Trenton impact fees by project type
Trenton: Single-Family Impact Fees
Trenton has no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The schedule below documents the status of each fee.
Sewer Capacity Fee (City of Trenton) and Water Capacity Fee (City of Trenton) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Trenton impact fee schedule
- Water Capacity Fee (City of Trenton)Requires confirmationCity of TrentonThe City of Trenton operates its own water utility. The only published one-time charge for a new account is a $100 connection fee plus a refundable deposit (account setup, not a capacity or impact fee); no water capacity, system development, or impact fee is published.
- Sewer Capacity Fee (City of Trenton)Requires confirmationCity of TrentonThe City of Trenton operates its own wastewater system, billed at monthly rates. No sewer capacity, connection, or impact fee is published for new connections; the only one-time charge is a $100 account connection fee plus a refundable deposit.
- City Impact Fee (City of Trenton)$0.00City of TrentonThe City of Trenton levies no municipal impact fee; its code (Ch. 8) addresses only county fees, which are suspended.
- County Impact Fee (Gilchrist County, in Trenton)$0.00Gilchrist CountyWithin the City of Trenton, the county Road impact fee (Ord. 99-09) applies and the county Capital Facilities fee does not (Trenton Code Secs. 8-1, 8-2). All Gilchrist County impact fees are suspended (LDC Sec. 11.01.01(b), since Jan 1, 2012), so $0 is collected in Trenton.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Trenton: Multifamily Impact Fees
Trenton has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.
Sewer Capacity Fee (City of Trenton, MF) and Water Capacity Fee (City of Trenton, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Trenton impact fee schedule
- Water Capacity Fee (City of Trenton, MF)Requires confirmationCity of TrentonThe City of Trenton operates its own water utility. The only published one-time charge for a new account is a $100 connection fee plus a deposit (account setup, not a capacity or impact fee); no water capacity or impact fee is published, and for multifamily the basis would be master-meter if one existed.
- Sewer Capacity Fee (City of Trenton, MF)Requires confirmationCity of TrentonThe City of Trenton operates its own wastewater system, billed at monthly rates. No sewer capacity, connection, or impact fee is published; for multifamily the basis would be master-meter if one existed.
- City Impact Fee (City of Trenton, MF)$0.00City of TrentonThe City of Trenton levies no municipal impact fee; its code (Ch. 8) addresses only county fees, which are suspended. $0 per multifamily unit.
- County Impact Fee (Gilchrist County, in Trenton, MF)$0.00Gilchrist CountyWithin the City of Trenton, the county Road impact fee (Ord. 99-09) applies and the county Capital Facilities fee does not (Trenton Code Secs. 8-1, 8-2). All Gilchrist County impact fees are suspended (LDC Sec. 11.01.01(b), since Jan 1, 2012), so $0 per multifamily unit is collected in Trenton.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Trenton: Commercial Impact Fees
Commercial development in Trenton pays no per-square-foot impact fees (rates sourced July 12, 2026).
Sewer Capacity Fee (City of Trenton) and Water Capacity Fee (City of Trenton) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Trenton impact fee schedule
- Water Capacity Fee (City of Trenton)Requires confirmationCity of Trenton
- Sewer Capacity Fee (City of Trenton)Requires confirmationCity of Trenton
- City Impact Fee (City of Trenton, Commercial)$0.00City of Trenton
- County Impact Fee (Gilchrist County, in Trenton, Commercial)$0.00Gilchrist CountyGilchrist County suspended collection of all impact fees effective January 1, 2012; none are currently collected. Should the County reinstate them, the adopted impact-fee schedule would apply.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Trenton: Industrial Impact Fees
Industrial development in Trenton pays no per-square-foot impact fees (rates sourced July 12, 2026).
Sewer Capacity Fee (City of Trenton) and Water Capacity Fee (City of Trenton) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Trenton impact fee schedule
- Water Capacity Fee (City of Trenton)Requires confirmationCity of Trenton
- Sewer Capacity Fee (City of Trenton)Requires confirmationCity of Trenton
- City Impact Fee (City of Trenton, Industrial)$0.00City of Trenton
- County Impact Fee (Gilchrist County, in Trenton, Industrial)$0.00Gilchrist CountyGilchrist County suspended collection of all impact fees effective January 1, 2012; none are currently collected. Should the County reinstate them, the adopted impact-fee schedule would apply.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Trenton: Office Impact Fees
Office development in Trenton pays no per-square-foot impact fees (rates sourced July 12, 2026).
Sewer Capacity Fee (City of Trenton) and Water Capacity Fee (City of Trenton) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Trenton impact fee schedule
- Water Capacity Fee (City of Trenton)Requires confirmationCity of Trenton
- Sewer Capacity Fee (City of Trenton)Requires confirmationCity of Trenton
- City Impact Fee (City of Trenton, Office)$0.00City of Trenton
- County Impact Fee (Gilchrist County, in Trenton, Office)$0.00Gilchrist CountyGilchrist County suspended collection of all impact fees effective January 1, 2012; none are currently collected. Should the County reinstate them, the adopted impact-fee schedule would apply.
Where in Gilchrist County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Trenton impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Trenton impact fee FAQs
How much are commercial impact fees in Trenton?
Trenton does not currently levy impact fees on commercial development.
Does Trenton charge its own impact fees?
Yes. Trenton levies its own municipal impact or utility fees. Gilchrist County does not currently add county-level impact fees inside Trenton. The schedule on this page shows every fee that applies to development in Trenton.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Gilchrist County impact fees page.