IMPACTFEES.ORG

Escambia County, Florida Impact Fees

Impact fees in Escambia County depend on where you build. This page details the rates for unincorporated Escambia County: $2,447.00 per single-family unit as of . Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Escambia County impact fees by project type

Where in Escambia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Escambia County$2,447.00this page
Century$0.00Includes unconfirmed feesPensacola$2,447.00

Unincorporated Escambia County: Single-Family Impact Fees

A new single-family home in unincorporated Escambia County pays $2,447.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (ECUA) ($1,602.00) and Water Impact Fee (ECUA) ($845.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Escambia County impact fee schedule
Water$845.00
  • Water Impact Fee (ECUA)
    5/8" meter
    Emerald Coast Utilities Authority (ECUA)
    ECUA water capacity impact fee for a standard 5/8-inch residential meter. Effective October 1, 2025. Larger meters pay more (1-inch = $1,447). An additional water connection fee applies: $808.95 short service / $956.36 long service. Fees are site-specific and non-refundable.
    $845.00
Sewer$1,602.00
  • Sewer Impact Fee (ECUA)
    5/8" meter
    Emerald Coast Utilities Authority (ECUA)
    ECUA sewer capacity impact fee for a standard 5/8-inch residential meter. Effective October 1, 2025 (ECUA fiscal year runs October 1–September 30). Larger meters pay more (1-inch = $2,743). Where no usable sewer lateral is stubbed to the property line, an additional connection charge applies at actual cost of labor, materials, and overhead. Fees are site-specific and non-refundable.
    $1,602.00
City$0.00
County$0.00
  • County Impact Fee (Escambia County)
    Escambia County
    Escambia County levies no general development impact fee — no transportation/mobility, parks, fire, law-enforcement, or school impact fee. The one county-imposed one-time development charge is the Perdido Key Beach Mouse habitat-mitigation fee ($100,000 per acre of impacted habitat), which applies only to development inside the Perdido Key Habitat Conservation Plan area and is assessed per acre of habitat, not per dwelling unit.
    $0.00
Total (unincorporated Escambia County): $2,447.00
Sources last checked Official fee schedules:Emerald Coast Utilities Authority (ECUA) N/A Escambia County

Where in Escambia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Escambia County$2,447.00this page
Century$0.00Includes unconfirmed feesPensacola$2,447.00

Unincorporated Escambia County: Multifamily Impact Fees

A new multifamily unit in unincorporated Escambia County pays $2,447.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (ECUA, MF) ($1,602.00) and Water Impact Fee (ECUA, MF) ($845.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Escambia County impact fee schedule
Water$845.00
  • Water Impact Fee (ECUA, MF)
    5/8" meter
    Emerald Coast Utilities Authority (ECUA)
    ECUA water capacity impact fee. The amount shown is the base for a standard 5/8-inch meter, effective October 1, 2025. ECUA assesses by meter size, not per dwelling unit, so a master-metered multifamily project pays according to its master-meter size (1-inch = $1,447), and the effective per-unit fee differs. An additional water connection fee applies ($808.95 short / $956.36 long service). Fees are site-specific and non-refundable.
    $845.00
Sewer$1,602.00
  • Sewer Impact Fee (ECUA, MF)
    5/8" meter
    Emerald Coast Utilities Authority (ECUA)
    ECUA sewer capacity impact fee. The amount shown is the base for a standard 5/8-inch meter, effective October 1, 2025. ECUA assesses by meter size, not per dwelling unit, so a master-metered multifamily project pays according to its master-meter size (1-inch = $2,743). Where no usable sewer lateral is stubbed to the property line, an additional connection charge applies at actual cost. Fees are site-specific and non-refundable.
    $1,602.00
City$0.00
County$0.00
  • County Impact Fee (Escambia County, MF)
    Escambia County
    Escambia County levies no general development impact fee — no transportation/mobility, parks, fire, law-enforcement, or school impact fee. The one county-imposed one-time development charge is the Perdido Key Beach Mouse habitat-mitigation fee ($100,000 per acre of impacted habitat), which applies only to development inside the Perdido Key Habitat Conservation Plan area and is assessed per acre of habitat, not per dwelling unit.
    $0.00
Total (unincorporated Escambia County): $2,447.00
Sources last checked Official fee schedules:Emerald Coast Utilities Authority (ECUA) N/A Escambia County

Where in Escambia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Escambia County$7,458.00*this page
Century$0.00Includes unconfirmed feesPensacola$7,458.00*

Unincorporated Escambia County: Commercial Impact Fees

Commercial development in unincorporated Escambia County pays no per-square-foot impact fees, but owes $7,458.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $7,458.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter ($4,832.00 one-time) and Water Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter ($2,626.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Escambia County impact fee schedule
Water$2,626.00 one-time
  • Water Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter
    Emerald Coast Utilities Authority (ECUA)
    Commercial water capacity impact fee for a 1-inch meter, the standard nonresidential size, effective October 1, 2025. ECUA is the water and wastewater provider for both unincorporated Escambia County and the City of Pensacola (the Town of Century runs its own separate system). A separate connection fee applies in addition. Meters larger than 1 inch require a large-meter contract and are priced on average daily flow.
    $2,626.00 one-time
Sewer$4,832.00 one-time
  • Sewer Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter
    Emerald Coast Utilities Authority (ECUA)
    Commercial sewer capacity impact fee for a 1-inch meter, the standard nonresidential size, effective October 1, 2025. ECUA is the wastewater provider for both unincorporated Escambia County and the City of Pensacola (the Town of Century runs its own separate system). A separate connection fee applies in addition. Meters larger than 1 inch require a large-meter contract and are priced on average daily flow.
    $4,832.00 one-time
Total (unincorporated Escambia County): $7,458.00 one-time (≈ $7,458.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Emerald Coast Utilities Authority (ECUA) N/A Escambia County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Escambia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Escambia County$7,458.00*this page
Century$0.00Includes unconfirmed feesPensacola$7,458.00*

Unincorporated Escambia County: Industrial Impact Fees

Industrial development in unincorporated Escambia County pays no per-square-foot impact fees, but owes $7,458.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $7,458.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter ($4,832.00 one-time) and Water Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter ($2,626.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Escambia County impact fee schedule
Water$2,626.00 one-time
  • Water Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter
    Emerald Coast Utilities Authority (ECUA)
    Commercial water capacity impact fee for a 1-inch meter, the standard nonresidential size, effective October 1, 2025. ECUA is the water and wastewater provider for both unincorporated Escambia County and the City of Pensacola (the Town of Century runs its own separate system). A separate connection fee applies in addition. Meters larger than 1 inch require a large-meter contract and are priced on average daily flow.
    $2,626.00 one-time
Sewer$4,832.00 one-time
  • Sewer Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter
    Emerald Coast Utilities Authority (ECUA)
    Commercial sewer capacity impact fee for a 1-inch meter, the standard nonresidential size, effective October 1, 2025. ECUA is the wastewater provider for both unincorporated Escambia County and the City of Pensacola (the Town of Century runs its own separate system). A separate connection fee applies in addition. Meters larger than 1 inch require a large-meter contract and are priced on average daily flow.
    $4,832.00 one-time
Total (unincorporated Escambia County): $7,458.00 one-time (≈ $7,458.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Emerald Coast Utilities Authority (ECUA) N/A Escambia County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Escambia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Escambia County$7,458.00*this page
Century$0.00Includes unconfirmed feesPensacola$7,458.00*

Unincorporated Escambia County: Office Impact Fees

Office development in unincorporated Escambia County pays no per-square-foot impact fees, but owes $7,458.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $7,458.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter ($4,832.00 one-time) and Water Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter ($2,626.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Escambia County impact fee schedule
Water$2,626.00 one-time
  • Water Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter
    Emerald Coast Utilities Authority (ECUA)
    Commercial water capacity impact fee for a 1-inch meter, the standard nonresidential size, effective October 1, 2025. ECUA is the water and wastewater provider for both unincorporated Escambia County and the City of Pensacola (the Town of Century runs its own separate system). A separate connection fee applies in addition. Meters larger than 1 inch require a large-meter contract and are priced on average daily flow.
    $2,626.00 one-time
Sewer$4,832.00 one-time
  • Sewer Capacity Impact Fee (ECUA, Escambia County - Unincorporated) — 1" meter
    Emerald Coast Utilities Authority (ECUA)
    Commercial sewer capacity impact fee for a 1-inch meter, the standard nonresidential size, effective October 1, 2025. ECUA is the wastewater provider for both unincorporated Escambia County and the City of Pensacola (the Town of Century runs its own separate system). A separate connection fee applies in addition. Meters larger than 1 inch require a large-meter contract and are priced on average daily flow.
    $4,832.00 one-time
County$0.00
Total (unincorporated Escambia County): $7,458.00 one-time (≈ $7,458.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Emerald Coast Utilities Authority (ECUA) N/A Escambia County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Escambia County impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Escambia County impact fee FAQs

What are single-family impact fees in Escambia County, Florida?

A new single-family home in unincorporated Escambia County pays $2,447.00 per unit in impact fees (rates sourced July 12, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Escambia County?

Multifamily development in unincorporated Escambia County pays $2,447.00 per unit in impact fees (rates sourced July 12, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Escambia County?

Commercial development in unincorporated Escambia County pays no per-square-foot impact fees, but owes $7,458.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Do cities in Escambia County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 1 of 2 cities in Escambia County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000