Altha impact fees by project type
Altha: Single-Family Impact Fees
Altha has no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Town of Altha) is set by the utility and not published online. City Impact Fees (Town of Altha) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Altha)Requires confirmationTown of AlthaInternal research note: Altha does operate a public water system — EPA SDWIS PWSID FL1070014, 'ALTHA, TOWN OF WATER SYSTEM', active community water system, 800 population served, 280 service connections — so a connection/tap charge almost certainly exists. The town is not in Municode, American Legal, or eCode360. townofaltha.org is a Wix site whose 'Town Ordinances & Important Documents' page and 'Ordinances & Minutes' page are both empty ('Please check back for an updated list of all town council meeting agendas / minutes'). No fee schedule, ordinance, or rate resolution is published anywhere. Not a documented zero — just unpublished. 8/5/2026
- Sewer Connection Fee (Town of Altha)$0.00Town of AlthaInternal research note: FDEP WAFR wastewater-facility registry returns exactly two Calhoun County domestic wastewater records — 'Blountstown WWTP' (active, 1.5 MGD) and a residuals land application site. There is no Altha wastewater treatment facility or collection system of record anywhere in the county registry. EPA SDWIS confirms Altha operates only a drinking-water system (PWSID FL1070014, 'ALTHA, TOWN OF WATER SYSTEM', active community water system, 280 service connections, 800 population served). Development in Altha is on septic, so there is no town sewer connection charge to pay. 8/5/2026
- City Impact Fees (Town of Altha)Requires confirmationTown of AlthaInternal research note: Almost certainly $0 — Altha is a town of roughly 500 people in Calhoun County, one of Florida's smallest and poorest counties, and no impact fee program for Altha or for Calhoun County surfaced in any search. But the town publishes no code (absent from Municode, American Legal, and eCode360) and its own ordinances page is an empty placeholder, so there is no adopted fee schedule or code section to point at that affirmatively shows the absence. Per the owner rule that county-level or general evidence cannot document a municipality's absence of a fee, this stays INFERRED_0. 8/5/2026
- County Impact Fees (Town of Altha)$0.00Calhoun County$0 — no county overlay fee applies inside Altha because Calhoun County levies no impact fees; no impact-fee ordinance appears in the county's complete ordinance record, 1975-2026, so no municipal-participation or interlocal question arises.
Where in Calhoun County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Altha: Multifamily Impact Fees
Altha has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Town of Altha, MF) is set by the utility and not published online. City Impact Fees (Town of Altha, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Altha, MF)Requires confirmationTown of AlthaInternal research note: Altha operates an active community water system (EPA SDWIS PWSID FL1070014, 280 service connections), so a connection charge exists. The town publishes no code and no fee schedule — townofaltha.org's ordinances and documents pages are both empty placeholders — so neither the amount nor the multifamily basis (per unit vs. per meter) is published. INFERRED_0. 8/5/2026
- Sewer Connection Fee (Town of Altha, MF)$0.00Town of AlthaInternal research note: Same basis as the Altha SFR sewer row. FDEP's WAFR wastewater facility registry lists only one active domestic wastewater treatment facility in Calhoun County — Blountstown WWTP (1.5 MGD) — plus one residuals application site, and no Altha facility or collection system. EPA SDWIS shows Altha operating a drinking-water system only. There is no town sewer to connect to, at any density. 8/5/2026
- City Impact Fees (Town of Altha, MF)Requires confirmationTown of AlthaInternal research note: Same posture as the Altha SFR impact fee row. Very likely $0 — no impact fee program for Altha or Calhoun County surfaced — but Altha publishes no code (absent from Municode, American Legal, and eCode360) and its own ordinances page is an empty placeholder, so there is no adopted schedule or code section that affirmatively shows the absence. INFERRED_0 per the owner rule against inferring a municipality's zero from county-level or general evidence. 8/5/2026
- County Impact Fees (Town of Altha, MF)$0.00Calhoun County$0 — no county overlay fee applies inside Altha because Calhoun County levies no impact fees; no impact-fee ordinance appears in the county's complete ordinance record, 1975-2026, so no municipal-participation or interlocal question arises.
Where in Calhoun County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Altha: Commercial Impact Fees
Commercial development in Altha pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Altha) and Sewer Connection Fee (Town of Altha) are set by the utility and not published online. City Impact Fees (Town of Altha, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Altha)Requires confirmationTown of Altha$0 PLACEHOLDER, UNCONFIRMED — amount not published anywhere. The Town of Altha DOES run its own municipal water utility (customer billing via MuniBilling / CPTeller online bill pay), so a nonresidential water tap/connection fee almost certainly exists, but it is set by the Town Council and is NOT posted: Altha is not on Municode (no codifier) and townofaltha.org publishes no ordinances and no rate/fee schedule. AUDIT 7/12/2026 (re-verified, Chrome-rendered): BOTH town document pages are empty — /agendas-minutes reads 'Please check back for an updated list' and /town-ordinances renders a heading with ZERO documents. Repeat web searches for an Altha water rate/tap fee ordinance return nothing. No commercial meter-size table exists in any public source. Only a phone call can close this. VERIFY the nonres/commercial tap fee and its meter-size basis: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- Sewer Connection Fee (Town of Altha)Requires confirmationTown of Altha$0 PLACEHOLDER, UNCONFIRMED — amount not published, and the system itself is brand new. MATERIAL CONTEXT: Altha is CURRENTLY BUILDING its first municipal gravity sewer system — a Small Cities CDBG (FFY 2025, Neighborhood Revitalization) project: ~6,400 LF of 8-inch gravity sewer + ~2,800 LF of 6-inch force main plus a master lift station along SR 71, sized to connect ~90 residential homes (public notice April 2026, calhouncountyfl.gov/uploads/2026/04/altha-2nd-public-notice.pdf). Sewer service is therefore new, residential-oriented, and limited in extent — nonresidential availability is uncertain and no connection fee is published. AUDIT 7/12/2026 (re-verified): both town document pages (/agendas-minutes, /town-ordinances) are empty; repeat web searches surface only the CDBG public notice, no rate or connection-fee ordinance. Only a phone call can close this. VERIFY nonres sewer availability and connection fee: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- City Impact Fees (Town of Altha, Commercial)Requires confirmationTown of Altha$0, UNCONFIRMED. Town of Altha (pop. ~536) — no nonresidential development/impact fees identified; none expected for a town this size. Absence cannot be affirmatively proved from any posted source: Altha is NOT on Municode (no codifier), and its official site (townofaltha.org) publishes NO ordinances and no fee schedule. AUDIT 7/12/2026 (re-verified, Chrome-rendered): BOTH of the town's document pages are empty — 'Ordinances & Minutes' (/agendas-minutes) reads only 'Please check back for an updated list', and 'Town Ordinances & Important Documents' (/town-ordinances) renders a heading with ZERO documents beneath it. Repeat targeted web searches for an Altha impact fee / rate schedule / 2025-2026 fee ordinance return nothing. Only a phone call can close this. VERIFY existence and any nonres rate: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- County Impact Fees (Town of Altha, Commercial)$0.00Calhoun CountyCONFIRMED $0 — no county overlay fee applies inside Altha because Calhoun County levies NO impact fees at all, on any land use. Independently re-proved 7/12/2026 by full-text extraction of the county's own 30-page official Ordinance Index (uploads/2026/07/ordinance-index-7.pdf, current as of July 2026, listing every ordinance adopted 1975 through 2026): the index contains ZERO impact-fee ordinances. The only 'impact' hits are the phrase 'types of cases impacted' in court cost-assessment ordinances (2002-04, 2006-06, 2024-07) — unrelated. The only fee ordinances are building-permit fees and civil-case filing fees. Rural county, ~13,000 pop. Calhoun County Planning/Building (850) 674-8046.
Where in Calhoun County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Altha: Industrial Impact Fees
Industrial development in Altha pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Altha) and Sewer Connection Fee (Town of Altha) are set by the utility and not published online. City Impact Fees (Town of Altha, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Altha)Requires confirmationTown of Altha$0 PLACEHOLDER, UNCONFIRMED — amount not published anywhere. The Town of Altha DOES run its own municipal water utility (customer billing via MuniBilling / CPTeller online bill pay), so a nonresidential water tap/connection fee almost certainly exists, but it is set by the Town Council and is NOT posted: Altha is not on Municode (no codifier) and townofaltha.org publishes no ordinances and no rate/fee schedule. AUDIT 7/12/2026 (re-verified, Chrome-rendered): BOTH town document pages are empty — /agendas-minutes reads 'Please check back for an updated list' and /town-ordinances renders a heading with ZERO documents. Repeat web searches for an Altha water rate/tap fee ordinance return nothing. No commercial meter-size table exists in any public source. Only a phone call can close this. VERIFY the nonres/commercial tap fee and its meter-size basis: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- Sewer Connection Fee (Town of Altha)Requires confirmationTown of Altha$0 PLACEHOLDER, UNCONFIRMED — amount not published, and the system itself is brand new. MATERIAL CONTEXT: Altha is CURRENTLY BUILDING its first municipal gravity sewer system — a Small Cities CDBG (FFY 2025, Neighborhood Revitalization) project: ~6,400 LF of 8-inch gravity sewer + ~2,800 LF of 6-inch force main plus a master lift station along SR 71, sized to connect ~90 residential homes (public notice April 2026, calhouncountyfl.gov/uploads/2026/04/altha-2nd-public-notice.pdf). Sewer service is therefore new, residential-oriented, and limited in extent — nonresidential availability is uncertain and no connection fee is published. AUDIT 7/12/2026 (re-verified): both town document pages (/agendas-minutes, /town-ordinances) are empty; repeat web searches surface only the CDBG public notice, no rate or connection-fee ordinance. Only a phone call can close this. VERIFY nonres sewer availability and connection fee: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- City Impact Fees (Town of Altha, Industrial)Requires confirmationTown of Altha$0, UNCONFIRMED. Town of Altha (pop. ~536) — no nonresidential development/impact fees identified; none expected for a town this size. Absence cannot be affirmatively proved from any posted source: Altha is NOT on Municode (no codifier), and its official site (townofaltha.org) publishes NO ordinances and no fee schedule. AUDIT 7/12/2026 (re-verified, Chrome-rendered): BOTH of the town's document pages are empty — 'Ordinances & Minutes' (/agendas-minutes) reads only 'Please check back for an updated list', and 'Town Ordinances & Important Documents' (/town-ordinances) renders a heading with ZERO documents beneath it. Repeat targeted web searches for an Altha impact fee / rate schedule / 2025-2026 fee ordinance return nothing. Only a phone call can close this. VERIFY existence and any nonres rate: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- County Impact Fees (Town of Altha, Industrial)$0.00Calhoun CountyCONFIRMED $0 — no county overlay fee applies inside Altha because Calhoun County levies NO impact fees at all, on any land use. Independently re-proved 7/12/2026 by full-text extraction of the county's own 30-page official Ordinance Index (uploads/2026/07/ordinance-index-7.pdf, current as of July 2026, listing every ordinance adopted 1975 through 2026): the index contains ZERO impact-fee ordinances. Calhoun County Planning/Building (850) 674-8046.
Where in Calhoun County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Altha: Office Impact Fees
Office development in Altha pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Altha) and Sewer Connection Fee (Town of Altha) are set by the utility and not published online. City Impact Fees (Town of Altha, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Altha)Requires confirmationTown of Altha$0 PLACEHOLDER, UNCONFIRMED — amount not published anywhere. The Town of Altha DOES run its own municipal water utility (customer billing via MuniBilling / CPTeller online bill pay), so a nonresidential water tap/connection fee almost certainly exists, but it is set by the Town Council and is NOT posted: Altha is not on Municode (no codifier) and townofaltha.org publishes no ordinances and no rate/fee schedule. AUDIT 7/12/2026 (re-verified, Chrome-rendered): BOTH town document pages are empty — /agendas-minutes reads 'Please check back for an updated list' and /town-ordinances renders a heading with ZERO documents. Repeat web searches for an Altha water rate/tap fee ordinance return nothing. No commercial meter-size table exists in any public source. Only a phone call can close this. VERIFY the nonres/commercial tap fee and its meter-size basis: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- Sewer Connection Fee (Town of Altha)Requires confirmationTown of Altha$0 PLACEHOLDER, UNCONFIRMED — amount not published, and the system itself is brand new. MATERIAL CONTEXT: Altha is CURRENTLY BUILDING its first municipal gravity sewer system — a Small Cities CDBG (FFY 2025, Neighborhood Revitalization) project: ~6,400 LF of 8-inch gravity sewer + ~2,800 LF of 6-inch force main plus a master lift station along SR 71, sized to connect ~90 residential homes (public notice April 2026, calhouncountyfl.gov/uploads/2026/04/altha-2nd-public-notice.pdf). Sewer service is therefore new, residential-oriented, and limited in extent — nonresidential availability is uncertain and no connection fee is published. AUDIT 7/12/2026 (re-verified): both town document pages (/agendas-minutes, /town-ordinances) are empty; repeat web searches surface only the CDBG public notice, no rate or connection-fee ordinance. Only a phone call can close this. VERIFY nonres sewer availability and connection fee: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- City Impact Fees (Town of Altha, Office)Requires confirmationTown of Altha$0, UNCONFIRMED. Town of Altha (pop. ~536) — no nonresidential development/impact fees identified; none expected for a town this size. Absence cannot be affirmatively proved from any posted source: Altha is NOT on Municode (no codifier), and its official site (townofaltha.org) publishes NO ordinances and no fee schedule. AUDIT 7/12/2026 (re-verified, Chrome-rendered): BOTH of the town's document pages are empty — 'Ordinances & Minutes' (/agendas-minutes) reads only 'Please check back for an updated list', and 'Town Ordinances & Important Documents' (/town-ordinances) renders a heading with ZERO documents beneath it. Repeat targeted web searches for an Altha impact fee / rate schedule / 2025-2026 fee ordinance return nothing. Only a phone call can close this. VERIFY existence and any nonres rate: Town Clerk Dustin Graham, Altha Town Hall (850) 762-3280, clerk@townofaltha.com.
- County Impact Fees (Town of Altha, Office)$0.00Calhoun CountyCONFIRMED $0 — no county overlay fee applies inside Altha because Calhoun County levies NO impact fees at all, on any land use. Independently re-proved 7/12/2026 by full-text extraction of the county's own 30-page official Ordinance Index (uploads/2026/07/ordinance-index-7.pdf, current as of July 2026, listing every ordinance adopted 1975 through 2026): the index contains ZERO impact-fee ordinances. The only 'impact' hits are the phrase 'types of cases impacted' in court cost-assessment ordinances — unrelated. Calhoun County Planning/Building (850) 674-8046.
Where in Calhoun County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Altha
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
How much are commercial impact fees in Altha?
Altha does not currently levy impact fees on commercial development.
Does Altha charge its own impact fees?
Yes. Altha levies its own municipal impact or utility fees. Calhoun County does not currently add county-level impact fees inside Altha. The schedule on this page shows every fee that applies to development in Altha.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Calhoun County impact fees page.