Macclenny impact fees by project type
Macclenny: Single-Family Impact Fees
A new single-family home in Macclenny pays $1,367.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $1,213.00/ERU ($1,213.00) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $154.00/ERU ($154.00).
View the full Macclenny impact fee schedule
- Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $154.00/ERU$154.00City of MacclennyCity of Macclenny water system capacity impact fee: $154.00 per equivalent residential unit (ERU), and a single-family residence counts as 1.0 ERU. Adopted by Ord. 18-11 (Oct. 9, 2018), codified at Code Sec. 21-253(d)(1), and unchanged since. Payable in full before the building permit is issued. The physical water connection/tap charge is separate from and additional to this fee; it is set administratively by the city commission rather than published in the code or on the city's rate sheet, so it is not reflected in the amount shown. Property outside the city limits may be served only on the conditions in Sec. 21-32 — a parcel contiguous with the city must first apply for voluntary annexation, and a non-contiguous parcel pays a 50% surcharge for water and sewer service.
- Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $1,213.00/ERU$1,213.00City of MacclennyCity of Macclenny sewer system capacity impact fee: $1,213.00 per equivalent residential unit (ERU), and a single-family residence counts as 1.0 ERU. Adopted by Ord. 18-11 (Oct. 9, 2018), codified at Code Sec. 21-253(d)(2), and unchanged since. Payable in full before the building permit is issued; water and sewer together total $1,367.00 per ERU. The physical sewer connection charge is separate from and additional to this fee and is set administratively rather than published, so it is not reflected in the amount shown. Property outside the city limits may be served only on the conditions in Sec. 21-32 — a parcel contiguous with the city must first apply for voluntary annexation, and a non-contiguous parcel pays a 50% surcharge for water and sewer service.
- City Impact Fees (City of Macclenny)$0.00City of MacclennyThe City of Macclenny levies no non-utility municipal impact fees — there is no transportation, parks, recreation, fire, police or similar city development fee. The city's only one-time development charges are the water and sewer system capacity impact fees under Code Sec. 21-253, alongside ordinary building permit, plan review and inspection fees. Baker County levies no impact fees either, so no county overlay applies inside the city.
- County Impact Fees (Baker County, within Macclenny)$0.00Baker CountyBaker County operates no impact fee program of any kind — no transportation, parks, fire, EMS, school or utility capacity impact fee, either countywide or in the unincorporated area. The county's published development charges are limited to building permit fees and Planning & Zoning application, advertising and technical review fees. No county fee applies within the City of Macclenny.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Macclenny: Multifamily Impact Fees
A new multifamily unit in Macclenny pays $1,367.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $1,213.00/ERU ($1,213.00) and Water System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $154.00/ERU ($154.00).
View the full Macclenny impact fee schedule
- Water System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $154.00/ERU$154.00City of MacclennyCity of Macclenny water system capacity impact fee: $154.00 per equivalent residential unit (ERU), charged per dwelling unit. The city's ERU table assigns an apartment or townhouse 1.0 ERU — the same factor as a detached single-family house — and duplex, triplex and quadruplex are 2.0, 3.0 and 4.0 ERU respectively, so the rate works out to a full 1.0 ERU per unit at every density. Code Sec. 21-28 separately requires a connection and meter for each residential unit. Adopted by Ord. 18-11 (Oct. 9, 2018) at Code Sec. 21-253(d)(1) and unchanged since; payable in full before the building permit is issued. Any commercial use inside the complex — a laundry room open to the public, a restaurant, a salon — is charged its own ERU on top of the residential units. The physical connection/tap charge is separate and additional and is set administratively rather than published, so it is not reflected in the amount shown.
- Sewer System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $1,213.00/ERU$1,213.00City of MacclennyCity of Macclenny sewer system capacity impact fee: $1,213.00 per equivalent residential unit (ERU), charged per dwelling unit. The city's ERU table assigns an apartment or townhouse 1.0 ERU — the same factor as a detached single-family house — with duplex, triplex and quadruplex at 2.0, 3.0 and 4.0 ERU, so the rate is a full 1.0 ERU per unit at every density; Code Sec. 21-28 separately requires a connection and meter for each residential unit. Adopted by Ord. 18-11 (Oct. 9, 2018) at Code Sec. 21-253(d)(2) and unchanged since; water and sewer together total $1,367.00 per ERU, payable before the building permit is issued. Any commercial use inside the complex is charged its own ERU on top of the residential units. The physical connection charge is separate and additional and is not reflected in the amount shown.
- City Impact Fees (City of Macclenny, MF)$0.00City of MacclennyThe City of Macclenny levies no non-utility municipal impact fees — there is no transportation, parks, recreation, fire, police or similar city development fee on multifamily construction. The city's only one-time development charges are the water and sewer system capacity impact fees under Code Sec. 21-253, alongside ordinary building permit, plan review and inspection fees. Baker County levies no impact fees either, so no county overlay applies inside the city.
- County Impact Fees (Baker County, within Macclenny, MF)$0.00Baker CountyBaker County operates no impact fee program of any kind — no transportation, parks, fire, EMS, school or utility capacity impact fee, and no multifamily rate schedule. The county's published development charges are limited to building permit fees and Planning & Zoning application, advertising and technical review fees. No county fee applies within the City of Macclenny.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Macclenny: Commercial Impact Fees
Commercial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 50,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).
View the full Macclenny impact fee schedule
- Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU$154.00 one-timeCity of MacclennyEffective October 9, 2018 (Ord. 18-11). The City of Macclenny's water system capacity impact fee is $154.00 per ERU. For nonresidential customers the fee is not based on meter size: ERUs are counted from fixtures and use type (offices, retail stores and warehouses are 0.2 ERU per toilet, urinal or shower; restaurants 0.2 ERU per 4 seats; service stations 1.5 ERU; factories and industrial uses as determined by the city), and commercial uses not listed are calculated from a sewage strength and flow formula. In no event is the ERU count for a nonresidential, commercial or industrial customer less than 1.0. The amount shown is that 1.0-ERU minimum; the actual fee scales with fixture count. Physical water and sewer connection charges are separate and additional. The fee is due in full before the building permit is issued. Water and sewer capacity fees combined are $1,367.00 per ERU. The city also serves some properties outside its corporate limits.
- Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU$1,213.00 one-timeCity of MacclennyEffective October 9, 2018 (Ord. 18-11). The City of Macclenny's sewer system capacity impact fee is $1,213.00 per ERU, where one ERU equals 250 gallons per day. For nonresidential customers the fee is not based on meter size: ERUs are counted from fixtures and use type (offices, retail stores and warehouses are 0.2 ERU per toilet, urinal or shower; restaurants 0.2 ERU per 4 seats; service stations 1.5 ERU; factories and industrial uses as determined by the city), and commercial uses not listed are calculated from a sewage strength and flow formula. In no event is the ERU count for a nonresidential, commercial or industrial customer less than 1.0. The amount shown is that 1.0-ERU minimum; the actual fee scales with fixture count. Physical connection charges are separate and additional. The fee is due in full before the building permit is issued.
- City Impact Fees — none adopted (City of Macclenny, Commercial)$0.00City of MacclennyThe City of Macclenny levies no municipal impact or development fees on nonresidential construction. The Code of Ordinances contains no impact fee, development fee, concurrency or mobility chapter. The city's only one-time development charges are its water and sewer system capacity impact fees under Code Ch. 21 Art. VI (Ord. 18-11); the Building Department otherwise charges permitting, plan review and inspection fees only.
- County Impact Fees — none adopted (Baker County, within Macclenny, Commercial)$0.00Baker CountyBaker County levies no impact fees of any kind, residential or nonresidential, so no county impact fee applies within the City of Macclenny. The county's adopted fee schedule contains only building permit, fire permit and certificate-of-occupancy, planning and zoning application and advertising, and technical review fees. The county has funded an impact fee study that could establish fees for the first time; nothing has been adopted.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Macclenny: Industrial Impact Fees
Industrial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 50,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).
View the full Macclenny impact fee schedule
- Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU$154.00 one-timeCity of MacclennyEffective October 9, 2018 (Ord. 18-11). The City of Macclenny's water system capacity impact fee is $154.00 per ERU. For nonresidential customers the fee is not based on meter size: ERUs are counted from fixtures and use type (offices, retail stores and warehouses are 0.2 ERU per toilet, urinal or shower; restaurants 0.2 ERU per 4 seats; service stations 1.5 ERU; factories and industrial uses as determined by the city), and commercial uses not listed are calculated from a sewage strength and flow formula. In no event is the ERU count for a nonresidential, commercial or industrial customer less than 1.0. The amount shown is that 1.0-ERU minimum; the actual fee scales with fixture count. Physical water and sewer connection charges are separate and additional. The fee is due in full before the building permit is issued. Water and sewer capacity fees combined are $1,367.00 per ERU. The city also serves some properties outside its corporate limits.
- Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU$1,213.00 one-timeCity of MacclennyEffective October 9, 2018 (Ord. 18-11). The City of Macclenny's sewer system capacity impact fee is $1,213.00 per ERU, where one ERU equals 250 gallons per day. For nonresidential customers the fee is not based on meter size: ERUs are counted from fixtures and use type (offices, retail stores and warehouses are 0.2 ERU per toilet, urinal or shower; restaurants 0.2 ERU per 4 seats; service stations 1.5 ERU; factories and industrial uses as determined by the city), and commercial uses not listed are calculated from a sewage strength and flow formula. In no event is the ERU count for a nonresidential, commercial or industrial customer less than 1.0. The amount shown is that 1.0-ERU minimum; the actual fee scales with fixture count. Physical connection charges are separate and additional. The fee is due in full before the building permit is issued.
- City Impact Fees — none adopted (City of Macclenny, Industrial)$0.00City of MacclennyThe City of Macclenny levies no municipal impact or development fees on nonresidential construction. The Code of Ordinances contains no impact fee, development fee, concurrency or mobility chapter. The city's only one-time development charges are its water and sewer system capacity impact fees under Code Ch. 21 Art. VI (Ord. 18-11); the Building Department otherwise charges permitting, plan review and inspection fees only.
- County Impact Fees — none adopted (Baker County, within Macclenny, Industrial)$0.00Baker CountyBaker County levies no impact fees of any kind, residential or nonresidential, so no county impact fee applies within the City of Macclenny. The county's adopted fee schedule contains only building permit, fire permit and certificate-of-occupancy, planning and zoning application and advertising, and technical review fees. The county has funded an impact fee study that could establish fees for the first time; nothing has been adopted.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Macclenny: Office Impact Fees
Office development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 25,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).
View the full Macclenny impact fee schedule
- Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU$154.00 one-timeCity of MacclennyEffective October 9, 2018 (Ord. 18-11). The City of Macclenny's water system capacity impact fee is $154.00 per ERU. For nonresidential customers the fee is not based on meter size: ERUs are counted from fixtures and use type (offices, retail stores and warehouses are 0.2 ERU per toilet, urinal or shower; restaurants 0.2 ERU per 4 seats; service stations 1.5 ERU; factories and industrial uses as determined by the city), and commercial uses not listed are calculated from a sewage strength and flow formula. In no event is the ERU count for a nonresidential, commercial or industrial customer less than 1.0. The amount shown is that 1.0-ERU minimum; the actual fee scales with fixture count. Physical water and sewer connection charges are separate and additional. The fee is due in full before the building permit is issued. Water and sewer capacity fees combined are $1,367.00 per ERU. The city also serves some properties outside its corporate limits.
- Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU$1,213.00 one-timeCity of MacclennyEffective October 9, 2018 (Ord. 18-11). The City of Macclenny's sewer system capacity impact fee is $1,213.00 per ERU, where one ERU equals 250 gallons per day. For nonresidential customers the fee is not based on meter size: ERUs are counted from fixtures and use type (offices, retail stores and warehouses are 0.2 ERU per toilet, urinal or shower; restaurants 0.2 ERU per 4 seats; service stations 1.5 ERU; factories and industrial uses as determined by the city), and commercial uses not listed are calculated from a sewage strength and flow formula. In no event is the ERU count for a nonresidential, commercial or industrial customer less than 1.0. The amount shown is that 1.0-ERU minimum; the actual fee scales with fixture count. Physical connection charges are separate and additional. The fee is due in full before the building permit is issued.
- City Impact Fees — none adopted (City of Macclenny, Office)$0.00City of MacclennyThe City of Macclenny levies no municipal impact or development fees on nonresidential construction. The Code of Ordinances contains no impact fee, development fee, concurrency or mobility chapter. The city's only one-time development charges are its water and sewer system capacity impact fees under Code Ch. 21 Art. VI (Ord. 18-11); the Building Department otherwise charges permitting, plan review and inspection fees only.
- County Impact Fees — none adopted (Baker County, within Macclenny, Office)$0.00Baker CountyBaker County levies no impact fees of any kind, residential or nonresidential, so no county impact fee applies within the City of Macclenny. The county's adopted fee schedule contains only building permit, fire permit and certificate-of-occupancy, planning and zoning application and advertising, and technical review fees. The county has funded an impact fee study that could establish fees for the first time; nothing has been adopted.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Macclenny impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Macclenny impact fee FAQs
What are the total impact fees for a single-family home in Macclenny, Florida?
A new single-family home in Macclenny pays $1,367.00 per unit in combined impact fees (rates sourced July 11, 2026).
How much are commercial impact fees in Macclenny?
Commercial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees.
Does Macclenny charge its own impact fees?
Yes. Macclenny levies its own municipal impact or utility fees. Baker County does not currently add county-level impact fees inside Macclenny. The schedule on this page shows every fee that applies to development in Macclenny.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Baker County impact fees page.