Macclenny applies its own fee schedule: municipal fees plus the Baker County-levied fees that apply inside city limits. Combined, a new single-family home pays $1,367.00 per unit (rates sourced July 11, 2026). The full breakdown is below.

Macclenny impact fees by project type

Macclenny: Single-Family Impact Fees

A new single-family home in Macclenny pays $1,367.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $1,213.00/ERU ($1,213.00) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $154.00/ERU ($154.00).

Official fee schedule

View the full fee schedule
Water$154.00
  • Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $154.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, rendered in browser). Sec. 21-253(d)(1): Water system capacity impact fee = $154.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018; still the operative section (no later amendment in the code). SFR = 1.0 ERU (Table I). Water+sewer combined = $1,367.00/ERU. Physical water/sewer CONNECTION charges are separate and additional (Sec. 21-252(d), Sec. 21-27). Due in full before the building permit issues (Sec. 21-253(e)).
    $154.00
Sewer$1,213.00
  • Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $1,213.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, rendered in browser). Sec. 21-253(d)(2): Sewer system capacity impact fee = $1,213.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018; still the operative section (no later amendment in the code). SFR = 1.0 ERU (Table I). Water+sewer combined = $1,367.00/ERU. Physical connection charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues (Sec. 21-253(e)).
    $1,213.00
City$0.00
  • City Impact Fees (City of Macclenny)
    City of Macclenny
    $0 — no city non-utility impact fees. Re-verified 7/11/2026 against the city's Building Department page on its current domain (macclenny.webpropsites.com; cityofmacclenny.com is being retired): permitting, plan review and inspection fees only. The city's only development charges are the Sec. 21-253 water/sewer system capacity impact fees. Baker County also levies no impact fees.
    $0.00
County$0.00
  • County Impact Fees (Baker County, within Macclenny)
    Baker County
    $0 — Baker County has NO impact fee program of any kind. Re-verified 7/11/2026 from the county Community Development page: building permit fees and Planning & Zoning application/advertising/technical fees only; no transportation, parks, fire, EMS, school or utility capacity impact fees. No county fees apply within the City of Macclenny.
    $0.00
Total (Macclenny): $1,367.00
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Macclenny: Multifamily Impact Fees

A new multifamily unit in Macclenny pays $1,367.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $1,213.00/ERU ($1,213.00) and Water System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $154.00/ERU ($154.00).

Official fee schedule

View the full fee schedule
Water$154.00
  • Water System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $154.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, rendered in browser). Sec. 21-253(d)(1): Water system capacity impact fee = $154.00 per ERU. Table I assigns Apartment = 1.0 ERU and Townhouse = 1.0 ERU — the same factor as a single-family residence, so the MF per-unit amount correctly EQUALS the SFR amount (not a copy-paste error). Duplex 2.0 / triplex 3.0 / quadruplex 4.0 ERU (i.e. 1.0 per dwelling unit). Ord. 18-11, Oct. 9, 2018; still operative. Physical connection charges are separate (Sec. 21-252(d)).
    $154.00
Sewer$1,213.00
  • Sewer System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $1,213.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, rendered in browser). Sec. 21-253(d)(2): Sewer system capacity impact fee = $1,213.00 per ERU. Table I assigns Apartment = 1.0 ERU and Townhouse = 1.0 ERU — same factor as SFR, so the MF per-unit amount correctly EQUALS the SFR amount. Duplex 2.0 / triplex 3.0 / quadruplex 4.0 ERU (1.0 per dwelling unit). Condominiums are charged per type (apartment or townhouse). Ord. 18-11, Oct. 9, 2018; still operative.
    $1,213.00
City$0.00
  • City Impact Fees (City of Macclenny, MF)
    City of Macclenny
    $0 — no city non-utility impact fees. Re-verified 7/11/2026 against the city's Building Department page on its current domain (macclenny.webpropsites.com): permitting, plan review and inspection fees only. The city's only development charges are the Sec. 21-253 water/sewer capacity impact fees. Baker County levies no impact fees.
    $0.00
County$0.00
  • County Impact Fees (Baker County, within Macclenny, MF)
    Baker County
    $0 — Baker County has NO impact fee program of any kind. Re-verified 7/11/2026 from the county Community Development page: permit + P&Z application fees only. No county fees apply within the City of Macclenny.
    $0.00
Total (Macclenny): $1,367.00
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Macclenny: Commercial Impact Fees

Commercial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 50,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).

Official fee schedule

View the full fee schedule
Water$154.00 one-time
  • Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(1): water system capacity impact fee = $154.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — Macclenny sets nonres ERUs by FIXTURE/USE count in Table I (e.g. office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'), NOT by meter size. Sec. 21-253 states: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies a strength/flow formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. Water/sewer physical CONNECTION charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues. Water+sewer combined = $1,367.00/ERU.
    $154.00 one-time
Sewer$1,213.00 one-time
  • Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(2): sewer system capacity impact fee = $1,213.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — nonres ERUs are set by FIXTURE/USE count in Table I (office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'). Sec. 21-253: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies the sewage-strength formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. One ERU = 250 gpd. Physical connection charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues.
    $1,213.00 one-time
City$0.00
  • City Impact Fees — none adopted (City of Macclenny, Commercial)
    City of Macclenny
    $0 CONFIRMED 7/11/2026 — Macclenny levies NO nonresidential municipal impact/development fees. Reviewed the full Code of Ordinances chapter list on Municode (version current through Jun 26, 2026): there is no impact-fee, development-fee, concurrency or mobility chapter anywhere in Parts I–III. The city's ONLY one-time development charges are the Ch. 21 Art. VI water/sewer system capacity impact fees (Sec. 21-253, Ord. 18-11), which are utility fees and are recorded in the Water/Sewer table. The Building Department publishes permitting, plan-review and inspection fees only.
    $0.00
County$0.00
  • County Impact Fees — none adopted (Baker County, within Macclenny, Commercial)
    Baker County
    $0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind, residential or nonresidential. The county's complete posted fee schedule (Community Development Dept) contains only building permit fees, fire-associated permit/plan-review/CO fees, Planning & Zoning application + advertising fees, and technical (attorney/engineer/surveyor) review fees. No transportation, parks, fire, EMS or school impact fees. STATUS: the Board budgeted $100,000 in FY2026 for a Stantec impact-fee study (agenda item 10/21/2025) that could establish fees for the first time — nothing adopted as of 7/11/2026. Re-check after the study concludes. Baker County Community Development 904-259-2403.
    $0.00
Total (Macclenny): $1,367.00 one-time (≈ $1,367.00 at 50,000 sq ft)
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Macclenny: Industrial Impact Fees

Industrial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 50,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).

Official fee schedule

View the full fee schedule
Water$154.00 one-time
  • Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(1): water system capacity impact fee = $154.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — Macclenny sets nonres ERUs by FIXTURE/USE count in Table I (e.g. office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'), NOT by meter size. Sec. 21-253 states: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies a strength/flow formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. Water/sewer physical CONNECTION charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues. Water+sewer combined = $1,367.00/ERU.
    $154.00 one-time
Sewer$1,213.00 one-time
  • Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(2): sewer system capacity impact fee = $1,213.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — nonres ERUs are set by FIXTURE/USE count in Table I (office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'). Sec. 21-253: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies the sewage-strength formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. One ERU = 250 gpd. Physical connection charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues.
    $1,213.00 one-time
City$0.00
  • City Impact Fees — none adopted (City of Macclenny, Industrial)
    City of Macclenny
    $0 CONFIRMED 7/11/2026 — Macclenny levies NO nonresidential municipal impact/development fees. Reviewed the full Code of Ordinances chapter list on Municode (version current through Jun 26, 2026): no impact-fee, development-fee, concurrency or mobility chapter exists. The city's only one-time development charges are the Ch. 21 Art. VI water/sewer system capacity impact fees (Sec. 21-253, Ord. 18-11), recorded in the Water/Sewer table.
    $0.00
County$0.00
  • County Impact Fees — none adopted (Baker County, within Macclenny, Industrial)
    Baker County
    $0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind. Complete posted county fee schedule = building permit fees, fire permit/CO fees, P&Z application + advertising fees, technical review fees only. A $100,000 Stantec impact-fee study was budgeted and considered 10/21/2025; nothing adopted as of 7/11/2026. Baker County Community Development 904-259-2403.
    $0.00
Total (Macclenny): $1,367.00 one-time (≈ $1,367.00 at 50,000 sq ft)
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Macclenny: Office Impact Fees

Office development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).

For a 25,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).

Official fee schedule

View the full fee schedule
Water$154.00 one-time
  • Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(1): water system capacity impact fee = $154.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — Macclenny sets nonres ERUs by FIXTURE/USE count in Table I (e.g. office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'), NOT by meter size. Sec. 21-253 states: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies a strength/flow formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. Water/sewer physical CONNECTION charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues. Water+sewer combined = $1,367.00/ERU.
    $154.00 one-time
Sewer$1,213.00 one-time
  • Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU
    City of Macclenny
    CONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(2): sewer system capacity impact fee = $1,213.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — nonres ERUs are set by FIXTURE/USE count in Table I (office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'). Sec. 21-253: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies the sewage-strength formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. One ERU = 250 gpd. Physical connection charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues.
    $1,213.00 one-time
City$0.00
  • City Impact Fees — none adopted (City of Macclenny, Office)
    City of Macclenny
    $0 CONFIRMED 7/11/2026 — Macclenny levies NO nonresidential municipal impact/development fees. Reviewed the full Code of Ordinances chapter list on Municode (version current through Jun 26, 2026): no impact-fee, development-fee, concurrency or mobility chapter exists. The city's only one-time development charges are the Ch. 21 Art. VI water/sewer system capacity impact fees (Sec. 21-253, Ord. 18-11), recorded in the Water/Sewer table.
    $0.00
County$0.00
  • County Impact Fees — none adopted (Baker County, within Macclenny, Office)
    Baker County
    $0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind. Complete posted county fee schedule = building permit fees, fire permit/CO fees, P&Z application + advertising fees, technical review fees only. A $100,000 Stantec impact-fee study was budgeted and considered 10/21/2025; nothing adopted as of 7/11/2026. Baker County Community Development 904-259-2403.
    $0.00
Total (Macclenny): $1,367.00 one-time (≈ $1,367.00 at 25,000 sq ft)
Sources last checked July 11, 2026Official fee schedule

Where in Baker County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Macclenny

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Macclenny, Florida?

A new single-family home in Macclenny pays $1,367.00 per unit in combined impact fees (rates sourced July 11, 2026).

How much are commercial impact fees in Macclenny?

Commercial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees.

Does Macclenny charge its own impact fees?

Yes. Macclenny levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Macclenny, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.