water Conservation District contract area. Rates from the FY 2026-27 comprehensive fee schedule effective July 1, 2026.
    $405.00
Sewer$4,454.00
  • Sewer Capacity Charge (Bullhead City)
    Bullhead City
    One-time Bullhead City residential sewer capacity charge per dwelling unit, adopted with the FY 2026-27 comprehensive fee schedule effective July 1, 2026 (rate unchanged from the prior year). A separate sewer tap fee applies, and lateral installation is billed at actual cost.
    $4,304.00
  • Sewer Tap Fee (Bullhead City)
    Bullhead City
    One-time Bullhead City sewer tap fee per tap-in, paid in addition to the sewer capacity charge. Rate from the FY 2026-27 comprehensive fee schedule effective July 1, 2026.
    $150.00
City$0.00
  • City Development Impact Fee (Bullhead City)
    Bullhead City
    Bullhead City does not levy development impact fees for streets, parks, police or fire facilities. The City's one-time development charges are the water resource development fee and the sewer capacity charge.
    $0.00
County$0.00
Total (Bullhead City): $12,914.00
Sources last checked Official fee schedules:Bullhead City Mohave County

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bullhead City: Multifamily Impact Fees

A new multifamily unit in Bullhead City pays $12,850.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Service Line and Meter Installation (Bullhead City, MF) — 5/8" x 3/4" meter ($8,055.00), Sewer Capacity Charge (Bullhead City, MF) ($4,304.00) and Water Resource Development Fee (Bullhead City, MF) — Bullhead City contract area ($341.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Bullhead City Impact Fee Schedule
Water$8,396.00
  • Water Service Line and Meter Installation (Bullhead City, MF) — 5/8" x 3/4" meter
    Bullhead City
    One-time Bullhead City charge to install the water service line and meter, a non-refundable contribution set by meter size under the FY 2026-27 comprehensive fee schedule effective July 1, 2026: $7,600 for the service line plus $455 for a 5/8 by 3/4 inch meter. It is charged per meter, not per unit, so a building on one meter pays once; larger meters pay the higher tiers. Meters 3 inches and larger are billed at cost. Parcels served by Bermuda Water Company pay that company's charges instead.
    $8,055.00
  • Water Resource Development Fee (Bullhead City, MF) — Bullhead City contract area
    Bullhead City
    One-time Bullhead City water resource development fee per multifamily unit, collected when the building permit is issued. The rate depends on the City water contract area: $341 per unit in the Bullhead City contract area and $596 per unit in the Mohave Water Conservation District contract area. Rates from the FY 2026-27 comprehensive fee schedule effective July 1, 2026.
    $341.00
Sewer$4,454.00
  • Sewer Capacity Charge (Bullhead City, MF)
    Bullhead City
    One-time Bullhead City residential sewer capacity charge per dwelling unit; the schedule applies the same per-unit charge to multifamily units. Adopted with the FY 2026-27 comprehensive fee schedule effective July 1, 2026 (rate unchanged from the prior year). A separate sewer tap fee applies, and lateral installation is billed at actual cost.
    $4,304.00
  • Sewer Tap Fee (Bullhead City, MF)
    Bullhead City
    One-time Bullhead City sewer tap fee per tap-in (per connection, not per unit), paid in addition to the sewer capacity charge. Rate from the FY 2026-27 comprehensive fee schedule effective July 1, 2026.
    $150.00
City$0.00
  • City Development Impact Fee (Bullhead City, MF)
    Bullhead City
    Bullhead City does not levy development impact fees for streets, parks, police or fire facilities. The City's one-time development charges are the water resource development fee and the sewer capacity charge.
    $0.00
County$0.00
Total (Bullhead City): $12,850.00
Sources last checked Official fee schedules:Bullhead City Mohave County

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bullhead City: Commercial Impact Fees

Commercial development in Bullhead City pays no per-square-foot impact fees, but owes $13,433.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $13,433.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Service Line and Meter Installation (Bullhead City) — 1" meter ($8,530.00 one-time), Sewer Capacity Charge (Bullhead City) — 1 REU minimum ($4,304.00 one-time) and Water Resource Development Fee (Bullhead City) — Bullhead City contract area, 1 acre-foot minimum ($449.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Bullhead City Impact Fee Schedule
Water$8,979.00 one-time
  • Water Service Line and Meter Installation (Bullhead City) — 1" meter
    City of Bullhead City
    One-time Bullhead City charge to install the water service line and meter, a non-refundable contribution set by meter size: $7,600 for the service line plus $930 for a 1-inch meter. Rates from the FY 2026-27 comprehensive fee schedule effective July 1, 2026; meters 3 inches and larger are billed at cost. Parcels served by Bermuda Water Company pay that company's charges instead.
    $8,530.00 one-time
  • Water Resource Development Fee (Bullhead City) — Bullhead City contract area, 1 acre-foot minimum
    City of Bullhead City
    Bullhead City charges commercial and industrial projects a one-time water resource development fee per acre-foot of estimated annual water use (an engineer's estimate): $449 per acre-foot or portion thereof in the Bullhead City contract area, so the amount shown is the one acre-foot minimum and a larger user pays more. The Mohave Water Conservation District contract area rate is $1,581 per acre-foot. Rates from the FY 2026-27 comprehensive fee schedule effective July 1, 2026; collected when the building permit is issued.
    $449.00 one-time
Sewer$4,454.00 one-time
  • Sewer Capacity Charge (Bullhead City) — 1 REU minimum
    City of Bullhead City
    Bullhead City sewer capacity charge for commercial and industrial connections: a minimum of 1 residential equivalency unit (15 fixture units) at $4,304, plus 1/15 of that rate for each additional fixture unit. Rate from the FY 2026-27 comprehensive fee schedule effective July 1, 2026. A separate $150 sewer tap fee applies, and lateral installation is billed at actual cost.
    $4,304.00 one-time
  • Sewer Tap Fee (Bullhead City)
    City of Bullhead City
    One-time Bullhead City sewer tap fee per tap-in, paid in addition to the sewer capacity charge. Rate from the FY 2026-27 comprehensive fee schedule effective July 1, 2026.
    $150.00 one-time
City$0.00
  • City Development Impact Fee (Bullhead City, Commercial)
    City of Bullhead City
    Bullhead City does not levy development impact fees for streets, parks, police or fire facilities. Commercial projects pay the City water resource development fee, the sewer capacity charge and the water service line and meter installation charge.
    $0.00
County$0.00
Total (Bullhead City): $13,433.00 one-time (≈ $13,433.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bullhead City Mohave County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bullhead City: Industrial Impact Fees

Industrial development in Bullhead City pays no per-square-foot impact fees, but owes $13,433.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $13,433.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Service Line and Meter Installation (Bullhead City) — 1" meter ($8,530.00 one-time), Sewer Capacity Charge (Bullhead City) — 1 REU minimum ($4,304.00 one-time) and Water Resource Development Fee (Bullhead City) — Bullhead City contract area, 1 acre-foot minimum ($449.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Bullhead City Impact Fee Schedule
Water$8,979.00 one-time
  • Water Service Line and Meter Installation (Bullhead City) — 1" meter
    City of Bullhead City
    One-time Bullhead City charge to install the water service line and meter, a non-refundable contribution set by meter size: $7,600 for the service line plus $930 for a 1-inch meter. Rates from the FY 2026-27 comprehensive fee schedule effective July 1, 2026; meters 3 inches and larger are billed at cost. Parcels served by Bermuda Water Company pay that company's charges instead.
    $8,530.00 one-time
  • Water Resource Development Fee (Bullhead City) — Bullhead City contract area, 1 acre-foot minimum
    City of Bullhead City
    Bullhead City charges commercial and industrial projects a one-time water resource development fee per acre-foot of estimated annual water use (an engineer's estimate): $449 per acre-foot or portion thereof in the Bullhead City contract area, so the amount shown is the one acre-foot minimum and a larger user pays more. The Mohave Water Conservation District contract area rate is $1,581 per acre-foot. Rates from the FY 2026-27 comprehensive fee schedule effective July 1, 2026; collected when the building permit is issued.
    $449.00 one-time
Sewer$4,454.00 one-time
  • Sewer Capacity Charge (Bullhead City) — 1 REU minimum
    City of Bullhead City
    Bullhead City sewer capacity charge for commercial and industrial connections: a minimum of 1 residential equivalency unit (15 fixture units) at $4,304, plus 1/15 of that rate for each additional fixture unit. Rate from the FY 2026-27 comprehensive fee schedule effective July 1, 2026. A separate $150 sewer tap fee applies, and lateral installation is billed at actual cost.
    $4,304.00 one-time
  • Sewer Tap Fee (Bullhead City)
    City of Bullhead City
    One-time Bullhead City sewer tap fee per tap-in, paid in addition to the sewer capacity charge. Rate from the FY 2026-27 comprehensive fee schedule effective July 1, 2026.
    $150.00 one-time
City$0.00
  • City Development Impact Fee (Bullhead City, Industrial)
    City of Bullhead City
    Bullhead City does not levy development impact fees for streets, parks, police or fire facilities. Industrial projects pay the City water resource development fee, the sewer capacity charge and the water service line and meter installation charge.
    $0.00
County$0.00
Total (Bullhead City): $13,433.00 one-time (≈ $13,433.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bullhead City Mohave County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bullhead City: Office Impact Fees

Office development in Bullhead City pays no per-square-foot impact fees, but owes $13,433.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 25,000 sq ft building, that comes to about $13,433.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Service Line and Meter Installation (Bullhead City) — 1" meter ($8,530.00 one-time), Sewer Capacity Charge (Bullhead City) — 1 REU minimum ($4,304.00 one-time) and Water Resource Development Fee (Bullhead City) — Bullhead City contract area, 1 acre-foot minimum ($449.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Bullhead City Impact Fee Schedule
Water$8,979.00 one-time
  • Water Service Line and Meter Installation (Bullhead City) — 1" meter
    City of Bullhead City
    One-time Bullhead City charge to install the water service line and meter, a non-refundable contribution set by meter size: $7,600 for the service line plus $930 for a 1-inch meter. Rates from the FY 2026-27 comprehensive fee schedule effective July 1, 2026; meters 3 inches and larger are billed at cost. Parcels served by Bermuda Water Company pay that company's charges instead.
    $8,530.00 one-time
  • Water Resource Development Fee (Bullhead City) — Bullhead City contract area, 1 acre-foot minimum
    City of Bullhead City
    Bullhead City charges commercial and industrial projects a one-time water resource development fee per acre-foot of estimated annual water use (an engineer's estimate): $449 per acre-foot or portion thereof in the Bullhead City contract area, so the amount shown is the one acre-foot minimum and a larger user pays more. The Mohave Water Conservation District contract area rate is $1,581 per acre-foot. Rates from the FY 2026-27 comprehensive fee schedule effective July 1, 2026; collected when the building permit is issued.
    $449.00 one-time
Sewer$4,454.00 one-time
  • Sewer Capacity Charge (Bullhead City) — 1 REU minimum
    City of Bullhead City
    Bullhead City sewer capacity charge for commercial and industrial connections: a minimum of 1 residential equivalency unit (15 fixture units) at $4,304, plus 1/15 of that rate for each additional fixture unit. Rate from the FY 2026-27 comprehensive fee schedule effective July 1, 2026. A separate $150 sewer tap fee applies, and lateral installation is billed at actual cost.
    $4,304.00 one-time
  • Sewer Tap Fee (Bullhead City)
    City of Bullhead City
    One-time Bullhead City sewer tap fee per tap-in, paid in addition to the sewer capacity charge. Rate from the FY 2026-27 comprehensive fee schedule effective July 1, 2026.
    $150.00 one-time
City$0.00
  • City Development Impact Fee (Bullhead City, Office)
    City of Bullhead City
    Bullhead City does not levy development impact fees for streets, parks, police or fire facilities. Office projects pay the City water resource development fee, the sewer capacity charge and the water service line and meter installation charge.
    $0.00
County$0.00
Total (Bullhead City): $13,433.00 one-time (≈ $13,433.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Bullhead City Mohave County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bullhead City Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Bullhead City Impact Fee FAQs

What are the total impact fees for a single-family home in Bullhead City, Arizona?

A new single-family home in Bullhead City pays $12,914.00 per unit in combined impact fees (rates sourced October 15, 2026).

How much are commercial impact fees in Bullhead City?

Commercial development in Bullhead City pays no per-square-foot impact fees, but owes $13,433.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Bullhead City charge its own impact fees?

Yes. Bullhead City levies its own municipal impact or utility fees. Mohave County does not currently add county-level impact fees inside Bullhead City. The schedule on this page shows every fee that applies to development in Bullhead City.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Mohave County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000