San Luis applies its own fee schedule. Yuma County does not currently add county-level impact fees inside city limits. A new single-family home pays $9,311.00 per unit (rates sourced ). The full breakdown is below.

San Luis Impact Fees by Project Type

San Luis: Single-Family Impact Fees

A new single-family home in San Luis pays $9,311.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Development Impact Fee (City of San Luis) ($6,346.00), Water Development Fee (City of San Luis) — 0.75" displacement meter ($1,696.00) and Wastewater Development Fee (City of San Luis) — 0.75" displacement meter ($1,269.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full San Luis Impact Fee Schedule
Water$1,696.00
  • Water Development Fee (City of San Luis) — 0.75" displacement meter
    City of San Luis
    San Luis charges a one-time water development fee by meter size and type, from $1,696 for a 0.75-inch displacement meter (the standard home meter) up to $90,434 for an 8-inch compound meter. The schedule was adopted by council in July 2025 and took effect September 22, 2025.
    $1,696.00
Sewer$1,269.00
  • Wastewater Development Fee (City of San Luis) — 0.75" displacement meter
    City of San Luis
    San Luis charges a one-time wastewater development fee by meter size and type, from $1,269 for a 0.75-inch displacement meter (the standard home meter) up to $67,676 for an 8-inch compound meter. The schedule was adopted by council in July 2025 and took effect September 22, 2025.
    $1,269.00
City$6,346.00
  • Development Impact Fee (City of San Luis)
    City of San Luis
    San Luis charges a development fee of $6,346 for a single-family home, made up of fire, parks and recreation, police and street components. The schedule was adopted by council in July 2025 and took effect September 22, 2025. Water and wastewater development fees are charged separately based on meter size.
    $6,346.00
County$0.00
Total (San Luis): $9,311.00
Sources last checked Official fee schedules:City of San Luis Yuma County

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Luis: Multifamily Impact Fees

A new multifamily unit in San Luis pays $8,074.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Development Impact Fee (City of San Luis, MF) ($5,109.00), Water Development Fee (City of San Luis, MF) — 0.75" displacement meter ($1,696.00) and Wastewater Development Fee (City of San Luis, MF) — 0.75" displacement meter ($1,269.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full San Luis Impact Fee Schedule
Water$1,696.00
  • Water Development Fee (City of San Luis, MF) — 0.75" displacement meter
    City of San Luis
    San Luis charges its water development fee per meter by size and type, not per dwelling unit. A unit with its own 0.75-inch displacement meter pays $1,696; a building served through one larger meter pays once at that meter's size, up to $90,434 for an 8-inch compound meter. Adopted July 2025, effective September 22, 2025.
    $1,696.00
Sewer$1,269.00
  • Wastewater Development Fee (City of San Luis, MF) — 0.75" displacement meter
    City of San Luis
    San Luis charges its wastewater development fee per meter by size and type, not per dwelling unit. A unit with its own 0.75-inch displacement meter pays $1,269; a building served through one larger meter pays once at that meter's size, up to $67,676 for an 8-inch compound meter. Adopted July 2025, effective September 22, 2025.
    $1,269.00
City$5,109.00
  • Development Impact Fee (City of San Luis, MF)
    City of San Luis
    San Luis charges a development fee of $5,109 per multifamily dwelling unit, made up of fire, parks and recreation, police and street components. The schedule was adopted by council in July 2025 and took effect September 22, 2025. Water and wastewater development fees are charged separately based on meter size.
    $5,109.00
County$0.00
Total (San Luis): $8,074.00
Sources last checked Official fee schedules:City of San Luis Yuma County

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Luis: Commercial Impact Fees

Commercial development in San Luis pays $6.78 per square foot in impact fees, plus $4,951.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $343,801.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Fee (City of San Luis) — 1" displacement meter ($2,832.00 one-time), Wastewater Development Fee (City of San Luis) — 1" displacement meter ($2,119.00 one-time) and Police Development Fee (City of San Luis, Commercial) ($3.13/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full San Luis Impact Fee Schedule
Water$2,832.00 one-time
Sewer$2,119.00 one-time
City$6.78/sq ft
County$0.00
Total (San Luis): $6.78/sq ft + $4,951.00 one-time (≈ $343,801.00 at 50,000 sq ft)
Sources last checked Official fee schedule:City of San Luis
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Luis: Industrial Impact Fees

Industrial development in San Luis pays $2.69 per square foot in impact fees, plus $4,951.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $139,451.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Fee (City of San Luis) — 1" displacement meter ($2,832.00 one-time), Wastewater Development Fee (City of San Luis) — 1" displacement meter ($2,119.00 one-time) and Fire Development Fee (City of San Luis, Industrial) ($1.31/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full San Luis Impact Fee Schedule
Water$2,832.00 one-time
Sewer$2,119.00 one-time
City$2.69/sq ft
County$0.00
Total (San Luis): $2.69/sq ft + $4,951.00 one-time (≈ $139,451.00 at 50,000 sq ft)
Sources last checked Official fee schedule:City of San Luis
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Luis: Office Impact Fees

Office development in San Luis pays $5.74 per square foot in impact fees, plus $4,951.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 25,000 sq ft building, that comes to about $148,426.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Fee (City of San Luis) — 1" displacement meter ($2,832.00 one-time), Wastewater Development Fee (City of San Luis) — 1" displacement meter ($2,119.00 one-time) and Fire Development Fee (City of San Luis, Office) ($2.71/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full San Luis Impact Fee Schedule
Water$2,832.00 one-time
Sewer$2,119.00 one-time
City$5.74/sq ft
County$0.00
Total (San Luis): $5.74/sq ft + $4,951.00 one-time (≈ $148,426.00 at 25,000 sq ft)
Sources last checked Official fee schedule:City of San Luis
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Luis Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

San Luis Impact Fee FAQs

What are the total impact fees for a single-family home in San Luis, Arizona?

A new single-family home in San Luis pays $9,311.00 per unit in combined impact fees (rates sourced October 15, 2026).

How much are commercial impact fees in San Luis?

Commercial development in San Luis pays $6.78 per square foot in impact fees, plus $4,951.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $343,801.00 for a 50,000 sq ft building.

Does San Luis charge its own impact fees?

Yes. San Luis levies its own municipal impact or utility fees. Yuma County does not currently add county-level impact fees inside San Luis. The schedule on this page shows every fee that applies to development in San Luis.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Yuma County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000