IMPACTFEES.ORG

Blountstown, Florida Impact Fees

Blountstown applies its own fee schedule. Calhoun County does not currently add county-level impact fees inside city limits. A new single-family home pays $2,000.00 per unit (rates sourced July 12, 2026). The full breakdown is below.

Blountstown impact fees by project type

Blountstown: Single-Family Impact Fees

A new single-family home in Blountstown pays $2,000.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Blountstown) ($1,500.00) and Water Tap Fee (City of Blountstown) ($500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$500.00
  • Water Tap Fee (City of Blountstown)
    City of Blountstown
    CONFIRMED. Code Sec. 40-206 (Miscellaneous fee and charges) — Water Tap Fee (inside city limit), Residential 3/4" = $500.00; 1" = $900.00. Taps for other sizes and outside city limits set by the city manager. Required deposit (~$20 water) not included. Fee originally set by Ord. No. 2005-02 (5-10-2005) but RE-VERIFIED 7/11/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025), online content updated 4/14/2026: Sec. 40-206 is unamended and remains the operative adopted fee — the prior 'likely stale' flag is disproved. City of Blountstown (850) 674-5488.
    $500.00
Sewer$1,500.00
  • Sewer Tap Fee (City of Blountstown)
    City of Blountstown
    CONFIRMED. Code Sec. 40-206 (Miscellaneous fee and charges) — Sewer Tap Fee, Residential = $1,500.00 (Commercial $2,500.00). Required deposit not included. Fee originally set by Ord. No. 2006-01 (3-14-2006) but RE-VERIFIED 7/11/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025), online content updated 4/14/2026: Sec. 40-206 is unamended and remains the operative adopted fee — the prior 'likely stale' flag is disproved. City of Blountstown (850) 674-5488.
    $1,500.00
City$0.00
  • City Impact Fees (City of Blountstown)
    City of Blountstown
    CONFIRMED $0 — Blountstown levies no development impact fees. Re-proved 7/11/2026: full-code Municode search for 'impact fee' (Supp. No. 12, codified through Ord. No. 2025-15, 12-9-2025) returns ZERO impact-fee provisions anywhere in the Code or in Appendix A - Land Development Code; the only hit is a special-event permit fee (Sec. 34-115). Chapter list re-reviewed — no impact/development-fee chapter. City utility tap fees are captured on the Water and Sewer records. City of Blountstown (850) 674-5488.
    $0.00
County$0.00
  • County Impact Fees (City of Blountstown)
    Calhoun County
    CONFIRMED $0 — no county overlay fee applies inside Blountstown because Calhoun County levies no impact fees at all. Re-proved 7/11/2026 from the county's own complete ordinance list (calhouncountyfl.gov/ordinances/, every ordinance 1975 through 2026): no impact-fee ordinance has ever been adopted. Calhoun County Planning/Building (850) 674-8046.
    $0.00
Total (Blountstown): $2,000.00
Sources last checked July 12, 2026Official fee schedules:City of Blountstown Calhoun County

Where in Calhoun County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Blountstown: Multifamily Impact Fees

A new multifamily unit in Blountstown pays $2,000.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Blountstown, MF) ($1,500.00) and Water Tap Fee (City of Blountstown, MF) ($500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$500.00
  • Water Tap Fee (City of Blountstown, MF)
    City of Blountstown
    CONFIRMED, per dwelling unit. Code Sec. 40-206 — Water Tap Fee (inside city limit), Residential 3/4" = $500.00 (1" = $900). This is NOT an SFR-rate copy: Code Sec. 40-57 provides that each residential unit is a separate unit for the payment of water and sewage fees and that separate connections and meters are required for each such unit — so the residential tap fee applies per MF dwelling unit. Re-verified 7/11/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025), content updated 4/14/2026; Sec. 40-206 unamended since Ord. 2005-02 and still operative. Larger master-meter sizes are set by the city manager — confirm at project scale. City of Blountstown (850) 674-5488.
    $500.00
Sewer$1,500.00
  • Sewer Tap Fee (City of Blountstown, MF)
    City of Blountstown
    CONFIRMED, per dwelling unit. Code Sec. 40-206 — Sewer Tap Fee, Residential = $1,500.00. This is NOT an SFR-rate copy: Code Sec. 40-57 provides that each residential unit is a separate unit for the payment of water and sewage disposal fees and that separate connections are required for each such unit — so the residential sewer tap fee applies per MF dwelling unit. Re-verified 7/11/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025), content updated 4/14/2026; Sec. 40-206 unamended since Ord. 2006-01 and still operative. City of Blountstown (850) 674-5488.
    $1,500.00
City$0.00
  • City Impact Fees (City of Blountstown, MF)
    City of Blountstown
    CONFIRMED $0 — Blountstown levies no development impact fees on any housing type. Re-proved 7/11/2026: full-code Municode search for 'impact fee' (Supp. No. 12, codified through Ord. No. 2025-15, 12-9-2025) returns ZERO impact-fee provisions anywhere in the Code or Appendix A - Land Development Code; only hit is a special-event permit fee (Sec. 34-115). City utility tap fees are captured on the Water and Sewer records. City of Blountstown (850) 674-5488.
    $0.00
County$0.00
  • County Impact Fees (City of Blountstown, MF)
    Calhoun County
    CONFIRMED $0 — no county overlay fee applies inside Blountstown because Calhoun County levies no impact fees at all. Re-proved 7/11/2026 from the county's own complete ordinance list (calhouncountyfl.gov/ordinances/, every ordinance 1975 through 2026): no impact-fee ordinance has ever been adopted. Calhoun County Planning/Building (850) 674-8046.
    $0.00
Total (Blountstown): $2,000.00
Sources last checked July 12, 2026Official fee schedules:City of Blountstown Calhoun County

Where in Calhoun County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Blountstown: Commercial Impact Fees

Commercial development in Blountstown pays no per-square-foot impact fees, but owes $3,600.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $3,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Blountstown) ($2,500.00 one-time) and Water Tap Fee (City of Blountstown) — 1" meter ($1,100.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,100.00 one-time
  • Water Tap Fee (City of Blountstown) — 1" meter
    City of Blountstown
    CONFIRMED. Code Sec. 40-206 (Miscellaneous fee and charges), 'WATER TAP FEE (INSIDE CITY LIMIT)' table — the schedule publishes a separate COMMERCIAL row: 3/4" = $700.00, 1" = $1,100.00 (vs. Residential 3/4" = $500.00, 1" = $900.00). This record is the canonical 1" commercial meter. Required deposit NOT included. CAVEAT: 'Taps for all other sizes and those outside the city limits to be determined by the city manager' — meters larger than 1" are set administratively and are not published; a large nonres user must get a quote. Verified 7/12/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025); Sec. 40-206 is unamended and operative. City of Blountstown (850) 674-5488.
    $1,100.00 one-time
Sewer$2,500.00 one-time
  • Sewer Tap Fee (City of Blountstown)
    City of Blountstown
    CONFIRMED. Code Sec. 40-206 (Miscellaneous fee and charges), 'GAS AND SEWER TAP FEE' table — Sewer Tap Fee, COMMERCIAL = $2,500.00 (Residential = $1,500.00). Flat fee, NOT meter-tiered: the sewer schedule publishes a single commercial figure with no meter-size table, hence Subtype blank and Is Default true. Required deposit NOT included. Verified 7/12/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025); Sec. 40-206 is unamended and operative. City of Blountstown (850) 674-5488.
    $2,500.00 one-time
City$0.00
  • City Impact Fees (City of Blountstown, Commercial)
    City of Blountstown
    CONFIRMED $0 — Blountstown levies NO development/impact fees on nonresidential (or any) development. Verified 7/12/2026 against Municode (Supp. No. 12, codified through Ord. No. 2025-15, 12-9-2025): full-code search for 'impact fee' returns ZERO impact-fee provisions anywhere in the Code of Ordinances or in Appendix A - Land Development Code; the sole hit is a special-event permit fee (Sec. 34-115). Chapter list reviewed — there is no impact/development-fee chapter, and no separately posted development fee schedule. The city's only development-related one-time charges are utility tap fees (Sec. 40-206), captured on the Water/Sewer records. City of Blountstown (850) 674-5488.
    $0.00
County$0.00
  • County Impact Fees (City of Blountstown, Commercial)
    Calhoun County
    CONFIRMED $0 — no county overlay fee applies inside Blountstown because Calhoun County levies NO impact fees at all. Independently re-proved 7/12/2026 by full-text extraction of the county's 30-page official Ordinance Index (uploads/2026/07/ordinance-index-7.pdf, July 2026, every ordinance 1975-2026): ZERO impact-fee ordinances. Calhoun County Planning/Building (850) 674-8046.
    $0.00
Total (Blountstown): $3,600.00 one-time (≈ $3,600.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:City of Blountstown Calhoun County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Calhoun County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Blountstown: Industrial Impact Fees

Industrial development in Blountstown pays no per-square-foot impact fees, but owes $3,600.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $3,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Blountstown) ($2,500.00 one-time) and Water Tap Fee (City of Blountstown) — 1" meter ($1,100.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,100.00 one-time
  • Water Tap Fee (City of Blountstown) — 1" meter
    City of Blountstown
    CONFIRMED. Code Sec. 40-206 (Miscellaneous fee and charges), 'WATER TAP FEE (INSIDE CITY LIMIT)' table — the schedule publishes a separate COMMERCIAL row: 3/4" = $700.00, 1" = $1,100.00 (vs. Residential 3/4" = $500.00, 1" = $900.00). This record is the canonical 1" commercial meter. Required deposit NOT included. CAVEAT: 'Taps for all other sizes and those outside the city limits to be determined by the city manager' — meters larger than 1" are set administratively and are not published; a large nonres user must get a quote. Verified 7/12/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025); Sec. 40-206 is unamended and operative. City of Blountstown (850) 674-5488.
    $1,100.00 one-time
Sewer$2,500.00 one-time
  • Sewer Tap Fee (City of Blountstown)
    City of Blountstown
    CONFIRMED. Code Sec. 40-206 (Miscellaneous fee and charges), 'GAS AND SEWER TAP FEE' table — Sewer Tap Fee, COMMERCIAL = $2,500.00 (Residential = $1,500.00). Flat fee, NOT meter-tiered: the sewer schedule publishes a single commercial figure with no meter-size table, hence Subtype blank and Is Default true. Required deposit NOT included. Verified 7/12/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025); Sec. 40-206 is unamended and operative. City of Blountstown (850) 674-5488.
    $2,500.00 one-time
City$0.00
  • City Impact Fees (City of Blountstown, Industrial)
    City of Blountstown
    CONFIRMED $0 — Blountstown levies NO development/impact fees. Verified 7/12/2026 against Municode (Supp. No. 12, codified through Ord. No. 2025-15, 12-9-2025): full-code search for 'impact fee' returns ZERO impact-fee provisions in the Code or Appendix A - Land Development Code; sole hit is a special-event permit fee (Sec. 34-115). No impact/development-fee chapter and no separately posted development fee schedule. City utility tap fees (Sec. 40-206) are captured on the Water/Sewer records. City of Blountstown (850) 674-5488.
    $0.00
County$0.00
  • County Impact Fees (City of Blountstown, Industrial)
    Calhoun County
    CONFIRMED $0 — no county overlay fee applies inside Blountstown because Calhoun County levies NO impact fees at all. Independently re-proved 7/12/2026 by full-text extraction of the county's 30-page official Ordinance Index (uploads/2026/07/ordinance-index-7.pdf, July 2026, every ordinance 1975-2026): ZERO impact-fee ordinances. Calhoun County Planning/Building (850) 674-8046.
    $0.00
Total (Blountstown): $3,600.00 one-time (≈ $3,600.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:City of Blountstown Calhoun County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Calhoun County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Blountstown: Office Impact Fees

Office development in Blountstown pays no per-square-foot impact fees, but owes $3,600.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $3,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Blountstown) ($2,500.00 one-time) and Water Tap Fee (City of Blountstown) — 1" meter ($1,100.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,100.00 one-time
  • Water Tap Fee (City of Blountstown) — 1" meter
    City of Blountstown
    CONFIRMED. Code Sec. 40-206 (Miscellaneous fee and charges), 'WATER TAP FEE (INSIDE CITY LIMIT)' table — the schedule publishes a separate COMMERCIAL row: 3/4" = $700.00, 1" = $1,100.00 (vs. Residential 3/4" = $500.00, 1" = $900.00). This record is the canonical 1" commercial meter. Required deposit NOT included. CAVEAT: 'Taps for all other sizes and those outside the city limits to be determined by the city manager' — meters larger than 1" are set administratively and are not published; a large nonres user must get a quote. Verified 7/12/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025); Sec. 40-206 is unamended and operative. City of Blountstown (850) 674-5488.
    $1,100.00 one-time
Sewer$2,500.00 one-time
  • Sewer Tap Fee (City of Blountstown)
    City of Blountstown
    CONFIRMED. Code Sec. 40-206 (Miscellaneous fee and charges), 'GAS AND SEWER TAP FEE' table — Sewer Tap Fee, COMMERCIAL = $2,500.00 (Residential = $1,500.00). Flat fee, NOT meter-tiered: the sewer schedule publishes a single commercial figure with no meter-size table, hence Subtype blank and Is Default true. Required deposit NOT included. Verified 7/12/2026 against Municode Supp. No. 12, codified through Ord. No. 2025-15 (12-9-2025); Sec. 40-206 is unamended and operative. City of Blountstown (850) 674-5488.
    $2,500.00 one-time
City$0.00
  • City Impact Fees (City of Blountstown, Office)
    City of Blountstown
    CONFIRMED $0 — Blountstown levies NO development/impact fees. Verified 7/12/2026 against Municode (Supp. No. 12, codified through Ord. No. 2025-15, 12-9-2025): full-code search for 'impact fee' returns ZERO impact-fee provisions in the Code or Appendix A - Land Development Code; sole hit is a special-event permit fee (Sec. 34-115). No impact/development-fee chapter and no separately posted development fee schedule. City utility tap fees (Sec. 40-206) are captured on the Water/Sewer records. City of Blountstown (850) 674-5488.
    $0.00
County$0.00
  • County Impact Fees (City of Blountstown, Office)
    Calhoun County
    CONFIRMED $0 — no county overlay fee applies inside Blountstown because Calhoun County levies NO impact fees at all. Independently re-proved 7/12/2026 by full-text extraction of the county's 30-page official Ordinance Index (uploads/2026/07/ordinance-index-7.pdf, July 2026, every ordinance 1975-2026): ZERO impact-fee ordinances. Calhoun County Planning/Building (850) 674-8046.
    $0.00
Total (Blountstown): $3,600.00 one-time (≈ $3,600.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:City of Blountstown Calhoun County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Calhoun County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Blountstown

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Blountstown, Florida?

A new single-family home in Blountstown pays $2,000.00 per unit in combined impact fees (rates sourced July 12, 2026).

How much are commercial impact fees in Blountstown?

Commercial development in Blountstown pays no per-square-foot impact fees, but owes $3,600.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Blountstown charge its own impact fees?

Yes. Blountstown levies its own municipal impact or utility fees. Calhoun County does not currently add county-level impact fees inside Blountstown. The schedule on this page shows every fee that applies to development in Blountstown.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Calhoun County impact fees page.

Missing a jurisdiction? Get in touch.