Kingman applies its own fee schedule. Mohave County does not currently add county-level impact fees inside city limits. A new single-family home pays $7,093.00 per unit (rates sourced ). The full breakdown is below.

Kingman Impact Fees by Project Type

Kingman: Single-Family Impact Fees

A new single-family home in Kingman pays $7,093.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Capacity Fee (City of Kingman) — 3/4" meter ($4,072.00), Water Capacity Fee (City of Kingman) — 3/4" meter ($874.00) and Street Development Fee (City of Kingman) ($713.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Kingman Impact Fee Schedule
Water$874.00
  • Water Capacity Fee (City of Kingman) — 3/4" meter
    City of Kingman
    One-time City of Kingman water capacity fee, set by meter size and charged throughout the City water service area, including areas outside city limits (it replaces a water development fee). A single-family home on the standard 3/4-inch displacement meter pays this tier; larger meters pay the higher tiers. Rates effective December 15, 2022; the City is reviewing capacity fees for FY2026-27.
    $874.00
Sewer$4,072.00
  • Wastewater Capacity Fee (City of Kingman) — 3/4" meter
    City of Kingman
    One-time City of Kingman wastewater capacity fee, set by meter size and charged throughout the City wastewater service area, including areas outside city limits (it replaces a wastewater development fee). A single-family home on the standard 3/4-inch displacement meter pays this tier; larger meters pay the higher tiers. Rates effective December 15, 2022; the City is reviewing capacity fees for FY2026-27.
    $4,072.00
City$2,147.00
  • Street Development Fee (City of Kingman)
    City of Kingman
    City of Kingman street facilities development fee, charged per new single-family home inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); amount from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $713.00
  • Fire Development Fee (City of Kingman)
    City of Kingman
    City of Kingman fire facilities development fee, charged per new single-family home inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); amount from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $711.00
  • Parks and Recreational Development Fee (City of Kingman)
    City of Kingman
    City of Kingman parks and recreational facilities development fee, charged per new single-family home inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); amount from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $393.00
  • Police Development Fee (City of Kingman)
    City of Kingman
    City of Kingman police facilities development fee, charged per new single-family home inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); amount from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $330.00
County$0.00
Total (Kingman): $7,093.00
Sources last checked Official fee schedules:City of Kingman Mohave County

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Kingman: Multifamily Impact Fees

A new multifamily unit in Kingman pays $6,293.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Capacity Fee (City of Kingman, MF) — 3/4" meter ($4,072.00), Water Capacity Fee (City of Kingman, MF) — 3/4" meter ($874.00) and Fire Development Fee (City of Kingman, MF) ($459.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Kingman Impact Fee Schedule
Water$874.00
  • Water Capacity Fee (City of Kingman, MF) — 3/4" meter
    City of Kingman
    One-time City of Kingman water capacity fee, charged throughout the City water service area, including areas outside city limits. It is set by the size of the meter serving the building, not per unit: the 3/4-inch tier is the smallest meter and larger master meters pay the higher tiers. Rates effective December 15, 2022; the City is reviewing capacity fees for FY2026-27.
    $874.00
Sewer$4,072.00
  • Wastewater Capacity Fee (City of Kingman, MF) — 3/4" meter
    City of Kingman
    One-time City of Kingman wastewater capacity fee, charged throughout the City wastewater service area, including areas outside city limits. It is set by the size of the meter serving the building, not per unit: the 3/4-inch tier is the smallest meter and larger master meters pay the higher tiers. Rates effective December 15, 2022; the City is reviewing capacity fees for FY2026-27.
    $4,072.00
City$1,347.00
  • Fire Development Fee (City of Kingman, MF)
    City of Kingman
    City of Kingman fire facilities development fee, charged per multifamily dwelling unit inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); amount from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $459.00
  • Street Development Fee (City of Kingman, MF)
    City of Kingman
    City of Kingman street facilities development fee, charged per multifamily dwelling unit inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); amount from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $421.00
  • Parks and Recreational Development Fee (City of Kingman, MF)
    City of Kingman
    City of Kingman parks and recreational facilities development fee, charged per multifamily dwelling unit inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); amount from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $254.00
  • Police Development Fee (City of Kingman, MF)
    City of Kingman
    City of Kingman police facilities development fee, charged per multifamily dwelling unit inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); amount from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $213.00
County$0.00
Total (Kingman): $6,293.00
Sources last checked Official fee schedules:City of Kingman Mohave County

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Kingman: Commercial Impact Fees

Commercial development in Kingman pays $1.77 per square foot in impact fees, plus $8,259.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $96,759.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capacity Fee (City of Kingman) — 1" meter ($6,799.00 one-time), Water Capacity Fee (City of Kingman) — 1" meter ($1,460.00 one-time) and Street Development Fee (City of Kingman, Commercial) ($1.13/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Kingman Impact Fee Schedule
Water$1,460.00 one-time
  • Water Capacity Fee (City of Kingman) — 1" meter
    City of Kingman
    City of Kingman water capacity fee, charged by meter size under one schedule for all customer classes, inside and outside city limits; effective December 15, 2022. A 1-inch meter is $1,460; larger meters scale up (for example, 2-inch $4,661, 4-inch $14,577 to $18,364).
    $1,460.00 one-time
Sewer$6,799.00 one-time
  • Wastewater Capacity Fee (City of Kingman) — 1" meter
    City of Kingman
    City of Kingman wastewater capacity fee, charged by water meter size under one schedule for all customer classes, inside and outside city limits; effective December 15, 2022. A 1-inch meter is $6,799; larger meters scale up (for example, 2-inch $21,701, 4-inch $67,872 to $85,502).
    $6,799.00 one-time
City$1.77/sq ft
  • Street Development Fee (City of Kingman, Commercial)
    City of Kingman
    City of Kingman street facilities development fee for commercial development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $1.13/sq ft
  • Police Development Fee (City of Kingman, Commercial)
    City of Kingman
    City of Kingman police facilities development fee for commercial development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.50/sq ft
  • Fire Development Fee (City of Kingman, Commercial)
    City of Kingman
    City of Kingman fire facilities development fee for commercial development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.09/sq ft
  • Parks and Recreational Development Fee (City of Kingman, Commercial)
    City of Kingman
    City of Kingman parks and recreational facilities development fee for commercial development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.05/sq ft
County$0.00
Total (Kingman): $1.77/sq ft + $8,259.00 one-time (≈ $96,759.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Kingman Mohave County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Kingman: Industrial Impact Fees

Industrial development in Kingman pays $0.42 per square foot in impact fees, plus $8,259.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $29,259.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capacity Fee (City of Kingman) — 1" meter ($6,799.00 one-time), Water Capacity Fee (City of Kingman) — 1" meter ($1,460.00 one-time) and Street Development Fee (City of Kingman, Industrial) ($0.22/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Kingman Impact Fee Schedule
Water$1,460.00 one-time
  • Water Capacity Fee (City of Kingman) — 1" meter
    City of Kingman
    City of Kingman water capacity fee, charged by meter size under one schedule for all customer classes, inside and outside city limits; effective December 15, 2022. A 1-inch meter is $1,460; larger meters scale up (for example, 2-inch $4,661, 4-inch $14,577 to $18,364).
    $1,460.00 one-time
Sewer$6,799.00 one-time
  • Wastewater Capacity Fee (City of Kingman) — 1" meter
    City of Kingman
    City of Kingman wastewater capacity fee, charged by water meter size under one schedule for all customer classes, inside and outside city limits; effective December 15, 2022. A 1-inch meter is $6,799; larger meters scale up (for example, 2-inch $21,701, 4-inch $67,872 to $85,502).
    $6,799.00 one-time
City$0.42/sq ft
  • Street Development Fee (City of Kingman, Industrial)
    City of Kingman
    City of Kingman street facilities development fee for industrial development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $0.22/sq ft
  • Police Development Fee (City of Kingman, Industrial)
    City of Kingman
    City of Kingman police facilities development fee for industrial development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.10/sq ft
  • Fire Development Fee (City of Kingman, Industrial)
    City of Kingman
    City of Kingman fire facilities development fee for industrial development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.06/sq ft
  • Parks and Recreational Development Fee (City of Kingman, Industrial)
    City of Kingman
    City of Kingman parks and recreational facilities development fee for industrial development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.04/sq ft
County$0.00
Total (Kingman): $0.42/sq ft + $8,259.00 one-time (≈ $29,259.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Kingman Mohave County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Kingman: Office Impact Fees

Office development in Kingman pays $0.80 per square foot in impact fees, plus $8,259.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 25,000 sq ft building, that comes to about $28,259.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capacity Fee (City of Kingman) — 1" meter ($6,799.00 one-time), Water Capacity Fee (City of Kingman) — 1" meter ($1,460.00 one-time) and Street Development Fee (City of Kingman, Office) ($0.43/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Kingman Impact Fee Schedule
Water$1,460.00 one-time
  • Water Capacity Fee (City of Kingman) — 1" meter
    City of Kingman
    City of Kingman water capacity fee, charged by meter size under one schedule for all customer classes, inside and outside city limits; effective December 15, 2022. A 1-inch meter is $1,460; larger meters scale up (for example, 2-inch $4,661, 4-inch $14,577 to $18,364).
    $1,460.00 one-time
Sewer$6,799.00 one-time
  • Wastewater Capacity Fee (City of Kingman) — 1" meter
    City of Kingman
    City of Kingman wastewater capacity fee, charged by water meter size under one schedule for all customer classes, inside and outside city limits; effective December 15, 2022. A 1-inch meter is $6,799; larger meters scale up (for example, 2-inch $21,701, 4-inch $67,872 to $85,502).
    $6,799.00 one-time
City$0.80/sq ft
  • Street Development Fee (City of Kingman, Office)
    City of Kingman
    City of Kingman street facilities development fee for office and other services development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026. The City is reviewing its Infrastructure Improvements Plan and expects to bring proposed fee adjustments to Council during FY2026-27.
    $0.43/sq ft
  • Police Development Fee (City of Kingman, Office)
    City of Kingman
    City of Kingman police facilities development fee for office and other services development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.19/sq ft
  • Fire Development Fee (City of Kingman, Office)
    City of Kingman
    City of Kingman fire facilities development fee for office and other services development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.11/sq ft
  • Parks and Recreational Development Fee (City of Kingman, Office)
    City of Kingman
    City of Kingman parks and recreational facilities development fee for office and other services development, charged per square foot of floor area inside city limits and paid before the building permit is issued. In effect since October 2021 under the 2021 Development Fee Ordinance (Ord. 1928); rate from the comprehensive fee schedule effective July 1, 2026.
    $0.07/sq ft
County$0.00
Total (Kingman): $0.80/sq ft + $8,259.00 one-time (≈ $28,259.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Kingman Mohave County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Mohave County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Kingman Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Kingman Impact Fee FAQs

What are the total impact fees for a single-family home in Kingman, Arizona?

A new single-family home in Kingman pays $7,093.00 per unit in combined impact fees (rates sourced October 15, 2026).

How much are commercial impact fees in Kingman?

Commercial development in Kingman pays $1.77 per square foot in impact fees, plus $8,259.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $96,759.00 for a 50,000 sq ft building.

Does Kingman charge its own impact fees?

Yes. Kingman levies its own municipal impact or utility fees. Mohave County does not currently add county-level impact fees inside Kingman. The schedule on this page shows every fee that applies to development in Kingman.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Mohave County impact fees page.