Bell impact fees by project type
Bell: Single-Family Impact Fees
Bell has no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Town of Bell) is set by the utility and not published online. City Impact Fee (Town of Bell) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bell impact fee schedule
- Water Connection Fee (Town of Bell)Requires confirmationTown of BellThe Town of Bell may operate a small municipal water system but publishes no connection or capacity fee schedule. Any one-time water charge for a new connection is not publicly documented.
- Sewer Connection Fee (Town of Bell)$0.00Town of BellThe Town of Bell does not operate a sanitary sewer system. State wastewater records list no municipal treatment facility for the town, and development in Bell is served by on-site septic systems, so the town levies no sewer connection charge.
- City Impact Fee (Town of Bell)Requires confirmationTown of BellNo municipal impact fee has been identified for the Town of Bell, which publishes no ordinance list or fee schedule. Gilchrist County's impact fees are separately suspended.
- County Impact Fee (Gilchrist County, in Bell)$0.00Gilchrist CountyGilchrist County's impact fees (Capital Facilities, Road, and School) have been suspended since January 1, 2012 under LDC Sec. 11.01.01(b); $0 is collected within the Town of Bell until the County Commission adopts an ordinance reinstating them.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bell: Multifamily Impact Fees
Bell has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Town of Bell, MF) is set by the utility and not published online. City Impact Fee (Town of Bell, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bell impact fee schedule
- Water Connection Fee (Town of Bell, MF)Requires confirmationTown of BellThe Town of Bell may operate a small municipal water system but publishes no connection or capacity fee schedule; neither the fee nor its multifamily basis (per unit vs. master meter) is publicly documented.
- Sewer Connection Fee (Town of Bell, MF)$0.00Town of BellThe Town of Bell does not operate a sanitary sewer system. State wastewater records list no municipal treatment facility for the town and development is served by on-site septic systems, so there is no per-unit sewer connection charge for multifamily development.
- City Impact Fee (Town of Bell, MF)Requires confirmationTown of BellNo municipal impact fee has been identified for the Town of Bell, which publishes no ordinance list or fee schedule. Gilchrist County's impact fees are separately suspended.
- County Impact Fee (Gilchrist County, in Bell, MF)$0.00Gilchrist CountyGilchrist County's impact fees (Capital Facilities, Road, and School) have been suspended since January 1, 2012 under LDC Sec. 11.01.01(b); $0 per multifamily unit is collected within the Town of Bell until the County Commission adopts a reinstating ordinance.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bell: Commercial Impact Fees
Commercial development in Bell pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Bell) and Sewer Connection Fee (Town of Bell) are set by the utility and not published online. City Impact Fee (Town of Bell, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bell impact fee schedule
- Water Connection Fee (Town of Bell)Requires confirmationTown of Bell
- Sewer Connection Fee (Town of Bell)Requires confirmationTown of Bell
- City Impact Fee (Town of Bell, Commercial)Requires confirmationTown of Bell
- County Impact Fee (Gilchrist County, in Bell, Commercial)$0.00Gilchrist CountyGilchrist County suspended collection of all impact fees effective January 1, 2012; none are currently collected. Should the County reinstate them, the adopted impact-fee schedule would apply.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bell: Industrial Impact Fees
Industrial development in Bell pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Bell) and Sewer Connection Fee (Town of Bell) are set by the utility and not published online. City Impact Fee (Town of Bell, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bell impact fee schedule
- Water Connection Fee (Town of Bell)Requires confirmationTown of Bell
- Sewer Connection Fee (Town of Bell)Requires confirmationTown of Bell
- City Impact Fee (Town of Bell, Industrial)Requires confirmationTown of Bell
- County Impact Fee (Gilchrist County, in Bell, Industrial)$0.00Gilchrist CountyGilchrist County suspended collection of all impact fees effective January 1, 2012; none are currently collected. Should the County reinstate them, the adopted impact-fee schedule would apply.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bell: Office Impact Fees
Office development in Bell pays no per-square-foot impact fees (rates sourced July 12, 2026).
Water Connection Fee (Town of Bell) and Sewer Connection Fee (Town of Bell) are set by the utility and not published online. City Impact Fee (Town of Bell, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bell impact fee schedule
- Water Connection Fee (Town of Bell)Requires confirmationTown of Bell
- Sewer Connection Fee (Town of Bell)Requires confirmationTown of Bell
- City Impact Fee (Town of Bell, Office)Requires confirmationTown of Bell
- County Impact Fee (Gilchrist County, in Bell, Office)$0.00Gilchrist CountyGilchrist County suspended collection of all impact fees effective January 1, 2012; none are currently collected. Should the County reinstate them, the adopted impact-fee schedule would apply.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bell impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Bell impact fee FAQs
How much are commercial impact fees in Bell?
Bell does not currently levy impact fees on commercial development.
Does Bell charge its own impact fees?
Yes. Bell levies its own municipal impact or utility fees. Gilchrist County does not currently add county-level impact fees inside Bell. The schedule on this page shows every fee that applies to development in Bell.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Gilchrist County impact fees page.