Century impact fees by project type
Century: Single-Family Impact Fees
Century has no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The schedule below documents the status of each fee.
Sewer Connection Fee (Town of Century) and Water Connection Fee (Town of Century) are set by the utility and not published online. City Impact Fee (Town of Century) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Century)Requires confirmationTown of CenturyTown of Century operates its own water system (NOT ECUA). One-time connection/capacity fee is set by Council resolution and is NOT published: the Town's Water & Wastewater page posts no fee schedule, the Document Library has no rate/fee document, and the Municode code is stale (Supp. 6, codified only through Ord. 01-19, 2/18/2019). Re-checked 7/11/2026 — still unpublished. ⚠️ Confirm amount with Town Hall / Utilities, (850) 256-3208.
- Sewer Connection Fee (Town of Century)Requires confirmationTown of CenturyTown of Century operates its own wastewater system (not ECUA). One-time connection/capacity fee is set by Council resolution and is NOT published: the Town's Water & Wastewater page posts no fee schedule, the Town's Document Library has no fee/rate document, and the Municode code is stale (Supp. 6, codified only through Ord. 01-19, 2/18/2019) with no utility fee schedule. Re-checked 7/11/2026 — still unpublished. ⚠️ Confirm amount with Town Hall / Utilities, (850) 256-3208.
- City Impact Fee (Town of Century)Requires confirmationTown of Century$0 — no Town of Century development impact fee found. Caveat (7/11/2026): Century's Municode code is only current through Ord. 01-19 (2/18/2019, Supp. 6) and the Town posts no fee schedule on its website or in its Document Library, so 'no impact fee' cannot be confirmed from a current source — flagged Unconfirmed rather than confirmed $0. None expected for a town of ~1,700. ⚠️ Confirm with Town Hall (850) 256-3208.
- County Impact Fee (Escambia County)$0.00Escambia CountyCONFIRMED $0 — Escambia County levies no development impact fee; none applies within the Town of Century. Re-proved 7/11/2026 from primary sources (prior source was a news article): County Code Ch. 14, Art. XI (Ord. No. 2024-1, 1-9-2024) enumerates all county fees with no impact fee; the Land Development Code has no impact-fee chapter (Supp. 112, through Ord. 2025-42, 1/23/2026).
Where in Escambia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century: Multifamily Impact Fees
Century has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Town of Century, MF) and Sewer Connection Fee (Town of Century, MF) are set by the utility and not published online. City Impact Fee (Town of Century, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Century, MF)Requires confirmationTown of CenturyTown of Century operates its own water system (NOT ECUA). One-time connection/capacity fee set by Council resolution and NOT published — no fee schedule on the Town website or in its Document Library; Municode code stale (Supp. 6, through Ord. 01-19, 2/18/2019). Re-checked 7/11/2026, still unpublished. MF per-unit vs. master-meter basis also unknown. ⚠️ Confirm with Town Hall / Utilities (850) 256-3208.
- Sewer Connection Fee (Town of Century, MF)Requires confirmationTown of CenturyTown of Century operates its own wastewater system (not ECUA). One-time connection/capacity fee set by Council resolution and NOT published — no fee schedule on the Town website or in its Document Library; Municode code stale (Supp. 6, through Ord. 01-19, 2/18/2019). Re-checked 7/11/2026, still unpublished. MF per-unit basis also unknown. ⚠️ Confirm with Town Hall / Utilities (850) 256-3208.
- City Impact Fee (Town of Century, MF)Requires confirmationTown of Century$0 — no Town of Century development impact fee found. Caveat (7/11/2026): Century's Municode code is only current through Ord. 01-19 (2/18/2019, Supp. 6) and the Town posts no fee schedule, so 'no impact fee' cannot be confirmed from a current source — flagged Unconfirmed rather than confirmed $0. None expected for a town of ~1,700. ⚠️ Confirm with Town Hall (850) 256-3208.
- County Impact Fee (Escambia County, MF)$0.00Escambia CountyCONFIRMED $0 — Escambia County levies no development impact fee; none applies within the Town of Century. Re-proved 7/11/2026 from primary sources (prior source was a news article): County Code Ch. 14, Art. XI (Ord. No. 2024-1, 1-9-2024) enumerates all county fees with no impact fee; the Land Development Code has no impact-fee chapter (Supp. 112, through Ord. 2025-42, 1/23/2026).
Where in Escambia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century: Commercial Impact Fees
Commercial development in Century pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Century) and Sewer Connection Fee (Town of Century) are set by the utility and not published online. City Impact Fee (Town of Century, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Century)Requires confirmationTown of CenturyTown of Century operates its own water system (NOT ECUA). The one-time nonresidential water connection/tap fee is set by Council resolution and is NOT PUBLISHED anywhere. Re-verified 7/12/2026 (audit): Town's Water & Wastewater page, Document Library, Forms & Applications page, and Planning & Zoning page all post NO fee schedule; Municode remains stale (Supp. 6, through Ord. 01-19, 2/18/2019). NEW EVIDENCE — Florida Rural Water Association Utility Rate Study 'Century 26 (gradual increase)', completed 2/10/2026 (posted to the Town's MCC meeting portal, not its website): its Capital Financing Plan lists 'Water Tap Fee' as an actual revenue line ($1,200 in FY2025), PROVING a tap fee is charged, but the study's Rate Schedule publishes only Residential Single Family 5/8" and the contract Century C.I. class — NO commercial meter-size table and NO tap-fee amount anywhere. Study covers monthly rates only (DW increases eff. 4/1/2026); it is not an impact-fee schedule. $0 is a placeholder, not a confirmed rate. ⚠️ Confirm nonresidential water tap/connection fee by meter size with Town Hall / Utilities, (850) 256-3208. Future runs: search the Town's MCC meeting portal (mccmeetingspublic.blob.core.usgovcloudapi.net, centuryfl) for fee resolutions — Century's ordinances/resolutions are published there, not in Municode.
- Sewer Connection Fee (Town of Century)Requires confirmationTown of CenturyTown of Century operates its own wastewater system (NOT ECUA). The one-time nonresidential sewer connection/tap fee is set by Council resolution and is NOT PUBLISHED anywhere. Re-verified 7/12/2026 (audit): Town's Water & Wastewater page, Document Library, Forms & Applications page, and Planning & Zoning page all post NO fee schedule; Municode remains stale (Supp. 6, through Ord. 01-19, 2/18/2019). NEW EVIDENCE — Florida Rural Water Association Utility Rate Study 'Century 26 (gradual increase)', completed 2/10/2026 (posted to the Town's MCC meeting portal, not its website): its Capital Financing Plan lists 'Sewer Tap in Fees' as an actual revenue line ($3,700 in FY2025), PROVING a tap fee is charged, but the study's Rate Schedule publishes only Residential Single Family 5/8" and the contract Century C.I. class — NO commercial meter-size table and NO tap-fee amount anywhere. Study covers monthly rates only (WW increases eff. 4/1/2026); it is not an impact-fee schedule. $0 is a placeholder, not a confirmed rate. ⚠️ Confirm nonresidential sewer tap/connection fee with Town Hall / Utilities, (850) 256-3208. Future runs: search the Town's MCC meeting portal (mccmeetingspublic.blob.core.usgovcloudapi.net, centuryfl) for fee resolutions — Century's ordinances/resolutions are published there, not in Municode.
- City Impact Fee (Town of Century, Commercial)Requires confirmationTown of Century$0 — no Town of Century nonresidential development impact fee found. UNCONFIRMED: Century's Municode code is current only through Ord. 01-19 (2/18/2019, Supp. 6) and the Town posts no fee schedule, so 'no impact fee' cannot be proved from a current source. None expected for a town of ~1,700. Re-verified 7/12/2026 (audit): re-checked Municode (still stale), the Town's Document Library, Forms & Applications page, and Planning & Zoning page (which posts only land-use/land-disturbing applications with no fee amounts) — no impact or development fee anywhere. Note the Town DOES adopt ordinances outside Municode (e.g. Ord. 08-2025) via its MCC meeting portal (mccmeetingspublic.blob.core.usgovcloudapi.net, centuryfl) — searched, no fee ordinance found. ⚠️ Confirm with Town Hall, (850) 256-3208.
- County Impact Fee (Escambia County, Commercial)$0.00Escambia CountyCONFIRMED $0 — Escambia County levies NO development impact fee of any kind; none applies inside the Town of Century. Verified 7/12/2026: County Code Ch. 14, Art. XI, Sec. 14-164 (Ord. No. 2024-1, 1-9-2024) enumerates all county fees with no impact fee; the Land Development Code has no impact-fee chapter (Supp. 112, through Ord. 2025-42, 1/23/2026).
Where in Escambia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century: Industrial Impact Fees
Industrial development in Century pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Century) and Sewer Connection Fee (Town of Century) are set by the utility and not published online. City Impact Fee (Town of Century, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Century)Requires confirmationTown of CenturyTown of Century operates its own water system (NOT ECUA). The one-time nonresidential water connection/tap fee is set by Council resolution and is NOT PUBLISHED anywhere. Re-verified 7/12/2026 (audit): Town's Water & Wastewater page, Document Library, Forms & Applications page, and Planning & Zoning page all post NO fee schedule; Municode remains stale (Supp. 6, through Ord. 01-19, 2/18/2019). NEW EVIDENCE — Florida Rural Water Association Utility Rate Study 'Century 26 (gradual increase)', completed 2/10/2026 (posted to the Town's MCC meeting portal, not its website): its Capital Financing Plan lists 'Water Tap Fee' as an actual revenue line ($1,200 in FY2025), PROVING a tap fee is charged, but the study's Rate Schedule publishes only Residential Single Family 5/8" and the contract Century C.I. class — NO commercial meter-size table and NO tap-fee amount anywhere. Study covers monthly rates only (DW increases eff. 4/1/2026); it is not an impact-fee schedule. $0 is a placeholder, not a confirmed rate. ⚠️ Confirm nonresidential water tap/connection fee by meter size with Town Hall / Utilities, (850) 256-3208. Future runs: search the Town's MCC meeting portal (mccmeetingspublic.blob.core.usgovcloudapi.net, centuryfl) for fee resolutions — Century's ordinances/resolutions are published there, not in Municode.
- Sewer Connection Fee (Town of Century)Requires confirmationTown of CenturyTown of Century operates its own wastewater system (NOT ECUA). The one-time nonresidential sewer connection/tap fee is set by Council resolution and is NOT PUBLISHED anywhere. Re-verified 7/12/2026 (audit): Town's Water & Wastewater page, Document Library, Forms & Applications page, and Planning & Zoning page all post NO fee schedule; Municode remains stale (Supp. 6, through Ord. 01-19, 2/18/2019). NEW EVIDENCE — Florida Rural Water Association Utility Rate Study 'Century 26 (gradual increase)', completed 2/10/2026 (posted to the Town's MCC meeting portal, not its website): its Capital Financing Plan lists 'Sewer Tap in Fees' as an actual revenue line ($3,700 in FY2025), PROVING a tap fee is charged, but the study's Rate Schedule publishes only Residential Single Family 5/8" and the contract Century C.I. class — NO commercial meter-size table and NO tap-fee amount anywhere. Study covers monthly rates only (WW increases eff. 4/1/2026); it is not an impact-fee schedule. $0 is a placeholder, not a confirmed rate. ⚠️ Confirm nonresidential sewer tap/connection fee with Town Hall / Utilities, (850) 256-3208. Future runs: search the Town's MCC meeting portal (mccmeetingspublic.blob.core.usgovcloudapi.net, centuryfl) for fee resolutions — Century's ordinances/resolutions are published there, not in Municode.
- City Impact Fee (Town of Century, Industrial)Requires confirmationTown of Century$0 — no Town of Century nonresidential development impact fee found. UNCONFIRMED: Municode code stale (through Ord. 01-19, 2/18/2019, Supp. 6); Town posts no fee schedule. Re-verified 7/12/2026 (audit): re-checked Municode, Document Library, Forms & Applications, and Planning & Zoning pages — no impact or development fee anywhere. Town adopts ordinances outside Municode via its MCC meeting portal (centuryfl) — searched, no fee ordinance found. ⚠️ Confirm with Town Hall, (850) 256-3208.
- County Impact Fee (Escambia County, Industrial)$0.00Escambia CountyCONFIRMED $0 — Escambia County levies NO development impact fee of any kind; none applies inside the Town of Century. Verified 7/12/2026: County Code Ch. 14, Art. XI, Sec. 14-164 (Ord. No. 2024-1, 1-9-2024) enumerates all county fees with no impact fee; the Land Development Code has no impact-fee chapter (Supp. 112, through Ord. 2025-42, 1/23/2026).
Where in Escambia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Century: Office Impact Fees
Office development in Century pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Century) and Sewer Connection Fee (Town of Century) are set by the utility and not published online. City Impact Fee (Town of Century, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Century)Requires confirmationTown of CenturyTown of Century operates its own water system (NOT ECUA). The one-time nonresidential water connection/tap fee is set by Council resolution and is NOT PUBLISHED anywhere. Re-verified 7/12/2026 (audit): Town's Water & Wastewater page, Document Library, Forms & Applications page, and Planning & Zoning page all post NO fee schedule; Municode remains stale (Supp. 6, through Ord. 01-19, 2/18/2019). NEW EVIDENCE — Florida Rural Water Association Utility Rate Study 'Century 26 (gradual increase)', completed 2/10/2026 (posted to the Town's MCC meeting portal, not its website): its Capital Financing Plan lists 'Water Tap Fee' as an actual revenue line ($1,200 in FY2025), PROVING a tap fee is charged, but the study's Rate Schedule publishes only Residential Single Family 5/8" and the contract Century C.I. class — NO commercial meter-size table and NO tap-fee amount anywhere. Study covers monthly rates only (DW increases eff. 4/1/2026); it is not an impact-fee schedule. $0 is a placeholder, not a confirmed rate. ⚠️ Confirm nonresidential water tap/connection fee by meter size with Town Hall / Utilities, (850) 256-3208. Future runs: search the Town's MCC meeting portal (mccmeetingspublic.blob.core.usgovcloudapi.net, centuryfl) for fee resolutions — Century's ordinances/resolutions are published there, not in Municode.
- Sewer Connection Fee (Town of Century)Requires confirmationTown of CenturyTown of Century operates its own wastewater system (NOT ECUA). The one-time nonresidential sewer connection/tap fee is set by Council resolution and is NOT PUBLISHED anywhere. Re-verified 7/12/2026 (audit): Town's Water & Wastewater page, Document Library, Forms & Applications page, and Planning & Zoning page all post NO fee schedule; Municode remains stale (Supp. 6, through Ord. 01-19, 2/18/2019). NEW EVIDENCE — Florida Rural Water Association Utility Rate Study 'Century 26 (gradual increase)', completed 2/10/2026 (posted to the Town's MCC meeting portal, not its website): its Capital Financing Plan lists 'Sewer Tap in Fees' as an actual revenue line ($3,700 in FY2025), PROVING a tap fee is charged, but the study's Rate Schedule publishes only Residential Single Family 5/8" and the contract Century C.I. class — NO commercial meter-size table and NO tap-fee amount anywhere. Study covers monthly rates only (WW increases eff. 4/1/2026); it is not an impact-fee schedule. $0 is a placeholder, not a confirmed rate. ⚠️ Confirm nonresidential sewer tap/connection fee with Town Hall / Utilities, (850) 256-3208. Future runs: search the Town's MCC meeting portal (mccmeetingspublic.blob.core.usgovcloudapi.net, centuryfl) for fee resolutions — Century's ordinances/resolutions are published there, not in Municode.
- City Impact Fee (Town of Century, Office)Requires confirmationTown of Century$0 — no Town of Century nonresidential development impact fee found. UNCONFIRMED: Municode code stale (through Ord. 01-19, 2/18/2019, Supp. 6); Town posts no fee schedule. Re-verified 7/12/2026 (audit): re-checked Municode, Document Library, Forms & Applications, and Planning & Zoning pages — no impact or development fee anywhere. Town adopts ordinances outside Municode via its MCC meeting portal (centuryfl) — searched, no fee ordinance found. ⚠️ Confirm with Town Hall, (850) 256-3208.
- County Impact Fee (Escambia County, Office)$0.00Escambia CountyCONFIRMED $0 — Escambia County levies NO development impact fee of any kind; none applies inside the Town of Century. Verified 7/12/2026: County Code Ch. 14, Art. XI, Sec. 14-164 (Ord. No. 2024-1, 1-9-2024) enumerates all county fees with no impact fee; the Land Development Code has no impact-fee chapter (Supp. 112, through Ord. 2025-42, 1/23/2026).
Where in Escambia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Century
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
How much are commercial impact fees in Century?
Century does not currently levy impact fees on commercial development.
Does Century charge its own impact fees?
Yes. Century levies its own municipal impact or utility fees. Escambia County does not currently add county-level impact fees inside Century. The schedule on this page shows every fee that applies to development in Century.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Escambia County impact fees page.