Moore Haven, Florida Impact Fees

Moore Haven applies its own fee schedule: municipal fees plus the Glades County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $2,300.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Moore Haven impact fees by project type

Moore Haven: Single-Family Impact Fees

A new single-family home in Moore Haven pays at least $2,300.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Glades County-levied fees account for $2,000.00 and municipal or utility fees for $300.00.

The largest line items are Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU ($2,000.00) and Water Tap-in Fee (City of Moore Haven) ($300.00).

County Impact Fee (City of Moore Haven) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Moore Haven impact fee schedule
Water$300.00
  • Water Tap-in Fee (City of Moore Haven)
    3/4" meter
    City of Moore Haven
    The City of Moore Haven operates its own water utility. The one-time water tap-in fee is set by meter size: 3/4" $300, 1" $450, 1.5" $690, 2" $1,000, over 2" = cost of materials + $1,000. A single-family home on a 3/4" meter pays $300. No separate water capacity or system-development charge is levied (the $15 initial-connect is an account-activation charge, not a capital fee). Rate current as of the city's 5/21/2026 utilities schedule.
    $300.00
Sewer$2,000.00
  • Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU
    Moore Haven City/County Public Works Authority (CCPWA)
    Sewer in the Moore Haven area is provided by the Moore Haven City/County Public Works Authority (CCPWA). The one-time wastewater System Development Charge is $2,000.00 per ERU; a single-family home is 1 ERU (150 gpd design flow) = $2,000. Effective 10/27/2025 (CCPWA Resolution 2025-01, superseding all prior schedules); collected at building-permit application. Additional one-time charges apply: plan review $100/ERU and inspection $25.
    $2,000.00
City$0.00
  • City Impact Fee (City of Moore Haven)
    City of Moore Haven
    The City of Moore Haven has no municipal development impact fee program; its code contains no impact-fee chapter and only utility tap/connection charges apply, so $0.
    $0.00
County$0.00
  • County Impact Fee (City of Moore Haven)
    Glades County
    Glades County's Chapter 121 impact fees apply countywide, including inside Moore Haven, but their collection has been suspended. The suspension lapsed 3/13/2026 and on 6/22/2026 the County Commission voted to re-adopt Transportation, Parks & Recreation, Public Education and EMS impact fees. As of July 2026 the new schedule is not yet published or codified and collection has not resumed, so $0 is currently charged. For reference, the prior (2008) schedule assessed a single-family detached home about $10,493 total.
    Requires confirmation
Total (Moore Haven): $2,300.00
Sources last checked Official fee schedules:City of Moore Haven Moore Haven City/County Public Works Authority (CCPWA) Glades County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Glades County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Glades County$0.00Includes unconfirmed fees
Moore Haven$2,300.00this pageIncludes unconfirmed fees

Moore Haven: Multifamily Impact Fees

A new multifamily unit in Moore Haven pays at least $2,300.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Glades County-levied fees account for $2,000.00 and municipal or utility fees for $300.00.

The largest line items are Sewer System Development Charge (Moore Haven CCPWA, MF) — 1 ERU/unit × $2,000/ERU ($2,000.00) and Water Tap-in Fee (City of Moore Haven, MF) ($300.00).

County Impact Fee (City of Moore Haven, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Moore Haven impact fee schedule
Water$300.00
  • Water Tap-in Fee (City of Moore Haven, MF)
    3/4" meter
    City of Moore Haven
    The City of Moore Haven operates its own water utility. The one-time water tap-in fee is set by meter size: 3/4" $300, 1" $450, 1.5" $690, 2" $1,000, over 2" = materials + $1,000. A multifamily project on a master meter pays the fee for that meter size, so the effective per-unit amount depends on master-meter sizing; $300 shown as the 3/4" base. No separate per-unit water capacity charge is published. Rate current as of the city's 5/21/2026 utilities schedule.
    $300.00
Sewer$2,000.00
  • Sewer System Development Charge (Moore Haven CCPWA, MF) — 1 ERU/unit × $2,000/ERU
    Moore Haven City/County Public Works Authority (CCPWA)
    Sewer in the Moore Haven area is provided by the Moore Haven City/County Public Works Authority (CCPWA). The one-time wastewater System Development Charge is $2,000.00 per ERU (1 ERU = 150 gpd design flow). Multifamily is charged on the project's estimated ERUs; entered at 1 ERU per dwelling unit ($2,000/unit) as the floor — a larger unit's estimated flow can raise the per-unit charge. Effective 10/27/2025 (CCPWA Resolution 2025-01). Additional one-time charges: plan review $100/ERU and inspection $25.
    $2,000.00
City$0.00
  • City Impact Fee (City of Moore Haven, MF)
    City of Moore Haven
    The City of Moore Haven has no municipal development impact fee program; its code contains no impact-fee chapter and only utility tap/connection charges apply, so $0.
    $0.00
County$0.00
  • County Impact Fee (City of Moore Haven, MF)
    Glades County
    Glades County's Chapter 121 impact fees apply countywide, including inside Moore Haven, but their collection has been suspended. The suspension lapsed 3/13/2026 and on 6/22/2026 the County Commission voted to re-adopt Transportation, Parks & Recreation, Public Education and EMS impact fees. As of July 2026 the new schedule is not yet published or codified and collection has not resumed, so $0 per unit is currently charged. For reference, the prior (2008) schedule assessed a multifamily unit about $7,188 total (Education $2,716 + Roads $4,026 + Parks $363 + EMS $83).
    Requires confirmation
Total (Moore Haven): $2,300.00
Sources last checked Official fee schedules:City of Moore Haven Moore Haven City/County Public Works Authority (CCPWA) Glades County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Glades County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Glades County$0.00Includes unconfirmed fees
Moore Haven$2,300.00this pageIncludes unconfirmed fees

Moore Haven: Commercial Impact Fees

Commercial development in Moore Haven pays no per-square-foot impact fees, but owes $2,450.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $2,450.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU ($2,000.00 one-time) and Water Tap-in Fee (City of Moore Haven) — 1" meter ($450.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Emergency Medical Service Impact Fee (Glades County, Commercial) and Road Impact Fee (Glades County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Moore Haven impact fee schedule
Water$450.00 one-time
  • Water Tap-in Fee (City of Moore Haven) — 1" meter
    City of Moore Haven
    Water is provided by the City of Moore Haven. One-time water tap-in fee by meter size: 3/4" $300; 1" $450; 1.5" $690; 2" $1,000; over 2" is materials cost plus $1,000. This tap-in charge is the entire one-time water capital connection cost — no separate capacity or system-development fee is charged.
    $450.00 one-time
Sewer$2,000.00 one-time
  • Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU
    Moore Haven City/County Public Works Authority (CCPWA)
    Sanitary sewer is provided by the Moore Haven City/County Public Works Authority (CCPWA). The one-time System Development Charge is $2,000 per ERU (1 ERU = 150 gallons/day of design flow, with a 1.0-ERU minimum), so a nonresidential project pays its design flow ÷ 150 gpd × $2,000. Rate effective October 27, 2025 (CCPWA Resolution 2025-01).
    $2,000.00 one-time
City$0.00
County$0.00
  • Park Impact Fee (Glades County, Commercial)
    Glades County
    The County's adopted park impact fee schedule contains only residential land-use categories and does not reach nonresidential development, so no county park impact fee is charged. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Parks and Recreation impact fee; as of July 2026 no adopted schedule has been published.
    $0.00
  • Emergency Medical Service Impact Fee (Glades County, Commercial)
    Glades County
    No county EMS impact fee is currently collected. The temporary suspension of all impact-fee collection lapsed March 13, 2026 and has not been reinstated in collectible form. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Emergency Medical Services impact fee; as of July 2026 no adopted rate schedule or effective date has been published. Glades County impact fees apply countywide, including within the City of Moore Haven.
    Requires confirmation
  • Road Impact Fee (Glades County, Commercial)
    Glades County
    No county road/transportation impact fee is currently collected. The Board of County Commissioners' temporary suspension of all impact-fee collection lapsed March 13, 2026 and has not been reinstated in collectible form. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Transportation impact fee; as of July 2026 no adopted rate schedule or effective date has been published. Glades County impact fees apply countywide, including within the City of Moore Haven.
    Requires confirmation
Total (Moore Haven): $2,450.00 one-time (≈ $2,450.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Moore Haven Moore Haven City/County Public Works Authority (CCPWA) Glades County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Glades County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Glades County$0.00Includes unconfirmed fees
Moore Haven$2,450.00*this pageIncludes unconfirmed fees

Moore Haven: Industrial Impact Fees

Industrial development in Moore Haven pays no per-square-foot impact fees, but owes $2,450.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $2,450.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU ($2,000.00 one-time) and Water Tap-in Fee (City of Moore Haven) — 1" meter ($450.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Emergency Medical Service Impact Fee (Glades County, Industrial) and Road Impact Fee (Glades County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Moore Haven impact fee schedule
Water$450.00 one-time
  • Water Tap-in Fee (City of Moore Haven) — 1" meter
    City of Moore Haven
    Water is provided by the City of Moore Haven. One-time water tap-in fee by meter size: 3/4" $300; 1" $450; 1.5" $690; 2" $1,000; over 2" is materials cost plus $1,000. This tap-in charge is the entire one-time water capital connection cost — no separate capacity or system-development fee is charged.
    $450.00 one-time
Sewer$2,000.00 one-time
  • Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU
    Moore Haven City/County Public Works Authority (CCPWA)
    Sanitary sewer is provided by the Moore Haven City/County Public Works Authority (CCPWA). The one-time System Development Charge is $2,000 per ERU (1 ERU = 150 gallons/day of design flow, with a 1.0-ERU minimum), so a nonresidential project pays its design flow ÷ 150 gpd × $2,000. Rate effective October 27, 2025 (CCPWA Resolution 2025-01).
    $2,000.00 one-time
City$0.00
County$0.00
  • Park Impact Fee (Glades County, Industrial)
    Glades County
    The County's adopted park impact fee schedule contains only residential land-use categories and does not reach nonresidential development, so no county park impact fee is charged. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Parks and Recreation impact fee; as of July 2026 no adopted schedule has been published.
    $0.00
  • Emergency Medical Service Impact Fee (Glades County, Industrial)
    Glades County
    No county EMS impact fee is currently collected. The temporary suspension of all impact-fee collection lapsed March 13, 2026 and has not been reinstated in collectible form. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Emergency Medical Services impact fee; as of July 2026 no adopted rate schedule or effective date has been published. Glades County impact fees apply countywide, including within the City of Moore Haven.
    Requires confirmation
  • Road Impact Fee (Glades County, Industrial)
    Glades County
    No county road/transportation impact fee is currently collected. The Board of County Commissioners' temporary suspension of all impact-fee collection lapsed March 13, 2026 and has not been reinstated in collectible form. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Transportation impact fee; as of July 2026 no adopted rate schedule or effective date has been published. Glades County impact fees apply countywide, including within the City of Moore Haven.
    Requires confirmation
Total (Moore Haven): $2,450.00 one-time (≈ $2,450.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Moore Haven Moore Haven City/County Public Works Authority (CCPWA) Glades County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Glades County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Glades County$0.00Includes unconfirmed fees
Moore Haven$2,450.00*this pageIncludes unconfirmed fees

Moore Haven: Office Impact Fees

Office development in Moore Haven pays no per-square-foot impact fees, but owes $2,450.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to at least $2,450.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU ($2,000.00 one-time) and Water Tap-in Fee (City of Moore Haven) — 1" meter ($450.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Emergency Medical Service Impact Fee (Glades County, Office) and Road Impact Fee (Glades County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Moore Haven impact fee schedule
Water$450.00 one-time
  • Water Tap-in Fee (City of Moore Haven) — 1" meter
    City of Moore Haven
    Water is provided by the City of Moore Haven. One-time water tap-in fee by meter size: 3/4" $300; 1" $450; 1.5" $690; 2" $1,000; over 2" is materials cost plus $1,000. This tap-in charge is the entire one-time water capital connection cost — no separate capacity or system-development fee is charged.
    $450.00 one-time
Sewer$2,000.00 one-time
  • Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU
    Moore Haven City/County Public Works Authority (CCPWA)
    Sanitary sewer is provided by the Moore Haven City/County Public Works Authority (CCPWA). The one-time System Development Charge is $2,000 per ERU (1 ERU = 150 gallons/day of design flow, with a 1.0-ERU minimum), so a nonresidential project pays its design flow ÷ 150 gpd × $2,000. Rate effective October 27, 2025 (CCPWA Resolution 2025-01).
    $2,000.00 one-time
City$0.00
  • City Impact Fee (City of Moore Haven, Office)
    City of Moore Haven
    The City of Moore Haven levies no municipal impact or development fee; only utility connection charges apply. Glades County impact fees apply within the city.
    $0.00
County$0.00
  • Park Impact Fee (Glades County, Office)
    Glades County
    The County's adopted park impact fee schedule contains only residential land-use categories and does not reach nonresidential development, so no county park impact fee is charged. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Parks and Recreation impact fee; as of July 2026 no adopted schedule has been published.
    $0.00
  • Emergency Medical Service Impact Fee (Glades County, Office)
    Glades County
    No county EMS impact fee is currently collected. The temporary suspension of all impact-fee collection lapsed March 13, 2026 and has not been reinstated in collectible form. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Emergency Medical Services impact fee; as of July 2026 no adopted rate schedule or effective date has been published. Glades County impact fees apply countywide, including within the City of Moore Haven.
    Requires confirmation
  • Road Impact Fee (Glades County, Office)
    Glades County
    No county road/transportation impact fee is currently collected. The Board of County Commissioners' temporary suspension of all impact-fee collection lapsed March 13, 2026 and has not been reinstated in collectible form. The County noticed public hearings on June 9 and June 22, 2026 to adopt a new Transportation impact fee; as of July 2026 no adopted rate schedule or effective date has been published. Glades County impact fees apply countywide, including within the City of Moore Haven.
    Requires confirmation
Total (Moore Haven): $2,450.00 one-time (≈ $2,450.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Moore Haven Moore Haven City/County Public Works Authority (CCPWA) Glades County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Glades County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Glades County$0.00Includes unconfirmed fees
Moore Haven$2,450.00*this pageIncludes unconfirmed fees

Moore Haven impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Moore Haven impact fee FAQs

What are the total impact fees for a single-family home in Moore Haven, Florida?

A new single-family home in Moore Haven pays at least $2,300.00 per unit in combined impact fees (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Moore Haven?

Commercial development in Moore Haven pays no per-square-foot impact fees, but owes $2,450.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Moore Haven charge its own impact fees?

Yes. Moore Haven levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Moore Haven, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Glades County impact fees page.