Wellton applies its own fee schedule. Yuma County does not currently add county-level impact fees inside city limits. A new single-family home pays $2,879.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Wellton Impact Fees by Project Type

Wellton: Single-Family Impact Fees

A new single-family home in Wellton pays $2,879.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

Development Impact Fee (Town of Wellton) and Water Connection Fee (Town of Wellton) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Wellton Impact Fee Schedule
Water$1,243.00
  • Water Connection Fee (Town of Wellton)
    Town of Wellton
    Wellton runs its own water system and adopted a water development fee in 2014 of $1,243 per dwelling unit (the same as a 0.75-inch meter). The town has posted no fee schedule update since that study.
    $1,243.00Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Wellton)
    Town of Wellton
    Wellton does not operate a public sewer. Most homes use individual septic systems permitted by Yuma County, and the Coyote Wash subdivision is served by a private wastewater utility, so the town charges no sewer connection fee.
    $0.00
City$1,636.00
  • Development Impact Fee (Town of Wellton)
    Town of Wellton
    Wellton adopted development fees in 2014 of $1,636 per single-family home: parks and recreation $735, public safety $428 and streets $473. The town has posted no fee schedule update since that study. Water development fees are charged separately.
    $1,636.00Requires confirmation
County$0.00
Total (Wellton): $2,879.00
Sources last checked Official fee schedules:Town of Wellton Yuma County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wellton: Multifamily Impact Fees

A new multifamily unit in Wellton pays $2,604.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

Water Connection Fee (Town of Wellton, MF) and Development Impact Fee (Town of Wellton, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Wellton Impact Fee Schedule
Water$1,243.00
  • Water Connection Fee (Town of Wellton, MF)
    Town of Wellton
    Wellton runs its own water system and adopted a water development fee in 2014 of $1,243 per dwelling unit. The town has posted no fee schedule update since that study.
    $1,243.00Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Wellton, MF)
    Town of Wellton
    Wellton does not operate a public sewer. Development uses individual septic systems permitted by Yuma County, or the private wastewater utility serving the Coyote Wash subdivision, so the town charges no sewer connection fee.
    $0.00
City$1,361.00
  • Development Impact Fee (Town of Wellton, MF)
    Town of Wellton
    Wellton adopted development fees in 2014 of $1,361 per unit for buildings of two or more units: parks and recreation $606, public safety $352 and streets $403. The town has posted no fee schedule update since that study. Water development fees are charged separately.
    $1,361.00Requires confirmation
County$0.00
Total (Wellton): $2,604.00
Sources last checked Official fee schedules:Town of Wellton Yuma County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wellton: Commercial Impact Fees

Commercial development in Wellton pays $4.20 per square foot in impact fees, plus $1,307.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $211,407.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Development Impact Fee (Town of Wellton, Commercial) and Water Development Fee (Town of Wellton) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Wellton Impact Fee Schedule
Water$1,307.00 one-time
  • Water Development Fee (Town of Wellton) — 1" meter
    1" displacement
    Town of Wellton
    Wellton runs its own water system and adopted a water development fee in 2014, charged by meter size; the 1-inch meter is shown and larger meters pay more. The town has posted no fee schedule update since that study.
    $1,307.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Wellton)
    The Town of Wellton operates no municipal sewer utility; development uses septic systems or a private provider, so no town sewer connection fee applies.
    $0.00
City$4.20/sq ft
  • Development Impact Fee (Town of Wellton, Commercial)
    Town of Wellton
    Wellton adopted development fees in 2014 of $4,202 per 1,000 square feet of commercial floor area: parks and recreation $515, public safety $2,740 and streets $947. The town has posted no fee schedule update since that study. Water development fees are charged separately by meter size.
    $4.20/sq ftRequires confirmation
County$0.00
Total (Wellton): $4.20/sq ft + $1,307.00 one-time (≈ $211,407.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Town of Wellton
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wellton: Industrial Impact Fees

Industrial development in Wellton pays $1.40 per square foot in impact fees, plus $1,307.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $71,257.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Development Impact Fee (Town of Wellton, Industrial) and Water Development Fee (Town of Wellton) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Wellton Impact Fee Schedule
Water$1,307.00 one-time
  • Water Development Fee (Town of Wellton) — 1" meter
    1" displacement
    Town of Wellton
    Wellton runs its own water system and adopted a water development fee in 2014, charged by meter size; the 1-inch meter is shown and larger meters pay more. The town has posted no fee schedule update since that study.
    $1,307.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Wellton)
    The Town of Wellton operates no municipal sewer utility; development uses septic systems or a private provider, so no town sewer connection fee applies.
    $0.00
City$1.40/sq ft
  • Development Impact Fee (Town of Wellton, Industrial)
    Town of Wellton
    Wellton adopted development fees in 2014 of $1,399 per 1,000 square feet of industrial floor area: parks and recreation $462, public safety $678 and streets $259. The town has posted no fee schedule update since that study. Water development fees are charged separately by meter size.
    $1.40/sq ftRequires confirmation
County$0.00
Total (Wellton): $1.40/sq ft + $1,307.00 one-time (≈ $71,257.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Town of Wellton
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wellton: Office Impact Fees

Office development in Wellton pays $2.34 per square foot in impact fees, plus $1,307.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 25,000 sq ft building, that comes to about $59,757.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Development Impact Fee (Town of Wellton, Office) and Water Development Fee (Town of Wellton) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Wellton Impact Fee Schedule
Water$1,307.00 one-time
  • Water Development Fee (Town of Wellton) — 1" meter
    1" displacement
    Town of Wellton
    Wellton runs its own water system and adopted a water development fee in 2014, charged by meter size; the 1-inch meter is shown and larger meters pay more. The town has posted no fee schedule update since that study.
    $1,307.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Wellton)
    The Town of Wellton operates no municipal sewer utility; development uses septic systems or a private provider, so no town sewer connection fee applies.
    $0.00
City$2.34/sq ft
  • Development Impact Fee (Town of Wellton, Office)
    Town of Wellton
    Wellton adopted development fees in 2014 of $2,338 per 1,000 square feet of office floor area: parks and recreation $855, public safety $1,073 and streets $410. The town has posted no fee schedule update since that study. Water development fees are charged separately by meter size.
    $2.34/sq ftRequires confirmation
County$0.00
Total (Wellton): $2.34/sq ft + $1,307.00 one-time (≈ $59,757.00 at 25,000 sq ft)
Sources last checked Official fee schedule:Town of Wellton
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Yuma County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wellton Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Wellton Impact Fee FAQs

What are the total impact fees for a single-family home in Wellton, Arizona?

A new single-family home in Wellton pays $2,879.00 per unit in combined impact fees (rates sourced October 15, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Wellton?

Commercial development in Wellton pays $4.20 per square foot in impact fees, plus $1,307.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $211,407.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Wellton charge its own impact fees?

Yes. Wellton levies its own municipal impact or utility fees. Yuma County does not currently add county-level impact fees inside Wellton. The schedule on this page shows every fee that applies to development in Wellton.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Yuma County impact fees page.