Macclenny impact fees by project type
Macclenny: Single-Family Impact Fees
A new single-family home in Macclenny pays $1,367.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $1,213.00/ERU ($1,213.00) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $154.00/ERU ($154.00).
View the full fee schedule
- Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $154.00/ERU$154.00City of MacclennyCity of Macclenny water system capacity impact fee, Code Sec. 21-253(d)(1): $154.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018, is the operative section; Art. VI carries no later amending ordinance. SFR = 1.0 ERU (Table I). Water + sewer combined = $1,367.00/ERU, due in full before the building permit issues (Sec. 21-253(e)). The physical water connection/tap charge is separate and additional under Sec. 21-252(d), set by city commission rules and regulations rather than published; the posted utility rate sheet (eff. Oct. 1, 2023) carries monthly base/volumetric rates and deposits only. Out-of-city service is governed by Sec. 21-32: a contiguous parcel must first apply for voluntary annexation; a non-contiguous parcel pays a 50% surcharge for water and sewer service.
- Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU × $1,213.00/ERU$1,213.00City of MacclennyCity of Macclenny sewer system capacity impact fee, Code Sec. 21-253(d)(2): $1,213.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018, is the operative section; Art. VI carries no later amending ordinance. SFR = 1.0 ERU (Table I). Water + sewer combined = $1,367.00/ERU, due in full before the building permit issues (Sec. 21-253(e)). The physical sewer connection charge is separate and additional under Sec. 21-252(d), set by city commission rules and regulations rather than published; the city's posted utility rate sheet (eff. Oct. 1, 2023) carries monthly rates and deposits only. Out-of-city service is governed by Sec. 21-32: a contiguous parcel must first apply for voluntary annexation; a non-contiguous parcel pays a 50% surcharge for water and sewer service. Macclenny treats the Town of Glen St. Mary's wastewater under a 2003 interlocal agreement.
- City Impact Fees (City of Macclenny)$0.00City of Macclenny$0 confirmed — no city non-utility impact fees. The city's Building Department schedule (current domain macclenny.webpropsites.com) covers permitting, plan review and inspection fees only. The city's ordinances defer to Municode, whose code contains no impact-fee or development-fee chapter outside Ch. 21 Art. VI (water/sewer system capacity impact fees). Baker County levies no impact fees, so there is no county overlay inside the city.
- County Impact Fees (Baker County, within Macclenny)$0.00Baker County$0 confirmed. Baker County operates no impact fee program of any kind, countywide or in the unincorporated area. The county's published schedule is building permit fees plus Planning & Zoning application, advertising and technical review fees only. No county fee applies within the City of Macclenny.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Macclenny: Multifamily Impact Fees
A new multifamily unit in Macclenny pays $1,367.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $1,213.00/ERU ($1,213.00) and Water System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $154.00/ERU ($154.00).
View the full fee schedule
- Water System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $154.00/ERU$154.00City of MacclennyCity of Macclenny water system capacity impact fee, Code Sec. 21-253(d)(1): $154.00 per ERU. Table I assigns Apartment 1.0 and Townhouse 1.0 ERU — same as SFR — so the MF per-unit amount equals SFR by design; duplex 2.0 / triplex 3.0 / quadruplex 4.0 (1.0 per dwelling unit); condominiums per type. Sec. 21-28 requires a separate connection and meter per residential unit. Related non-residential uses inside a complex (laundromat, restaurant, salon) are charged their own Table I ERU in addition (Table I note 2). Ord. 18-11 (Oct. 9, 2018) operative. The physical connection/tap charge is separate and additional under Sec. 21-252(d) and set administratively; the posted utility rate sheet carries monthly rates and deposits only.
- Sewer System Capacity Impact Fee (City of Macclenny, MF) — 1.0 ERU × $1,213.00/ERU$1,213.00City of MacclennyCity of Macclenny sewer system capacity impact fee, Code Sec. 21-253(d)(2): $1,213.00 per ERU. Table I assigns Apartment 1.0 and Townhouse 1.0 ERU — same as SFR — so the MF per-unit amount equals SFR by design; duplex 2.0 / triplex 3.0 / quadruplex 4.0 (1.0 per dwelling unit); condominiums per type. Sec. 21-28 requires a separate connection and meter per residential unit. Table I note 2: related commercial uses within a multifamily complex are charged their own ERU in addition. Ord. 18-11 (Oct. 9, 2018) operative; water + sewer combined = $1,367.00/ERU. The physical connection charge is separate and additional under Sec. 21-252(d) and unpublished.
- City Impact Fees (City of Macclenny, MF)$0.00City of Macclenny$0 confirmed — no city non-utility impact fees. The city's Building Department schedule (current domain macclenny.webpropsites.com) covers permitting, plan review and inspection fees only; the code has no impact-fee or development-fee chapter outside Ch. 21 Art. VI (water/sewer capacity impact fees). Baker County levies no impact fees either.
- County Impact Fees (Baker County, within Macclenny, MF)$0.00Baker County$0 confirmed. Baker County operates no impact fee program of any kind. The county Community Development schedule is building permit fees plus Planning & Zoning application, advertising and technical review fees only, with no multifamily column. No county fee applies within the City of Macclenny.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Macclenny: Commercial Impact Fees
Commercial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 50,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).
View the full fee schedule
- Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU$154.00 one-timeCity of MacclennyCONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(1): water system capacity impact fee = $154.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — Macclenny sets nonres ERUs by FIXTURE/USE count in Table I (e.g. office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'), NOT by meter size. Sec. 21-253 states: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies a strength/flow formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. Water/sewer physical CONNECTION charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues. Water+sewer combined = $1,367.00/ERU.
- Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU$1,213.00 one-timeCity of MacclennyCONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(2): sewer system capacity impact fee = $1,213.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — nonres ERUs are set by FIXTURE/USE count in Table I (office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'). Sec. 21-253: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies the sewage-strength formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. One ERU = 250 gpd. Physical connection charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues.
- City Impact Fees — none adopted (City of Macclenny, Commercial)$0.00City of Macclenny$0 CONFIRMED 7/11/2026 — Macclenny levies NO nonresidential municipal impact/development fees. Reviewed the full Code of Ordinances chapter list on Municode (version current through Jun 26, 2026): there is no impact-fee, development-fee, concurrency or mobility chapter anywhere in Parts I–III. The city's ONLY one-time development charges are the Ch. 21 Art. VI water/sewer system capacity impact fees (Sec. 21-253, Ord. 18-11), which are utility fees and are recorded in the Water/Sewer table. The Building Department publishes permitting, plan-review and inspection fees only.
- County Impact Fees — none adopted (Baker County, within Macclenny, Commercial)$0.00Baker County$0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind, residential or nonresidential. The county's complete posted fee schedule (Community Development Dept) contains only building permit fees, fire-associated permit/plan-review/CO fees, Planning & Zoning application + advertising fees, and technical (attorney/engineer/surveyor) review fees. No transportation, parks, fire, EMS or school impact fees. STATUS: the Board budgeted $100,000 in FY2026 for a Stantec impact-fee study (agenda item 10/21/2025) that could establish fees for the first time — nothing adopted as of 7/11/2026. Re-check after the study concludes. Baker County Community Development 904-259-2403.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Macclenny: Industrial Impact Fees
Industrial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 50,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).
View the full fee schedule
- Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU$154.00 one-timeCity of MacclennyCONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(1): water system capacity impact fee = $154.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — Macclenny sets nonres ERUs by FIXTURE/USE count in Table I (e.g. office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'), NOT by meter size. Sec. 21-253 states: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies a strength/flow formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. Water/sewer physical CONNECTION charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues. Water+sewer combined = $1,367.00/ERU.
- Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU$1,213.00 one-timeCity of MacclennyCONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(2): sewer system capacity impact fee = $1,213.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — nonres ERUs are set by FIXTURE/USE count in Table I (office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'). Sec. 21-253: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies the sewage-strength formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. One ERU = 250 gpd. Physical connection charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues.
- City Impact Fees — none adopted (City of Macclenny, Industrial)$0.00City of Macclenny$0 CONFIRMED 7/11/2026 — Macclenny levies NO nonresidential municipal impact/development fees. Reviewed the full Code of Ordinances chapter list on Municode (version current through Jun 26, 2026): no impact-fee, development-fee, concurrency or mobility chapter exists. The city's only one-time development charges are the Ch. 21 Art. VI water/sewer system capacity impact fees (Sec. 21-253, Ord. 18-11), recorded in the Water/Sewer table.
- County Impact Fees — none adopted (Baker County, within Macclenny, Industrial)$0.00Baker County$0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind. Complete posted county fee schedule = building permit fees, fire permit/CO fees, P&Z application + advertising fees, technical review fees only. A $100,000 Stantec impact-fee study was budgeted and considered 10/21/2025; nothing adopted as of 7/11/2026. Baker County Community Development 904-259-2403.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Macclenny: Office Impact Fees
Office development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 25,000 sq ft building, that comes to about $1,367.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU ($1,213.00 one-time) and Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU ($154.00 one-time).
View the full fee schedule
- Water System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $154.00/ERU$154.00 one-timeCity of MacclennyCONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(1): water system capacity impact fee = $154.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — Macclenny sets nonres ERUs by FIXTURE/USE count in Table I (e.g. office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'), NOT by meter size. Sec. 21-253 states: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies a strength/flow formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. Water/sewer physical CONNECTION charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues. Water+sewer combined = $1,367.00/ERU.
- Sewer System Capacity Impact Fee (City of Macclenny) — 1.0 ERU minimum × $1,213.00/ERU$1,213.00 one-timeCity of MacclennyCONFIRMED 7/11/2026 from the codified ordinance (Municode, current through Jun 26, 2026; rendered in Chrome). Sec. 21-253(d)(2): sewer system capacity impact fee = $1,213.00 per ERU. Ord. 18-11, adopted Oct. 9, 2018. NOT METER-BASED for nonresidential — nonres ERUs are set by FIXTURE/USE count in Table I (office, retail store, warehouse = 0.2 ERU per toilet, urinal or shower; restaurant 0.2 per 4 seats; gas station 1.5; factory/industry 'as determined by city'). Sec. 21-253: 'in no event shall the ERU for any nonresidential, commercial or industrial customer be less than 1.0.' AMOUNT STORED = the published 1.0-ERU statutory MINIMUM; actual fee scales with fixture count. Sec. 21-254 applies the sewage-strength formula (Q/250)(SS+BOD/600)(SCIF) to commercial uses not listed in Table I. One ERU = 250 gpd. Physical connection charges are separate and additional (Sec. 21-252(d)). Due in full before the building permit issues.
- City Impact Fees — none adopted (City of Macclenny, Office)$0.00City of Macclenny$0 CONFIRMED 7/11/2026 — Macclenny levies NO nonresidential municipal impact/development fees. Reviewed the full Code of Ordinances chapter list on Municode (version current through Jun 26, 2026): no impact-fee, development-fee, concurrency or mobility chapter exists. The city's only one-time development charges are the Ch. 21 Art. VI water/sewer system capacity impact fees (Sec. 21-253, Ord. 18-11), recorded in the Water/Sewer table.
- County Impact Fees — none adopted (Baker County, within Macclenny, Office)$0.00Baker County$0 CONFIRMED 7/11/2026 — Baker County has NO impact fee program of any kind. Complete posted county fee schedule = building permit fees, fire permit/CO fees, P&Z application + advertising fees, technical review fees only. A $100,000 Stantec impact-fee study was budgeted and considered 10/21/2025; nothing adopted as of 7/11/2026. Baker County Community Development 904-259-2403.
Where in Baker County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Estimate your project in Macclenny
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Macclenny, Florida?
A new single-family home in Macclenny pays $1,367.00 per unit in combined impact fees (rates sourced July 11, 2026).
How much are commercial impact fees in Macclenny?
Commercial development in Macclenny pays no per-square-foot impact fees, but owes $1,367.00 in one-time water and sewer connection fees.
Does Macclenny charge its own impact fees?
Yes. Macclenny levies its own municipal impact or utility fees. Baker County does not currently add county-level impact fees inside Macclenny. The schedule on this page shows every fee that applies to development in Macclenny.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Baker County impact fees page.