Century Impact Fees by Project Type
Century: Single-Family Impact Fees
A new single-family home in Century pays at least $1,000.00 per unit in impact fees (rates sourced October 17, 2026). Every line item is levied at the municipal or utility level.
Sewer Connection Fee (Town of Century) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (Town of Century) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Century Impact Fee Schedule
- Water Connection Fee (Town of Century)Requires confirmationTown of CenturyThe Town of Century operates its own water system (not ECUA). The one-time water connection/capacity fee is set by Town Council resolution and is not published in the town code or an online fee schedule.
- Sewer Connection Fee (Town of Century)$1,000.00Requires confirmation5/8" meterTown of CenturyThe Town of Century operates its own wastewater system (not ECUA). The town code (Sec. 66-92) sets a one-time sewer connection fee for new development by water meter size: $1,000 for a 5/8-inch meter, $1,800 for 1-inch, $2,500 for 1.5-inch and $3,100 for 2-inch (schedule adopted in 1991).
- City Impact Fee (Town of Century)$0.00Town of CenturyThe Town of Century does not levy any municipal impact fee. The town publishes no impact fee schedule, and its concurrency provisions create no per-unit fee. Escambia County likewise levies no general development impact fee.
- County Impact Fee (Escambia County)$0.00Escambia CountyEscambia County levies no development impact fee, and none applies within the Town of Century.
Where in Escambia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century: Multifamily Impact Fees
A new multifamily unit in Century pays at least $1,000.00 per unit in impact fees (rates sourced October 17, 2026). Every line item is levied at the municipal or utility level.
Sewer Connection Fee (Town of Century, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (Town of Century, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Century Impact Fee Schedule
- Water Connection Fee (Town of Century, MF)Requires confirmationTown of CenturyThe Town of Century operates its own water system (not ECUA). The one-time water connection/capacity fee is set by Town Council resolution and is not published; the multifamily basis (per-unit vs. master-meter) is likewise not published.
- Sewer Connection Fee (Town of Century, MF)$1,000.00Requires confirmationTown of CenturyThe Town of Century operates its own wastewater system (not ECUA). The town code (Sec. 66-92) sets a one-time sewer connection fee for new multifamily development of $1,000 per dwelling unit at any meter size (schedule adopted in 1991). The town requires separate connections and meters for each residential unit.
- City Impact Fee (Town of Century, MF)$0.00Town of CenturyThe Town of Century does not levy any municipal impact fee. The town code has no impact fee chapter, and its concurrency provisions create no per-unit fee. Escambia County likewise levies no general development impact fee.
- County Impact Fee (Escambia County, MF)$0.00Escambia CountyEscambia County levies no development impact fee, and none applies within the Town of Century.
Where in Escambia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century: Commercial Impact Fees
Commercial development in Century pays no per-square-foot impact fees, but owes $2,500.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 50,000 sq ft building, that comes to at least $2,500.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Century) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (Town of Century) is set by the utility and not published online. City Impact Fee (Town of Century, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Century Impact Fee Schedule
- Water Connection Fee (Town of Century)Requires confirmationTown of CenturyThe Town of Century runs its own water system (not ECUA). Its code lets the town council set the water connection charge, and no current nonresidential water connection or tap fee amount is published.
- Sewer Connection Fee (Town of Century)$2,500.00 one-timeRequires confirmation1" meterTown of CenturyTown of Century connection fee for new nonresidential development, set by water meter size in the town code (Sec. 66-92, schedule adopted in 1991): $1,000 for a 5/8-inch meter, $2,500 for a 1-inch meter, $7,000 for a 1.5-inch meter and $15,000 for a 2-inch meter. The town runs its own water and sewer system (not ECUA).
- City Impact Fee (Town of Century, Commercial)Requires confirmationTown of CenturyThe Town of Century's code contains no municipal impact fee for commercial development; its concurrency rules allow impact fee credits but impose no fee. Escambia County likewise levies no general development impact fee.
- County Impact Fee (Escambia County, Commercial)$0.00Escambia CountyEscambia County levies no development impact fee on commercial development, and none applies within the Town of Century.
Where in Escambia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century: Industrial Impact Fees
Industrial development in Century pays no per-square-foot impact fees, but owes $2,500.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 50,000 sq ft building, that comes to at least $2,500.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Century) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (Town of Century) is set by the utility and not published online. City Impact Fee (Town of Century, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Century Impact Fee Schedule
- Water Connection Fee (Town of Century)Requires confirmationTown of CenturyThe Town of Century runs its own water system (not ECUA). Its code lets the town council set the water connection charge, and no current nonresidential water connection or tap fee amount is published.
- Sewer Connection Fee (Town of Century)$2,500.00 one-timeRequires confirmation1" meterTown of CenturyTown of Century connection fee for new nonresidential development, set by water meter size in the town code (Sec. 66-92, schedule adopted in 1991): $1,000 for a 5/8-inch meter, $2,500 for a 1-inch meter, $7,000 for a 1.5-inch meter and $15,000 for a 2-inch meter. The town runs its own water and sewer system (not ECUA).
- City Impact Fee (Town of Century, Industrial)Requires confirmationTown of CenturyThe Town of Century's code contains no municipal impact fee for industrial development; its concurrency rules allow impact fee credits but impose no fee. Escambia County likewise levies no general development impact fee.
- County Impact Fee (Escambia County, Industrial)$0.00Escambia CountyEscambia County levies no development impact fee on industrial development, and none applies within the Town of Century.
Where in Escambia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century: Office Impact Fees
Office development in Century pays no per-square-foot impact fees, but owes $2,500.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 25,000 sq ft building, that comes to at least $2,500.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Century) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (Town of Century) is set by the utility and not published online. City Impact Fee (Town of Century, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Century Impact Fee Schedule
- Water Connection Fee (Town of Century)Requires confirmationTown of CenturyThe Town of Century runs its own water system (not ECUA). Its code lets the town council set the water connection charge, and no current nonresidential water connection or tap fee amount is published.
- Sewer Connection Fee (Town of Century)$2,500.00 one-timeRequires confirmation1" meterTown of CenturyTown of Century connection fee for new nonresidential development, set by water meter size in the town code (Sec. 66-92, schedule adopted in 1991): $1,000 for a 5/8-inch meter, $2,500 for a 1-inch meter, $7,000 for a 1.5-inch meter and $15,000 for a 2-inch meter. The town runs its own water and sewer system (not ECUA).
- City Impact Fee (Town of Century, Office)Requires confirmationTown of CenturyThe Town of Century's code contains no municipal impact fee for office development; its concurrency rules allow impact fee credits but impose no fee. Escambia County likewise levies no general development impact fee.
- County Impact Fee (Escambia County, Office)$0.00Escambia CountyEscambia County levies no development impact fee on office development, and none applies within the Town of Century.
Where in Escambia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.
Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Century Impact Fee FAQs
What are the total impact fees for a single-family home in Century, Florida?
A new single-family home in Century pays at least $1,000.00 per unit in combined impact fees (rates sourced October 17, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Century?
Commercial development in Century pays no per-square-foot impact fees, but owes $2,500.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Century charge its own impact fees?
Yes. Century levies its own municipal impact or utility fees. Escambia County does not currently add county-level impact fees inside Century. The schedule on this page shows every fee that applies to development in Century.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Escambia County impact fees page.