Glen St. Mary, Florida Impact Fees

Glen St. Mary applies its own fee schedule. Baker County does not currently add county-level impact fees inside city limits. A new single-family home pays $4,550.00 per unit (rates sourced ). The full breakdown is below.

Glen St. Mary impact fees by project type

Glen St. Mary: Single-Family Impact Fees

A new single-family home in Glen St. Mary pays $4,550.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — tap $600/ERU + capacity $1,750/ERU ($2,350.00) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — tap $1,200/ERU + capacity $1,000/ERU ($2,200.00).

View the full Glen St. Mary impact fee schedule
Water$2,200.00
  • Water Tap + System Capacity Fee (Town of Glen St. Mary) — tap $1,200/ERU + capacity $1,000/ERU
    Town of Glen St. Mary
    Town of Glen St. Mary water charges for a new development connection total $2,200.00 per equivalent residential unit (ERU): a $1,200.00 tap fee (Ord. 2013-03 Sec. 6) plus a $1,000.00 water system capacity fee (Sec. 7). Adopted Nov. 19, 2013 and unchanged since, though Sec. 10 permits the Town Council to modify the rates by resolution. The reduced $500.00 and $0.00 capacity tiers in Sec. 7 apply only to connections made within 365 days and 90 days respectively of initial system construction, so they do not reach new development. Section 23 requires a separate connection and meter for each dwelling unit, so every unit is charged a full 1.0 ERU.
    $2,200.00
Sewer$2,350.00
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — tap $600/ERU + capacity $1,750/ERU
    Town of Glen St. Mary
    Town of Glen St. Mary sewer charges for a new development connection total $2,350.00 per equivalent residential unit (ERU): a $600.00 tap fee (Ord. 2013-03 Sec. 6) plus a $1,750.00 sewer system capacity fee for new residential and business development connections (Sec. 8). Ordinary non-development connections pay a $750.00 capacity fee instead. Adopted Nov. 19, 2013; Sec. 10 permits the Town Council to modify the rates by resolution. IMPORTANT — availability is restricted: Ordinance 2025-01, adopted March 18, 2025, imposes an interim moratorium under which the Town will not issue capacity for new sewer ERUs except as explicitly approved case by case on a first-come basis, and the moratorium runs indefinitely until the Town Council ordains otherwise. The Town's discharge allotment under its 2003 wastewater interlocal with the City of Macclenny is at capacity. Capacity granted after March 18, 2025 is forfeited, and the fee refunded without interest, unless the parcel is connected and receives a certificate of occupancy within an 18-month development period. Section 23 of Ord. 2013-03 requires a separate connection for each dwelling unit, so every unit is charged a full 1.0 ERU.
    $2,350.00
City$0.00
  • City Impact Fees (Town of Glen St. Mary)
    Town of Glen St. Mary
    The Town of Glen St. Mary levies no municipal impact or development fees. Its ordinances from 2012 through 2025 contain no impact-fee ordinance of any kind; the town's only one-time development charges are the water and sewer tap and system capacity fees under Ord. 2013-03. Baker County levies no impact fees either, so no county overlay applies inside the town.
    $0.00
County$0.00
  • County Impact Fees (Baker County, within Glen St. Mary)
    Baker County
    Baker County operates no impact fee program of any kind — no transportation, parks, fire, EMS, school or utility capacity impact fee, either countywide or in the unincorporated area. The county's published development charges are limited to building permit fees and Planning & Zoning application, advertising and technical review fees. No county fee applies within the Town of Glen St. Mary.
    $0.00
Total (Glen St. Mary): $4,550.00
Sources last checked Official fee schedules:Town of Glen St. Mary Baker County

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Glen St. Mary: Multifamily Impact Fees

A new multifamily unit in Glen St. Mary pays $4,550.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $600/ERU + capacity $1,750/ERU ($2,350.00) and Water Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $1,200/ERU + capacity $1,000/ERU ($2,200.00).

View the full Glen St. Mary impact fee schedule
Water$2,200.00
  • Water Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $1,200/ERU + capacity $1,000/ERU
    Town of Glen St. Mary
    Town of Glen St. Mary water charges for a new development connection total $2,200.00 per dwelling unit: a $1,200.00 tap fee (Ord. 2013-03 Sec. 6) plus a $1,000.00 water system capacity fee (Sec. 7). Section 23 requires a separate connection and meter for each separate unit, so every apartment is charged a full equivalent residential unit — the town publishes no reduced multifamily factor, and the per-unit multifamily amount is the same as the single-family amount by design. Adopted Nov. 19, 2013 and unchanged since, though Sec. 10 permits the Town Council to modify the rates by resolution. The reduced $500.00 and $0.00 capacity tiers in Sec. 7 apply only to connections made within 365 days and 90 days respectively of initial system construction, so they do not reach new development.
    $2,200.00
Sewer$2,350.00
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $600/ERU + capacity $1,750/ERU
    Town of Glen St. Mary
    Town of Glen St. Mary sewer charges for a new development connection total $2,350.00 per dwelling unit: a $600.00 tap fee (Ord. 2013-03 Sec. 6) plus a $1,750.00 sewer system capacity fee for new residential and business development connections (Sec. 8); ordinary non-development connections pay $750.00 instead. Section 23 requires a separate connection and meter for each separate unit, so every apartment is charged a full equivalent residential unit and the per-unit multifamily amount matches the single-family amount by design. IMPORTANT — availability is restricted, and the restriction falls hardest on multifamily because a project needs many units released at once: Ordinance 2025-01, adopted March 18, 2025, imposes an interim moratorium under which the Town will not issue capacity for new sewer ERUs except as explicitly approved case by case on a first-come basis, running indefinitely until the Town Council ordains otherwise. The Town's discharge allotment under its 2003 wastewater interlocal with the City of Macclenny is at capacity. Capacity granted after March 18, 2025 is parcel- and unit-specific, is not transferable without the Town's consent, and is forfeited — with the fee refunded without interest — unless the parcel is connected and receives a certificate of occupancy within an 18-month development period.
    $2,350.00
City$0.00
  • City Impact Fees (Town of Glen St. Mary, MF)
    Town of Glen St. Mary
    The Town of Glen St. Mary levies no municipal impact or development fees on multifamily construction. Its ordinances from 2012 through 2025 contain no impact-fee ordinance of any kind; the town's only one-time development charges are the water and sewer tap and system capacity fees under Ord. 2013-03. Baker County levies no impact fees either, so no county overlay applies inside the town.
    $0.00
County$0.00
  • County Impact Fees (Baker County, within Glen St. Mary, MF)
    Baker County
    Baker County operates no impact fee program of any kind — no transportation, parks, fire, EMS, school or utility capacity impact fee, and no multifamily rate schedule. The county's published development charges are limited to building permit fees and Planning & Zoning application, advertising and technical review fees. No county fee applies within the Town of Glen St. Mary.
    $0.00
Total (Glen St. Mary): $4,550.00
Sources last checked Official fee schedules:Town of Glen St. Mary Baker County

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Glen St. Mary: Commercial Impact Fees

Commercial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 50,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).

View the full Glen St. Mary impact fee schedule
Water$2,200.00 one-time
  • Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)
    Town of Glen St. Mary
    Adopted by Ord. 2013-03. New nonresidential development connecting to the Town of Glen St. Mary's water system pays $2,200.00 per ERU: a $1,200.00 per ERU water tap fee plus a $1,000.00 per ERU water system capacity fee. There is no separate residential and commercial rate. One ERU equals 150 gallons per day; a project's ERU count is estimated using industry standards and may be adjusted after one year of metered flow data. The amount shown is the one-ERU rate. A reduced $500 per ERU capacity fee applies only to connections made 91 to 365 days after initial system construction.
    $2,200.00 one-time
Sewer$2,350.00 one-time
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)
    Town of Glen St. Mary
    Adopted by Ord. 2013-03. New nonresidential development connecting to the Town of Glen St. Mary's sewer system pays $2,350.00 per ERU: a $600.00 per ERU sewer tap fee plus a $1,750.00 per ERU sewer system capacity fee applicable to all new residential and business development connections. There is no separate residential and commercial rate. One ERU equals 150 gallons per day; a project's ERU count is estimated using industry standards and may be adjusted after one year of metered flow data. The amount shown is the one-ERU rate. Sewer capacity availability is limited: under Ord. 2025-01, adopted March 18, 2025, the Town's ERU allotment under its 2003 wastewater agreement with the City of Macclenny is at capacity, and new sewer capacity is issued only case by case on a first-come basis. Capacity granted after March 18, 2025 must be connected and receive a certificate of occupancy within an 18-month development period or it is forfeited and the fee refunded without interest.
    $2,350.00 one-time
City$0.00
  • City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Commercial)
    Town of Glen St. Mary
    The Town of Glen St. Mary has an impact fee ordinance on the books (Ord. 2007-02) but does not collect impact fees. Ord. 2011-01, adopted January 18, 2011, imposes an indefinite moratorium with no sunset date: the Town collects no impact fees except as may be required by interlocal agreement with Baker County or by the State of Florida. Baker County levies no impact fees, so the interlocal exception is inoperative. Nonresidential municipal impact fees are therefore $0. The Town's only one-time development charges actually collected are its water and sewer tap and capacity fees under Ord. 2013-03.
    $0.00
County$0.00
  • County Impact Fees — none adopted (Baker County, within Glen St. Mary, Commercial)
    Baker County
    Baker County levies no impact fees of any kind, residential or nonresidential, so no county impact fee applies within the Town of Glen St. Mary. The county's adopted fee schedule contains only building permit, fire permit and certificate-of-occupancy, planning and zoning application and advertising, and technical review fees. The county has funded an impact fee study that could establish fees for the first time; nothing has been adopted.
    $0.00
Total (Glen St. Mary): $4,550.00 one-time (≈ $4,550.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Glen St. Mary Baker County

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Glen St. Mary: Industrial Impact Fees

Industrial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 50,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).

View the full Glen St. Mary impact fee schedule
Water$2,200.00 one-time
  • Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)
    Town of Glen St. Mary
    Adopted by Ord. 2013-03. New nonresidential development connecting to the Town of Glen St. Mary's water system pays $2,200.00 per ERU: a $1,200.00 per ERU water tap fee plus a $1,000.00 per ERU water system capacity fee. There is no separate residential and commercial rate. One ERU equals 150 gallons per day; a project's ERU count is estimated using industry standards and may be adjusted after one year of metered flow data. The amount shown is the one-ERU rate. A reduced $500 per ERU capacity fee applies only to connections made 91 to 365 days after initial system construction.
    $2,200.00 one-time
Sewer$2,350.00 one-time
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)
    Town of Glen St. Mary
    Adopted by Ord. 2013-03. New nonresidential development connecting to the Town of Glen St. Mary's sewer system pays $2,350.00 per ERU: a $600.00 per ERU sewer tap fee plus a $1,750.00 per ERU sewer system capacity fee applicable to all new residential and business development connections. There is no separate residential and commercial rate. One ERU equals 150 gallons per day; a project's ERU count is estimated using industry standards and may be adjusted after one year of metered flow data. The amount shown is the one-ERU rate. Sewer capacity availability is limited: under Ord. 2025-01, adopted March 18, 2025, the Town's ERU allotment under its 2003 wastewater agreement with the City of Macclenny is at capacity, and new sewer capacity is issued only case by case on a first-come basis. Capacity granted after March 18, 2025 must be connected and receive a certificate of occupancy within an 18-month development period or it is forfeited and the fee refunded without interest.
    $2,350.00 one-time
City$0.00
  • City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Industrial)
    Town of Glen St. Mary
    The Town of Glen St. Mary has an impact fee ordinance on the books (Ord. 2007-02) but does not collect impact fees. Ord. 2011-01, adopted January 18, 2011, imposes an indefinite moratorium with no sunset date: the Town collects no impact fees except as may be required by interlocal agreement with Baker County or by the State of Florida. Baker County levies no impact fees, so the interlocal exception is inoperative. Nonresidential municipal impact fees are therefore $0. The Town's only one-time development charges actually collected are its water and sewer tap and capacity fees under Ord. 2013-03.
    $0.00
County$0.00
  • County Impact Fees — none adopted (Baker County, within Glen St. Mary, Industrial)
    Baker County
    Baker County levies no impact fees of any kind, residential or nonresidential, so no county impact fee applies within the Town of Glen St. Mary. The county's adopted fee schedule contains only building permit, fire permit and certificate-of-occupancy, planning and zoning application and advertising, and technical review fees. The county has funded an impact fee study that could establish fees for the first time; nothing has been adopted.
    $0.00
Total (Glen St. Mary): $4,550.00 one-time (≈ $4,550.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Glen St. Mary Baker County

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Glen St. Mary: Office Impact Fees

Office development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 25,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).

View the full Glen St. Mary impact fee schedule
Water$2,200.00 one-time
  • Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)
    Town of Glen St. Mary
    Adopted by Ord. 2013-03. New nonresidential development connecting to the Town of Glen St. Mary's water system pays $2,200.00 per ERU: a $1,200.00 per ERU water tap fee plus a $1,000.00 per ERU water system capacity fee. There is no separate residential and commercial rate. One ERU equals 150 gallons per day; a project's ERU count is estimated using industry standards and may be adjusted after one year of metered flow data. The amount shown is the one-ERU rate. A reduced $500 per ERU capacity fee applies only to connections made 91 to 365 days after initial system construction.
    $2,200.00 one-time
Sewer$2,350.00 one-time
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)
    Town of Glen St. Mary
    Adopted by Ord. 2013-03. New nonresidential development connecting to the Town of Glen St. Mary's sewer system pays $2,350.00 per ERU: a $600.00 per ERU sewer tap fee plus a $1,750.00 per ERU sewer system capacity fee applicable to all new residential and business development connections. There is no separate residential and commercial rate. One ERU equals 150 gallons per day; a project's ERU count is estimated using industry standards and may be adjusted after one year of metered flow data. The amount shown is the one-ERU rate. Sewer capacity availability is limited: under Ord. 2025-01, adopted March 18, 2025, the Town's ERU allotment under its 2003 wastewater agreement with the City of Macclenny is at capacity, and new sewer capacity is issued only case by case on a first-come basis. Capacity granted after March 18, 2025 must be connected and receive a certificate of occupancy within an 18-month development period or it is forfeited and the fee refunded without interest.
    $2,350.00 one-time
City$0.00
  • City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Office)
    Town of Glen St. Mary
    The Town of Glen St. Mary has an impact fee ordinance on the books (Ord. 2007-02) but does not collect impact fees. Ord. 2011-01, adopted January 18, 2011, imposes an indefinite moratorium with no sunset date: the Town collects no impact fees except as may be required by interlocal agreement with Baker County or by the State of Florida. Baker County levies no impact fees, so the interlocal exception is inoperative. Nonresidential municipal impact fees are therefore $0. The Town's only one-time development charges actually collected are its water and sewer tap and capacity fees under Ord. 2013-03.
    $0.00
County$0.00
  • County Impact Fees — none adopted (Baker County, within Glen St. Mary, Office)
    Baker County
    Baker County levies no impact fees of any kind, residential or nonresidential, so no county impact fee applies within the Town of Glen St. Mary. The county's adopted fee schedule contains only building permit, fire permit and certificate-of-occupancy, planning and zoning application and advertising, and technical review fees. The county has funded an impact fee study that could establish fees for the first time; nothing has been adopted.
    $0.00
Total (Glen St. Mary): $4,550.00 one-time (≈ $4,550.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Glen St. Mary Baker County

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Glen St. Mary impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Glen St. Mary impact fee FAQs

What are the total impact fees for a single-family home in Glen St. Mary, Florida?

A new single-family home in Glen St. Mary pays $4,550.00 per unit in combined impact fees (rates sourced July 11, 2026).

How much are commercial impact fees in Glen St. Mary?

Commercial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees.

Does Glen St. Mary charge its own impact fees?

Yes. Glen St. Mary levies its own municipal impact or utility fees. Baker County does not currently add county-level impact fees inside Glen St. Mary. The schedule on this page shows every fee that applies to development in Glen St. Mary.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Baker County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.