Glen St. Mary impact fees by project type
Glen St. Mary: Single-Family Impact Fees
A new single-family home in Glen St. Mary pays $4,550.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — tap $600/ERU + capacity $1,750/ERU ($2,350.00) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — tap $1,200/ERU + capacity $1,000/ERU ($2,200.00).
View the full fee schedule
- Water Tap + System Capacity Fee (Town of Glen St. Mary) — tap $1,200/ERU + capacity $1,000/ERU$2,200.00Town of Glen St. MaryTown of Glen St. Mary water charges for a new development connection total $2,200.00 per ERU: a $1,200.00 tap fee (Ord. 2013-03 Sec. 6) plus a $1,000.00 water system capacity fee (Sec. 7). The reduced $500.00 and $0.00 capacity tiers in Sec. 7 apply only to connections made within 365 days and 90 days respectively of initial system construction, so they do not reach new development. Adopted Nov. 19, 2013; Sec. 10 permits modification by rate resolution, and the ordinance index 2012-2025 shows no later amendment and no posted resolution. Sec. 23 requires a separate connection and meter per dwelling unit, fixing the per-unit basis at 1.0 ERU. The Town operates its own municipal water and sewer utility.
- Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — tap $600/ERU + capacity $1,750/ERU$2,350.00Town of Glen St. MaryTown of Glen St. Mary sewer charges for a new development connection total $2,350.00 per ERU: a $600.00 tap fee (Ord. 2013-03 Sec. 6) plus a $1,750.00 sewer system capacity fee for new residential and business development connections (Sec. 8). Ordinary non-development connections pay $750.00. Adopted Nov. 19, 2013; Sec. 10 permits the Town Council to modify the rates by resolution, and none is posted. Sec. 23 requires a separate connection and meter per dwelling unit, fixing the per-unit basis at 1.0 ERU. Ord. 2025-01 (adopted Mar. 18, 2025) imposes an interim moratorium: the Town will not issue capacity for new sewer ERUs except case by case on a first-come basis, running indefinitely until the Town Council ordains otherwise, because the Town's discharge allotment under its Jan. 21, 2003 wastewater interlocal with the City of Macclenny is at capacity. Capacity granted after Mar. 18, 2025 is parcel- and unit-specific, non-transferable without Town consent, and forfeited (fee refunded without interest) unless the parcel connects and obtains a certificate of occupancy within an 18-month development period. Applies within the incorporated town only.
- City Impact Fees (Town of Glen St. Mary)$0.00Town of Glen St. Mary$0 confirmed — no municipal (non-utility) impact fees. The Town's ordinance index 2012-2025 contains no impact-fee or development-fee ordinance of any kind, and nothing newer than Ord. 2025-01. The Town adopted an impact fee under Ord. 2007-02 but placed it under moratorium (Ord. 2009-03, Ord. 2011-01). The Town's only one-time development charges are the water and sewer tap and capacity fees under Ord. 2013-03. Baker County levies no impact fees either.
- County Impact Fees (Baker County, within Glen St. Mary)$0.00Baker County$0 confirmed. Baker County operates no impact fee program of any kind, countywide or in the unincorporated area. The county's published development charges are limited to building permit fees and Planning & Zoning application, advertising and technical review fees. No county fee applies within the Town of Glen St. Mary.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Glen St. Mary: Multifamily Impact Fees
A new multifamily unit in Glen St. Mary pays $4,550.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $600/ERU + capacity $1,750/ERU ($2,350.00) and Water Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $1,200/ERU + capacity $1,000/ERU ($2,200.00).
View the full fee schedule
- Water Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $1,200/ERU + capacity $1,000/ERU$2,200.00Town of Glen St. MaryTown of Glen St. Mary water charges for a new development connection total $2,200.00 per ERU: a $1,200.00 tap fee (Ord. 2013-03 Sec. 6) plus a $1,000.00 water system capacity fee (Sec. 7). The reduced $500.00 and $0.00 tiers apply only to connections made within 365 and 90 days of initial system construction and do not reach new development. Sec. 23 requires each unit to be treated separately with its own connection and meter, so every apartment carries a full 1.0 ERU and the MF per-unit amount equals SFR by design; no reduced multifamily ERU factor exists. Adopted Nov. 19, 2013; Sec. 10 permits modification by resolution, and the ordinance index 2012-2025 shows no later amendment.
- Sewer Tap + System Capacity Fee (Town of Glen St. Mary, MF) — tap $600/ERU + capacity $1,750/ERU$2,350.00Town of Glen St. MaryTown of Glen St. Mary sewer charges for a new development connection total $2,350.00 per ERU: a $600.00 tap fee (Ord. 2013-03 Sec. 6) plus a $1,750.00 sewer system capacity fee for new development connections (Sec. 8); ordinary connections pay $750.00. Sec. 23 requires each unit to be treated separately with its own connection and meter, so every apartment carries a full 1.0 ERU and the MF per-unit amount equals SFR by design; no reduced multifamily ERU factor exists. Ord. 2025-01 (adopted Mar. 18, 2025) imposes an interim moratorium: the Town will not issue capacity for new ERUs except case by case on a first-come basis, running indefinitely until the Town Council ordains otherwise, because outstanding issued ERUs have reached the Town's discharge allotment under the Jan. 21, 2003 wastewater interlocal with the City of Macclenny. This bites hardest on multifamily, which needs many ERUs released at once. Capacity granted after Mar. 18, 2025 is parcel- and unit-specific, non-transferable without Town consent, and forfeited (fee refunded without interest) unless the parcel connects and obtains a CO within an 18-month development period. Applies within the incorporated town only.
- City Impact Fees (Town of Glen St. Mary, MF)$0.00Town of Glen St. Mary$0 confirmed — no municipal (non-utility) impact fees. The Town's ordinance index 2012-2025 contains no impact-fee or development-fee ordinance of any kind, and nothing newer than Ord. 2025-01. The Town adopted an impact fee under Ord. 2007-02 but placed it under moratorium (Ord. 2009-03, Ord. 2011-01). The Town's only one-time development charges are the water and sewer tap and capacity fees under Ord. 2013-03. Baker County levies no impact fees either.
- County Impact Fees (Baker County, within Glen St. Mary, MF)$0.00Baker County$0 confirmed. Baker County operates no impact fee program of any kind. The county Community Development schedule is building permit plus Planning & Zoning application, advertising and technical review fees only, with no multifamily column. No county fee applies within the Town of Glen St. Mary.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Glen St. Mary: Commercial Impact Fees
Commercial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 50,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).
View the full fee schedule
- Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)$2,200.00 one-timeTown of Glen St. MaryCONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal water utility. § 6 TAP FEES — Water Service $1,200.00 per ERU (single rate; no residential/commercial split). § 7 WATER SYSTEM CAPACITY FEE — $1,000.00 per ERU 'for all new residential and BUSINESS development connections... regardless of when the connection is made' (a reduced $500 applies only to connections made 91–365 days after initial system construction; $0 within 90 days). New nonres development = $1,200 + $1,000 = $2,200 per ERU. Full ordinance index 2012–2025 reviewed: no later ordinance amends these fees. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Water Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' So nonres ERU count = projected flow ÷ 150 gpd, industry-standard estimate, trued up after 12 months of metered flow. No fixture table and no 1.0-ERU floor is published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (that sheet's other figures are recurring monthly rates, not impact fees). Town Hall (904) 259-3777.
- Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)$2,350.00 one-timeTown of Glen St. MaryCONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal sewer system. § 6 TAP FEES — Sewer Service $600.00 per ERU (single rate; no residential/commercial split). § 8 SEWER SYSTEM CAPACITY FEE — $1,750.00 per ERU 'for all new residential and BUSINESS development connections' ($750/ERU applies to ordinary residential/business connections generally). New nonres development = $600 + $1,750 = $2,350 per ERU. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Sewer Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' Nonres ERU count = projected flow ÷ 150 gpd, trued up after 12 months of metered flow. No fixture table, no 1.0-ERU floor published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (its other figures are recurring monthly rates, not impact fees). ⚠ CAPACITY-AVAILABILITY CAVEAT (fee is certain; availability is not): Ord. 2025-01 (adopted 3/18/2025) imposes an INTERIM MORATORIUM — the Town will not issue capacity for new sewer ERUs except case-by-case on a first-come basis, its ERU allotment under the 2003 Wastewater Agreement with the City of Macclenny being at capacity. Capacity granted after 3/18/2025 must connect and obtain a CO within an 18-month Development Period or it is forfeited and the fee refunded without interest. Confirm availability before relying on a connection: Town Hall (904) 259-3777.
- City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Commercial)$0.00Town of Glen St. Mary$0 CONFIRMED 7/12/2026 (audit — CORRECTS the 7/11/2026 note, which wrongly stated the Town has no impact-fee ordinance of any kind; that pass reviewed only the 2012–2025 slice of the ordinance index). The Town DOES have one: Ord. 2007-02, the 'Town of Glen St. Mary Impact Fee Ordinance' (14 pp.), establishing impact fees to fund capital improvements attributable to new land development. It is NOT collected. Ord. 2011-01 (adopted 1/18/2011, effective upon becoming law; read via Google Docs viewer) imposes an INTERIM MORATORIUM — Sec. 1: 'The Town of Glen St. Mary shall collect no impact fees except as may be required by interlocal agreement with Baker County, Florida, or by the State of Florida... continuing until such time as further ordained by the Town Council.' Indefinite — no sunset date. It superseded the earlier moratorium, Ord. 2009-03. The Town's complete ordinance index (through 2025; re-reviewed in-browser 7/12/2026) contains NO ordinance repealing or amending 2011-01. The interlocal carve-out is also inoperative: Baker County levies no impact fees at all. Therefore nonresidential municipal impact fees = $0 as of 7/12/2026 — a documented $0 for a fee that is on the books but legally uncollectible. The Town's only one-time development charges actually collected are the Ord. 2013-03 water/sewer tap + capacity fees (Water/Sewer table). RECHECK EACH CYCLE: the moratorium is liftable by a single ordinance, which would reactivate the 2007-02 fee schedule. Town Hall (904) 259-3777.
- County Impact Fees — none adopted (Baker County, within Glen St. Mary, Commercial)$0.00Baker County$0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind, so no county overlay fee applies within the Town of Glen St. Mary. Complete posted county fee schedule = building permit fees, fire permit/CO fees, P&Z application + advertising fees, technical review fees only. A $100,000 Stantec impact-fee study was budgeted and considered 10/21/2025; nothing adopted as of 7/11/2026. Baker County Community Development 904-259-2403.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Glen St. Mary: Industrial Impact Fees
Industrial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 50,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).
View the full fee schedule
- Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)$2,200.00 one-timeTown of Glen St. MaryCONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal water utility. § 6 TAP FEES — Water Service $1,200.00 per ERU (single rate; no residential/commercial split). § 7 WATER SYSTEM CAPACITY FEE — $1,000.00 per ERU 'for all new residential and BUSINESS development connections... regardless of when the connection is made' (a reduced $500 applies only to connections made 91–365 days after initial system construction; $0 within 90 days). New nonres development = $1,200 + $1,000 = $2,200 per ERU. Full ordinance index 2012–2025 reviewed: no later ordinance amends these fees. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Water Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' So nonres ERU count = projected flow ÷ 150 gpd, industry-standard estimate, trued up after 12 months of metered flow. No fixture table and no 1.0-ERU floor is published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (that sheet's other figures are recurring monthly rates, not impact fees). Town Hall (904) 259-3777.
- Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)$2,350.00 one-timeTown of Glen St. MaryCONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal sewer system. § 6 TAP FEES — Sewer Service $600.00 per ERU (single rate; no residential/commercial split). § 8 SEWER SYSTEM CAPACITY FEE — $1,750.00 per ERU 'for all new residential and BUSINESS development connections' ($750/ERU applies to ordinary residential/business connections generally). New nonres development = $600 + $1,750 = $2,350 per ERU. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Sewer Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' Nonres ERU count = projected flow ÷ 150 gpd, trued up after 12 months of metered flow. No fixture table, no 1.0-ERU floor published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (its other figures are recurring monthly rates, not impact fees). ⚠ CAPACITY-AVAILABILITY CAVEAT (fee is certain; availability is not): Ord. 2025-01 (adopted 3/18/2025) imposes an INTERIM MORATORIUM — the Town will not issue capacity for new sewer ERUs except case-by-case on a first-come basis, its ERU allotment under the 2003 Wastewater Agreement with the City of Macclenny being at capacity. Capacity granted after 3/18/2025 must connect and obtain a CO within an 18-month Development Period or it is forfeited and the fee refunded without interest. Confirm availability before relying on a connection: Town Hall (904) 259-3777.
- City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Industrial)$0.00Town of Glen St. Mary$0 CONFIRMED 7/12/2026 (audit — CORRECTS the 7/11/2026 note, which wrongly stated the Town has no impact-fee ordinance of any kind). The Town DOES have one: Ord. 2007-02, the 'Town of Glen St. Mary Impact Fee Ordinance' (14 pp.), establishing impact fees on new land development. It is NOT collected. Ord. 2011-01 (adopted 1/18/2011) imposes an INTERIM MORATORIUM — Sec. 1: 'The Town of Glen St. Mary shall collect no impact fees except as may be required by interlocal agreement with Baker County, Florida, or by the State of Florida... continuing until such time as further ordained by the Town Council.' Indefinite, no sunset; superseded the earlier moratorium Ord. 2009-03. The Town's complete ordinance index (through 2025; re-reviewed 7/12/2026) contains no ordinance repealing or amending 2011-01, and Baker County levies no impact fees, so the interlocal carve-out is inoperative. Nonres municipal impact fees = $0 as of 7/12/2026. Only one-time charges actually collected are the Ord. 2013-03 water/sewer tap + capacity fees (Water/Sewer table). RECHECK EACH CYCLE — the moratorium is liftable by a single ordinance. Town Hall (904) 259-3777.
- County Impact Fees — none adopted (Baker County, within Glen St. Mary, Industrial)$0.00Baker County$0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind; no county overlay fee applies within Glen St. Mary. A $100,000 Stantec impact-fee study was budgeted and considered 10/21/2025; nothing adopted as of 7/11/2026. Baker County Community Development 904-259-2403.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Glen St. Mary: Office Impact Fees
Office development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 25,000 sq ft building, that comes to about $4,550.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity) ($2,350.00 one-time) and Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity) ($2,200.00 one-time).
View the full fee schedule
- Water Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($1,200 tap + $1,000 capacity)$2,200.00 one-timeTown of Glen St. MaryCONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal water utility. § 6 TAP FEES — Water Service $1,200.00 per ERU (single rate; no residential/commercial split). § 7 WATER SYSTEM CAPACITY FEE — $1,000.00 per ERU 'for all new residential and BUSINESS development connections... regardless of when the connection is made' (a reduced $500 applies only to connections made 91–365 days after initial system construction; $0 within 90 days). New nonres development = $1,200 + $1,000 = $2,200 per ERU. Full ordinance index 2012–2025 reviewed: no later ordinance amends these fees. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Water Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' So nonres ERU count = projected flow ÷ 150 gpd, industry-standard estimate, trued up after 12 months of metered flow. No fixture table and no 1.0-ERU floor is published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (that sheet's other figures are recurring monthly rates, not impact fees). Town Hall (904) 259-3777.
- Sewer Tap + System Capacity Fee (Town of Glen St. Mary) — 1 ERU × ($600 tap + $1,750 capacity)$2,350.00 one-timeTown of Glen St. MaryCONFIRMED 7/11/2026 (audit) — rates AND nonres ERU basis now both sourced. RATES: adopted Ord. 2013-03 (8 pages read via Google Docs viewer). Town operates its own municipal sewer system. § 6 TAP FEES — Sewer Service $600.00 per ERU (single rate; no residential/commercial split). § 8 SEWER SYSTEM CAPACITY FEE — $1,750.00 per ERU 'for all new residential and BUSINESS development connections' ($750/ERU applies to ordinary residential/business connections generally). New nonres development = $600 + $1,750 = $2,350 per ERU. ERU BASIS (resolved at audit 7/11/2026): the Town's posted 'Non-Residential Sewer Information Sheet' (Utilities page, Approved Water/Sewer Rates (Commercial)) states: 'One Equivalent Residential Unit (ERU) is equivalent to 150 gallons per day. Your ERU's will be based on industry standards and may be subject to adjustment after one (1) year's flow data.' Nonres ERU count = projected flow ÷ 150 gpd, trued up after 12 months of metered flow. No fixture table, no 1.0-ERU floor published — AMOUNT STORED = the published 1-ERU rate. Rate-sheet source: https://glenstmary.govoffice.com/vertical/sites/%7B1DA4E9E6-1C0B-4AB5-8EC2-421567FEED60%7D/uploads/Nonresidential_WaterSewer_Rates_(rev).pdf (its other figures are recurring monthly rates, not impact fees). ⚠ CAPACITY-AVAILABILITY CAVEAT (fee is certain; availability is not): Ord. 2025-01 (adopted 3/18/2025) imposes an INTERIM MORATORIUM — the Town will not issue capacity for new sewer ERUs except case-by-case on a first-come basis, its ERU allotment under the 2003 Wastewater Agreement with the City of Macclenny being at capacity. Capacity granted after 3/18/2025 must connect and obtain a CO within an 18-month Development Period or it is forfeited and the fee refunded without interest. Confirm availability before relying on a connection: Town Hall (904) 259-3777.
- City Impact Fees — adopted but suspended by moratorium (Town of Glen St. Mary, Office)$0.00Town of Glen St. Mary$0 CONFIRMED 7/12/2026 (audit — CORRECTS the 7/11/2026 note, which wrongly stated the Town has no impact-fee ordinance of any kind). The Town DOES have one: Ord. 2007-02, the 'Town of Glen St. Mary Impact Fee Ordinance' (14 pp.), establishing impact fees on new land development. It is NOT collected. Ord. 2011-01 (adopted 1/18/2011) imposes an INTERIM MORATORIUM — Sec. 1: 'The Town of Glen St. Mary shall collect no impact fees except as may be required by interlocal agreement with Baker County, Florida, or by the State of Florida... continuing until such time as further ordained by the Town Council.' Indefinite, no sunset; superseded the earlier moratorium Ord. 2009-03. The Town's complete ordinance index (through 2025; re-reviewed 7/12/2026) contains no ordinance repealing or amending 2011-01, and Baker County levies no impact fees, so the interlocal carve-out is inoperative. Nonres municipal impact fees = $0 as of 7/12/2026. Only one-time charges actually collected are the Ord. 2013-03 water/sewer tap + capacity fees (Water/Sewer table). RECHECK EACH CYCLE — the moratorium is liftable by a single ordinance. Town Hall (904) 259-3777.
- County Impact Fees — none adopted (Baker County, within Glen St. Mary, Office)$0.00Baker County$0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind; no county overlay fee applies within Glen St. Mary. A $100,000 Stantec impact-fee study was budgeted and considered 10/21/2025; nothing adopted as of 7/11/2026. Baker County Community Development 904-259-2403.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Estimate your project in Glen St. Mary
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Glen St. Mary, Florida?
A new single-family home in Glen St. Mary pays $4,550.00 per unit in combined impact fees (rates sourced July 11, 2026).
How much are commercial impact fees in Glen St. Mary?
Commercial development in Glen St. Mary pays no per-square-foot impact fees, but owes $4,550.00 in one-time water and sewer connection fees.
Does Glen St. Mary charge its own impact fees?
Yes. Glen St. Mary levies its own municipal impact or utility fees. Baker County does not currently add county-level impact fees inside Glen St. Mary. The schedule on this page shows every fee that applies to development in Glen St. Mary.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Baker County impact fees page.