Glen St. Mary, Florida Impact Fees

Glen St. Mary applies its own fee schedule: municipal fees plus the Baker County-levied fees that apply inside city limits. Combined, a new single-family home pays $4,550.00 per unit (rates sourced July 11, 2026). The full breakdown is below.

Glen St. Mary impact fees by project type

Glen St. Mary: Single-Family Impact Fees

A new single-family home in Glen St. Mary pays $4,550.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — tap $600/ERU + capacity $1,750/ERU ($2,350.00) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — tap $1,200/ERU + capacity $1,000/ERU ($2,200.00).

Official fee schedule

View the full fee schedule
Water$2,200.00
  • Water Tap + System Capacity Fee (Town of Glen St. Mary) — tap $1,200/ERU + capacity $1,000/ERU
    Town of Glen St. Mary
    CONFIRMED 7/11/2026 from adopted Ord. 2013-03 (rendered in browser). Correction to the prior record, which wrongly said the town had no website and likely used private wells: the Town of Glen St. Mary DOES operate its own municipal water and sewer utility. Ord. 2013-03 § 6 (TAP FEES): Water Service $1,200.00 per ERU. § 7 (WATER SYSTEM CAPACITY FEE): $1,000.00 per ERU for all new residential and business development connections, payable regardless of when the connection is made (a reduced $500 applies only to connections made 91–365 days after initial system construction; $0 within 90 days). New-development SFR total = $1,200 + $1,000 = $2,200/ERU. Reviewed the town's full ordinance index 2012–2025: no later ordinance amends the tap or capacity fees, so Ord. 2013-03 remains operative. Town Hall (904) 259-3777.
    $2,200.00
Sewer$2,350.00
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — tap $600/ERU + capacity $1,750/ERU
    Town of Glen St. Mary
    CONFIRMED 7/11/2026 from adopted Ord. 2013-03 (rendered in browser). The town operates its own municipal sewer system (prior record wrongly assumed septic). Ord. 2013-03 § 6 (TAP FEES): Sewer Service $600.00 per ERU. § 8 (SEWER SYSTEM CAPACITY FEE): $1,750.00 per ERU for all NEW residential and business DEVELOPMENT connections (a $750/ERU capacity fee applies to ordinary connections generally). New-development SFR total = $600 + $1,750 = $2,350/ERU. ⚠️ MATERIAL: Ord. 2025-01 (adopted 3/18/2025) imposes an INTERIM MORATORIUM — the Town will NOT issue capacity for new sewer ERUs except case-by-case on a first-come basis, because its ERU allotment under the 2003 Wastewater Agreement with the City of Macclenny is at capacity. New ERU capacity granted after 3/18/2025 must connect + obtain a CO within an 18-month Development Period or the capacity is forfeited and the fee refunded without interest. Confirm availability before relying on this fee: Town Hall (904) 259-3777.
    $2,350.00
City$0.00
  • City Impact Fees (Town of Glen St. Mary)
    Town of Glen St. Mary
    $0 CONFIRMED 7/11/2026 — no municipal (non-utility) impact fees. Reviewed the town's complete ordinance index (2012–2025) in-browser: rezonings, comprehensive plan, sewer-use/discharge, backflow, code enforcement, election signs, FP&L franchise, cannabis moratorium, public nuisance — no impact-fee or development-fee ordinance of any kind. The town's only one-time development charges are the water/sewer tap + capacity fees (Ord. 2013-03). Baker County also levies no impact fees.
    $0.00
County$0.00
  • County Impact Fees (Baker County, within Glen St. Mary)
    Baker County
    $0 — Baker County has NO impact fee program. Re-verified 7/11/2026 from the county Community Development page (permit + P&Z application fees only). No county fees apply within the Town of Glen St. Mary.
    $0.00
Total (Glen St. Mary): $4,550.00
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Glen St. Mary: Multifamily Impact Fees

A new multifamily unit in Glen St. Mary pays $4,550.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.

Sewer Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $600/ERU + capacity $1,750/ERU and Water Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $1,200/ERU + capacity $1,000/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Official fee schedule

View the full fee schedule
Water$2,200.00
  • Water Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $1,200/ERU + capacity $1,000/ERU
    Town of Glen St. Mary
    Amounts CONFIRMED 7/11/2026 from adopted Ord. 2013-03 (rendered in browser); the town DOES operate its own water utility (prior record wrongly said private wells). § 6 TAP FEES: Water $1,200.00/ERU. § 7 WATER SYSTEM CAPACITY FEE: $1,000.00/ERU for all new residential and business development connections. New-development total = $2,200/ERU. Entered at 1 ERU per dwelling unit. ⚠️ Still Unconfirmed: the ordinance charges per ERU but does not publish an ERU-equivalency table for apartments, so the per-unit MF factor (assumed 1.0) needs confirmation — Town Hall (904) 259-3777. No later ordinance (index reviewed 2012–2025) amends these fees.
    $2,200.00Requires confirmation
Sewer$2,350.00
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $600/ERU + capacity $1,750/ERU
    Town of Glen St. Mary
    Amounts CONFIRMED 7/11/2026 from adopted Ord. 2013-03 (rendered in browser); the town operates its own sewer system (prior record wrongly assumed septic). § 6 TAP FEES: Sewer $600.00/ERU. § 8 SEWER SYSTEM CAPACITY FEE: $1,750.00/ERU for NEW residential/business DEVELOPMENT connections ($750/ERU for ordinary connections). New-development total = $2,350/ERU, entered at 1 ERU per dwelling unit. ⚠️ MATERIAL: Ord. 2025-01 (adopted 3/18/2025) imposes an INTERIM MORATORIUM — the Town will NOT issue new sewer ERU capacity except case-by-case, first-come, because its ERU allotment under the 2003 Wastewater Agreement with Macclenny is exhausted. This bites hardest on MF, which needs many ERUs at once. Capacity granted after 3/18/2025 forfeits if not connected + CO'd within 18 months (fee refunded without interest). Still Unconfirmed: MF per-unit ERU factor (assumed 1.0) — Town Hall (904) 259-3777.
    $2,350.00Requires confirmation
City$0.00
  • City Impact Fees (Town of Glen St. Mary, MF)
    Town of Glen St. Mary
    $0 CONFIRMED 7/11/2026 — no municipal (non-utility) impact fees. Reviewed the town's complete ordinance index (2012–2025) in-browser: no impact-fee or development-fee ordinance of any kind. The town's only one-time development charges are the water/sewer tap + capacity fees (Ord. 2013-03). Baker County also levies no impact fees.
    $0.00
County$0.00
Total (Glen St. Mary): $4,550.00
Sources last checked July 11, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Glen St. Mary: Commercial Impact Fees

Commercial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 50,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).

Official fee schedule

View the full fee schedule
Water$2,200.00 one-time
  • Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)
    Town of Glen St. Mary
    CONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal water utility. § 6 TAP FEES — Water Service $1,200.00 per ERU (single rate; no residential/commercial split). § 7 WATER SYSTEM CAPACITY FEE — $1,000.00 per ERU 'for all new residential and BUSINESS development connections... regardless of when the connection is made' (a reduced $500 applies only to connections made 91–365 days after initial system construction; $0 within 90 days). New nonres development = $1,200 + $1,000 = $2,200 per ERU. Full ordinance index 2012–2025 reviewed: no later ordinance amends these fees. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Water Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' So nonres ERU count = projected flow ÷ 150 gpd, industry-standard estimate, trued up after 12 months of metered flow. No fixture table and no 1.0-ERU floor is published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (that sheet's other figures are recurring monthly rates, not impact fees). Town Hall (904) 259-3777.
    $2,200.00 one-time
Sewer$2,350.00 one-time
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)
    Town of Glen St. Mary
    CONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal sewer system. § 6 TAP FEES — Sewer Service $600.00 per ERU (single rate; no residential/commercial split). § 8 SEWER SYSTEM CAPACITY FEE — $1,750.00 per ERU 'for all new residential and BUSINESS development connections' ($750/ERU applies to ordinary residential/business connections generally). New nonres development = $600 + $1,750 = $2,350 per ERU. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Sewer Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' Nonres ERU count = projected flow ÷ 150 gpd, trued up after 12 months of metered flow. No fixture table, no 1.0-ERU floor published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (its other figures are recurring monthly rates, not impact fees). ⚠ CAPACITY-AVAILABILITY CAVEAT (fee is certain; availability is not): Ord. 2025-01 (adopted 3/18/2025) imposes an INTERIM MORATORIUM — the Town will not issue capacity for new sewer ERUs except case-by-case on a first-come basis, its ERU allotment under the 2003 Wastewater Agreement with the City of Macclenny being at capacity. Capacity granted after 3/18/2025 must connect and obtain a CO within an 18-month Development Period or it is forfeited and the fee refunded without interest. Confirm availability before relying on a connection: Town Hall (904) 259-3777.
    $2,350.00 one-time
City$0.00
  • City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Commercial)
    Town of Glen St. Mary
    $0 CONFIRMED 7/12/2026 (audit — CORRECTS the 7/11/2026 note, which wrongly stated the Town has no impact-fee ordinance of any kind; that pass reviewed only the 2012–2025 slice of the ordinance index). The Town DOES have one: Ord. 2007-02, the 'Town of Glen St. Mary Impact Fee Ordinance' (14 pp.), establishing impact fees to fund capital improvements attributable to new land development. It is NOT collected. Ord. 2011-01 (adopted 1/18/2011, effective upon becoming law; read via Google Docs viewer) imposes an INTERIM MORATORIUM — Sec. 1: 'The Town of Glen St. Mary shall collect no impact fees except as may be required by interlocal agreement with Baker County, Florida, or by the State of Florida... continuing until such time as further ordained by the Town Council.' Indefinite — no sunset date. It superseded the earlier moratorium, Ord. 2009-03. The Town's complete ordinance index (through 2025; re-reviewed in-browser 7/12/2026) contains NO ordinance repealing or amending 2011-01. The interlocal carve-out is also inoperative: Baker County levies no impact fees at all. Therefore nonresidential municipal impact fees = $0 as of 7/12/2026 — a documented $0 for a fee that is on the books but legally uncollectible. The Town's only one-time development charges actually collected are the Ord. 2013-03 water/sewer tap + capacity fees (Water/Sewer table). RECHECK EACH CYCLE: the moratorium is liftable by a single ordinance, which would reactivate the 2007-02 fee schedule. Town Hall (904) 259-3777.
    $0.00
County$0.00
  • County Impact Fees — none adopted (Baker County, within Glen St. Mary, Commercial)
    Baker County
    $0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind, so no county overlay fee applies within the Town of Glen St. Mary. Complete posted county fee schedule = building permit fees, fire permit/CO fees, P&Z application + advertising fees, technical review fees only. A $100,000 Stantec impact-fee study was budgeted and considered 10/21/2025; nothing adopted as of 7/11/2026. Baker County Community Development 904-259-2403.
    $0.00
Total (Glen St. Mary): $4,550.00 one-time (≈ $4,550.00 at 50,000 sq ft)
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Glen St. Mary: Industrial Impact Fees

Industrial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 50,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).

Official fee schedule

View the full fee schedule
Water$2,200.00 one-time
  • Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)
    Town of Glen St. Mary
    CONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal water utility. § 6 TAP FEES — Water Service $1,200.00 per ERU (single rate; no residential/commercial split). § 7 WATER SYSTEM CAPACITY FEE — $1,000.00 per ERU 'for all new residential and BUSINESS development connections... regardless of when the connection is made' (a reduced $500 applies only to connections made 91–365 days after initial system construction; $0 within 90 days). New nonres development = $1,200 + $1,000 = $2,200 per ERU. Full ordinance index 2012–2025 reviewed: no later ordinance amends these fees. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Water Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' So nonres ERU count = projected flow ÷ 150 gpd, industry-standard estimate, trued up after 12 months of metered flow. No fixture table and no 1.0-ERU floor is published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (that sheet's other figures are recurring monthly rates, not impact fees). Town Hall (904) 259-3777.
    $2,200.00 one-time
Sewer$2,350.00 one-time
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)
    Town of Glen St. Mary
    CONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal sewer system. § 6 TAP FEES — Sewer Service $600.00 per ERU (single rate; no residential/commercial split). § 8 SEWER SYSTEM CAPACITY FEE — $1,750.00 per ERU 'for all new residential and BUSINESS development connections' ($750/ERU applies to ordinary residential/business connections generally). New nonres development = $600 + $1,750 = $2,350 per ERU. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Sewer Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' Nonres ERU count = projected flow ÷ 150 gpd, trued up after 12 months of metered flow. No fixture table, no 1.0-ERU floor published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (its other figures are recurring monthly rates, not impact fees). ⚠ CAPACITY-AVAILABILITY CAVEAT (fee is certain; availability is not): Ord. 2025-01 (adopted 3/18/2025) imposes an INTERIM MORATORIUM — the Town will not issue capacity for new sewer ERUs except case-by-case on a first-come basis, its ERU allotment under the 2003 Wastewater Agreement with the City of Macclenny being at capacity. Capacity granted after 3/18/2025 must connect and obtain a CO within an 18-month Development Period or it is forfeited and the fee refunded without interest. Confirm availability before relying on a connection: Town Hall (904) 259-3777.
    $2,350.00 one-time
City$0.00
  • City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Industrial)
    Town of Glen St. Mary
    $0 CONFIRMED 7/12/2026 (audit — CORRECTS the 7/11/2026 note, which wrongly stated the Town has no impact-fee ordinance of any kind). The Town DOES have one: Ord. 2007-02, the 'Town of Glen St. Mary Impact Fee Ordinance' (14 pp.), establishing impact fees on new land development. It is NOT collected. Ord. 2011-01 (adopted 1/18/2011) imposes an INTERIM MORATORIUM — Sec. 1: 'The Town of Glen St. Mary shall collect no impact fees except as may be required by interlocal agreement with Baker County, Florida, or by the State of Florida... continuing until such time as further ordained by the Town Council.' Indefinite, no sunset; superseded the earlier moratorium Ord. 2009-03. The Town's complete ordinance index (through 2025; re-reviewed 7/12/2026) contains no ordinance repealing or amending 2011-01, and Baker County levies no impact fees, so the interlocal carve-out is inoperative. Nonres municipal impact fees = $0 as of 7/12/2026. Only one-time charges actually collected are the Ord. 2013-03 water/sewer tap + capacity fees (Water/Sewer table). RECHECK EACH CYCLE — the moratorium is liftable by a single ordinance. Town Hall (904) 259-3777.
    $0.00
County$0.00
Total (Glen St. Mary): $4,550.00 one-time (≈ $4,550.00 at 50,000 sq ft)
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Glen St. Mary: Office Impact Fees

Office development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 25,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).

Official fee schedule

View the full fee schedule
Water$2,200.00 one-time
  • Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)
    Town of Glen St. Mary
    CONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal water utility. § 6 TAP FEES — Water Service $1,200.00 per ERU (single rate; no residential/commercial split). § 7 WATER SYSTEM CAPACITY FEE — $1,000.00 per ERU 'for all new residential and BUSINESS development connections... regardless of when the connection is made' (a reduced $500 applies only to connections made 91–365 days after initial system construction; $0 within 90 days). New nonres development = $1,200 + $1,000 = $2,200 per ERU. Full ordinance index 2012–2025 reviewed: no later ordinance amends these fees. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Water Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' So nonres ERU count = projected flow ÷ 150 gpd, industry-standard estimate, trued up after 12 months of metered flow. No fixture table and no 1.0-ERU floor is published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (that sheet's other figures are recurring monthly rates, not impact fees). Town Hall (904) 259-3777.
    $2,200.00 one-time
Sewer$2,350.00 one-time
  • Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)
    Town of Glen St. Mary
    CONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal sewer system. § 6 TAP FEES — Sewer Service $600.00 per ERU (single rate; no residential/commercial split). § 8 SEWER SYSTEM CAPACITY FEE — $1,750.00 per ERU 'for all new residential and BUSINESS development connections' ($750/ERU applies to ordinary residential/business connections generally). New nonres development = $600 + $1,750 = $2,350 per ERU. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Sewer Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' Nonres ERU count = projected flow ÷ 150 gpd, trued up after 12 months of metered flow. No fixture table, no 1.0-ERU floor published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (its other figures are recurring monthly rates, not impact fees). ⚠ CAPACITY-AVAILABILITY CAVEAT (fee is certain; availability is not): Ord. 2025-01 (adopted 3/18/2025) imposes an INTERIM MORATORIUM — the Town will not issue capacity for new sewer ERUs except case-by-case on a first-come basis, its ERU allotment under the 2003 Wastewater Agreement with the City of Macclenny being at capacity. Capacity granted after 3/18/2025 must connect and obtain a CO within an 18-month Development Period or it is forfeited and the fee refunded without interest. Confirm availability before relying on a connection: Town Hall (904) 259-3777.
    $2,350.00 one-time
City$0.00
  • City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Office)
    Town of Glen St. Mary
    $0 CONFIRMED 7/12/2026 (audit — CORRECTS the 7/11/2026 note, which wrongly stated the Town has no impact-fee ordinance of any kind). The Town DOES have one: Ord. 2007-02, the 'Town of Glen St. Mary Impact Fee Ordinance' (14 pp.), establishing impact fees on new land development. It is NOT collected. Ord. 2011-01 (adopted 1/18/2011) imposes an INTERIM MORATORIUM — Sec. 1: 'The Town of Glen St. Mary shall collect no impact fees except as may be required by interlocal agreement with Baker County, Florida, or by the State of Florida... continuing until such time as further ordained by the Town Council.' Indefinite, no sunset; superseded the earlier moratorium Ord. 2009-03. The Town's complete ordinance index (through 2025; re-reviewed 7/12/2026) contains no ordinance repealing or amending 2011-01, and Baker County levies no impact fees, so the interlocal carve-out is inoperative. Nonres municipal impact fees = $0 as of 7/12/2026. Only one-time charges actually collected are the Ord. 2013-03 water/sewer tap + capacity fees (Water/Sewer table). RECHECK EACH CYCLE — the moratorium is liftable by a single ordinance. Town Hall (904) 259-3777.
    $0.00
County$0.00
Total (Glen St. Mary): $4,550.00 one-time (≈ $4,550.00 at 25,000 sq ft)
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Glen St. Mary

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Glen St. Mary, Florida?

A new single-family home in Glen St. Mary pays $4,550.00 per unit in combined impact fees (rates sourced July 11, 2026).

How much are commercial impact fees in Glen St. Mary?

Commercial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees.

Does Glen St. Mary charge its own impact fees?

Yes. Glen St. Mary levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Glen St. Mary, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Baker County impact fees page.