Moore Haven impact fees by project type
Moore Haven: Single-Family Impact Fees
A new single-family home in Moore Haven pays at least $2,300.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Glades County-levied fees account for $2,000.00 and municipal or utility fees for $300.00.
The largest line items are Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU ($2,000.00) and Water Tap-in Fee (City of Moore Haven) ($300.00).
County Impact Fee (City of Moore Haven) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Tap-in Fee (City of Moore Haven)$300.00City of Moore HavenCONFIRMED — re-verified 7/12/2026 against the City of Moore Haven Utilities page (page last modified 5/21/2026). City operates its own water utility. Residential & Commercial Water Tap-in Fees: 3/4" meter $300.00; 1" $450.00; 1.5" $690.00; 2" $1,000.00; over 2" = total cost of materials + $1,000.00. SFR = 3/4" meter -> $300. No separate water capacity / system-development (impact) charge is published — the tap-in fee is the one-time connection charge (initial water connect fee of $15.00 is an account-activation charge, not a capital fee). Contact City Hall (863) 946-0711.
- Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU$2,000.00Moore Haven City/County Public Works Authority (CCPWA)CONFIRMED 7/12/2026. Sewer provided by the Moore Haven City/County Public Works Authority (CCPWA), a combined special district of the Glades County BOCC + City of Moore Haven. CCPWA Resolution No. 2025-01, adopted in special session 10/27/2025, effective immediately upon adoption and superseding all prior schedules. Exhibit A, Sec. A.4: System Development Charge / Capacity Charge = $2,000.00 per ERU. Sec. A.3: 1 ERU = 150 gallons/day design flow. SFR = 1 ERU -> $2,000. Sec. A.7: residential wastewater SDC is paid at time of building-permit application. Additional one-time charges: project plan review $100.00/ERU (Exhibit A, Sec. B.9), project inspection $25.00 (Sec. B.10). Source PDF is image-based; read via Google Docs viewer 7/12/2026 (https://moorehaven.org/wp-content/uploads/2026/01/CCPWA-RESOLUTION-NO.-2025-01-SIGNED.pdf). Contact CCPWA (863) 946-0711.
- City Impact Fee (City of Moore Haven)$0.00City of Moore HavenNo municipal development impact fee program. Moore Haven Code of Ordinances has no Impact Fees chapter (chapters reviewed: Ch. 32 Buildings, Ch. 115 Utilities, Ch. 125 Zoning, etc.) — consistent with small population (~1,500). Only utility tap/connection charges apply. $0 None.
- County Impact Fee (City of Moore Haven)Requires confirmationGlades CountySTATUS CHANGED — re-verified 7/12/2026. Glades County Ch. 121 impact fees apply COUNTYWIDE, including inside Moore Haven ('building permit' = one issued by the county OR any municipality within the county; interlocal collection agreements with municipalities). The temporary collection suspension (BOCC 3/11/2025) expired 3/13/2026 and was not re-extended; the BOCC held public hearings 6/9/2026 and 6/22/2026 and voted to adopt Transportation, Parks & Recreation, Public Education and EMS impact fees (county Public Notices page; WGCU 7/3/2026). Fees expected to begin collection within months; new rate schedule not yet published/codified. $0 retained because collection has not resumed as of 7/12/2026. REFERENCE — codified Ch. 121 schedule (Ord. 2008-33; 2008 Technical Memorandum): single-family detached = Education $4,265.00 + Roads $5,716.00 + Parks $390.85 + EMS $121.00 = $10,492.85. VERIFY new ordinance nos./schedule/effective date -> Glades County Community Development (863) 946-6020.
Where in Glades County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moore Haven: Multifamily Impact Fees
A new multifamily unit in Moore Haven pays at least $2,300.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Glades County-levied fees account for $2,000.00 and municipal or utility fees for $300.00.
Sewer System Development Charge (Moore Haven CCPWA, MF) — 1 ERU/unit × $2,000/ERU and Water Tap-in Fee (City of Moore Haven, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
County Impact Fee (City of Moore Haven, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Tap-in Fee (City of Moore Haven, MF)$300.00Requires confirmationCity of Moore HavenRate table CONFIRMED — re-verified 7/12/2026 on the City of Moore Haven Utilities page (modified 5/21/2026). City water utility; tap-in fee is meter-size based: 3/4" $300.00, 1" $450.00, 1.5" $690.00, 2" $1,000.00, over 2" = materials + $1,000.00. No separate per-unit water SDC is published. $300 entered as the 3/4" base; an MF project on a master meter will pay the larger meter-size fee, so the effective per-unit amount depends on master-meter size. VERIFY MF master-meter sizing -> City Hall (863) 946-0711.
- Sewer System Development Charge (Moore Haven CCPWA, MF) — 1 ERU/unit × $2,000/ERU$2,000.00Requires confirmationMoore Haven City/County Public Works Authority (CCPWA)Rate CONFIRMED 7/12/2026; MF per-unit ERU factor UNCONFIRMED. Sewer via the Moore Haven City/County Public Works Authority (CCPWA), a joint Glades County BOCC + City of Moore Haven special district. CCPWA Resolution No. 2025-01, adopted 10/27/2025, effective immediately and superseding all prior schedules. Exhibit A, Sec. A.4: System Development Charge / Capacity Charge = $2,000.00 per ERU; Sec. A.3: 1 ERU = 150 gpd design flow. Sec. B.8: the SDC 'shall be based upon the estimated ERUs to be provided to any new development or expansion' — the resolution sets no fixed MF-per-unit ERU factor. Entered at 1 ERU per dwelling unit = $2,000/unit, consistent with Exhibit A Sec. A.1 which bills master-metered MF dwelling units at the same base facility charge ($20.65) as a 5/8" single-family meter. Also one-time: plan review $100/ERU, inspection $25. VERIFY the ERU factor CCPWA actually assigns a 2BR/2BA apartment unit -> CCPWA (863) 946-0711. Image PDF read via Google Docs viewer 7/12/2026.
- City Impact Fee (City of Moore Haven, MF)$0.00City of Moore HavenNo municipal development impact fee program. Moore Haven Code of Ordinances has no Impact Fees chapter (Ch. 32 Buildings, Ch. 115 Utilities, Ch. 125 Zoning reviewed) — consistent with ~1,500 pop. Only utility tap/connection charges apply. $0 None.
- County Impact Fee (City of Moore Haven, MF)Requires confirmationGlades CountySTATUS CHANGED — re-verified 7/12/2026. Glades County Ch. 121 impact fees apply COUNTYWIDE, including inside Moore Haven ('building permit' = one issued by the county OR any municipality; interlocal collection agreements). The collection suspension (BOCC 3/11/2025) expired 3/13/2026 and was not re-extended; the BOCC held public hearings 6/9/2026 and 6/22/2026 and voted to adopt Transportation, Parks & Recreation, Public Education and EMS impact fees (county Public Notices page; WGCU 7/3/2026). Collection expected to begin within months; new rate schedule not yet published/codified. $0 retained because collection has not resumed as of 7/12/2026. REFERENCE — codified Ch. 121 MF (multifamily unit) schedule (Ord. 2008-33; 2008 Technical Memorandum): Education $2,716.00 + Roads $4,026.00 + Parks $363.12 + EMS $83.00 = $7,188.12 per unit. VERIFY new ordinance nos./schedule/effective date -> Glades County Community Development (863) 946-6020.
Where in Glades County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moore Haven: Commercial Impact Fees
Commercial development in Moore Haven pays no per-square-foot impact fees, but owes $2,450.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to at least $2,450.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU ($2,000.00 one-time) and Water Tap-in Fee (City of Moore Haven) — 1" meter ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Emergency Medical Service Impact Fee (Glades County, Commercial) and Road Impact Fee (Glades County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Tap-in Fee (City of Moore Haven) — 1" meter$450.00 one-timeCity of Moore HavenCONFIRMED — read directly off the City of Moore Haven Utilities page 7/12/2026. The city operates its own water utility. The posted table is titled 'Residential and Commercial Water Tap-in Fees' — ONE meter-size ladder serving all customer classes, so the nonresidential rate legitimately equals the residential rate at the same meter size (not residential-rate contamination). Full ladder: 3/4" = $300.00; 1" = $450.00; 1.5" = $690.00; 2" = $1,000.00; over 2" = total cost of materials + $1,000.00 (not a fixed amount — no record entered for that tier). Canonical nonres default = 1" meter = $450.00. NO separate water capacity / system-development (impact) charge is published — the tap-in fee is the entire one-time capital connection charge. The $15.00 'initial connect for water' is an account-activation charge, and the commercial water deposits ($50–$245 by meter size) and monthly base rates are refundable/recurring — none are capital fees, so none are entered. Contact City Hall (863) 946-0711. AUDIT 7/12/2026 — full tap-in ladder re-read off moorehaven.org/utilities and confirmed unchanged (3/4" $300 / 1" $450 / 1.5" $690 / 2" $1,000 / over 2" materials + $1,000). Shared residential+commercial ladder re-confirmed — the SFR match is the documented shared-table exception, not contamination. Default correctly sits on the 1" tier.
- Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU$2,000.00 one-timeMoore Haven City/County Public Works Authority (CCPWA)CONFIRMED 7/12/2026. Sewer is provided by the Moore Haven City/County Public Works Authority (CCPWA), a combined special district of the Glades County BOCC + City of Moore Haven. CCPWA Resolution No. 2025-01, adopted in special session 10/27/2025, effective on adoption, supersedes all prior schedules. Exhibit A Sec. A.4: System Development Charge / Capacity Charge = $2,000.00 per ERU. Sec. A.3: 1 ERU = 150 gallons/day design flow. NO meter-size table is published — nonresidential ERU count is derived from the project's design flow: ERUs = design flow (gpd) ÷ 150 gpd, with a 1.0-ERU minimum. Value stored is the published 1-ERU minimum ($2,000.00); multiply by the project's ERU count for a specific building. Additional one-time charges: project plan review $100.00/ERU (Exhibit A Sec. B.9) and project inspection $25.00 (Sec. B.10) — not capital capacity fees, not entered. Source PDF is image-based (https://moorehaven.org/wp-content/uploads/2026/01/CCPWA-RESOLUTION-NO.-2025-01-SIGNED.pdf); the city's own commercial sewer deposits and monthly base rates are recurring/refundable, not capital fees. Contact CCPWA (863) 946-0711.
- City Impact Fee (City of Moore Haven, Commercial)$0.00City of Moore HavenCONFIRMED $0 — verified 7/12/2026, re-verified on audit 7/12/2026. No municipal development impact fee program of any kind. The Moore Haven Code of Ordinances (Municode; codified through Ord. No. 360, adopted 3/18/2025, Supp. No. 9) contains NO impact-fee chapter — the full Part II chapter list (41 chapters, Ch. 26 through Ch. 125) was enumerated on audit and includes Ch. 34 Building Construction, Ch. 66 Land Development, Ch. 115 Utilities and Ch. 125 Zoning, but no impact/development-fee chapter. Consistent with the city's small size (~1,500 pop.). The only one-time development charges the city levies are utility tap-in/connection charges (see Water Sewer Fees - Nonresidential table). Glades County Ch. 121 fees apply countywide inside the city — see the County records. Contact City Hall (863) 946-0711.
- Park Impact Fee (Glades County, Commercial)$0.00Glades CountyCONFIRMED $0 — verified 7/12/2026. The Glades County park impact fee schedule (Ch. 121 Art. V §121-140) contains ONLY residential rows: single-family detached, multifamily, mobile home in a mobile home park, recreational vehicle, and motel/hotel per room. There are NO nonresidential (commercial/office/industrial) rows — the park impact fee does not reach general nonresidential development. Confirmed $0 independent of the county's collection suspension. Also note: the Public Education impact fee schedule (Ch. 121 Art. II §121-25, Ord. 2008-34) expressly reads 'Nonresidential ..... No fee' — not entered, per the project convention that FL school impact fees are residential-only. AUDIT 7/12/2026 — §121-140 schedule re-read off Municode and confirmed residential-only (single-family detached $390.85; multifamily $363.12; mobile home in a mobile home park $414.02; recreational vehicle $248.67; motel/hotel per room $116.00). No nonresidential row exists, so the confirmed $0 stands and the Unconfirmed box correctly stays unchecked. ⚠️ RECHECK EACH CYCLE: the county's Public Notices page shows 'BOCC Notice of Public Hearings to consider the adoption of Parks and Recreation Impact Fees on June 9, 2026, and June 22, 2026' — a new parks study could add nonresidential rows. No adopted schedule published as of 7/12/2026.
- Emergency Medical Service Impact Fee (Glades County, Commercial)Requires confirmationGlades CountyCOLLECTION SUSPENDED / NOT RESUMED — $0 as of 7/12/2026. Ch. 121 applies COUNTYWIDE incl. inside Moore Haven (§121-63: 'Building permit means the approval issued by the county or any municipality within the county' — re-confirmed verbatim on audit 7/12/2026). BOCC suspension of collection ran to 3/13/2026, not re-extended. REFERENCE — codified rate, Ch. 121 Art. III §121-65 (Ord. 2008-32; Nicholas Technical Memorandum 7/17/2008): schedule row 'Commercial/retail — under 100,000 ft²' = $86.00 per 1,000 sq ft of floor area (applied fractionally below 1,000 sq ft; includes a 3% administration charge). Other tiers: 100,000–199,999 = $119.00; 200,000–399,999 = $161.00; 400,000+ = $148.00. ⚠️ VERIFY new ordinance no./schedule/effective date → Glades County Community Development (863) 946-6020. AUDIT 7/12/2026 — re-verified; still $0, still Unconfirmed. (1) County Impact Fees page re-read: still shows ONLY the suspension-to-3/13/2026 notice. (2) Municode Ch. 121 still carries the 2008 ordinances (latest amendments 2017) — no 2026 impact-fee ordinance codified. (3) OFFICIAL SOURCE for the pending action (supersedes the WGCU news item, which is a lead only): the county's Public Notices page lists 'BOCC Notice of Public Hearings to consider the adoption of Emergency Medical Services Impact Fees on June 9, 2026, and June 22, 2026' (with separate notices for Transportation, Parks and Recreation, and Public Education). No adopted ordinance, rate schedule or effective date published as of 7/12/2026. (4) Codified reference rates above re-read off Municode §121-65 on audit — correct row, correct amounts.
- Road Impact Fee (Glades County, Commercial)Requires confirmationGlades CountyCOLLECTION SUSPENDED / NOT RESUMED — $0 as of 7/12/2026. Glades County Ch. 121 impact fees apply COUNTYWIDE incl. inside Moore Haven — §121-63 et al.: 'Building permit means the approval issued by the county or any municipality within the county' (verbatim, re-confirmed on audit 7/12/2026 across all four articles). The BOCC's temporary suspension of collection of ALL impact fees (voted 3/11/2025) ran to 3/13/2026 and was not re-extended. REFERENCE — codified rate, Ch. 121 Art. IV §121-100 (Ord. 2008-33; Nicholas 'Technical Memorandum', 7/17/2008): schedule row 'Commercial/retail — under 100,000 ft²' = $3,966.00 per 1,000 sq ft of floor area (applied fractionally below 1,000 sq ft). Other tiers: 100,000–199,999 = $8,636.00; 200,000–399,999 = $10,407.00; 400,000+ = $12,320.00. ⚠️ VERIFY new ordinance no., adopted nonres rate schedule and effective date → Glades County Community Development (863) 946-6020. AUDIT 7/12/2026 — re-verified; still $0, still Unconfirmed. (1) County Impact Fees page re-read: still shows ONLY the suspension-to-3/13/2026 notice. (2) Municode Ch. 121 still carries the 2008 ordinances (latest amendments 2017) — no 2026 impact-fee ordinance codified. (3) OFFICIAL SOURCE for the pending action (supersedes the WGCU news item, which is a lead only): the county's Public Notices page lists 'BOCC Notice of Public Hearings to consider the adoption of Transportation Impact Fees on June 9, 2026, and June 22, 2026' (with separate notices for Parks and Recreation, Public Education, and EMS). The road fee is being re-adopted as a TRANSPORTATION impact fee. No adopted ordinance, rate schedule or effective date published as of 7/12/2026. (4) Codified reference rates above re-read off Municode §121-100 on audit — correct row, correct amounts.
Where in Glades County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moore Haven: Industrial Impact Fees
Industrial development in Moore Haven pays no per-square-foot impact fees, but owes $2,450.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to at least $2,450.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU ($2,000.00 one-time) and Water Tap-in Fee (City of Moore Haven) — 1" meter ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Emergency Medical Service Impact Fee (Glades County, Industrial) and Road Impact Fee (Glades County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Tap-in Fee (City of Moore Haven) — 1" meter$450.00 one-timeCity of Moore HavenCONFIRMED — read directly off the City of Moore Haven Utilities page 7/12/2026. The city operates its own water utility. The posted table is titled 'Residential and Commercial Water Tap-in Fees' — ONE meter-size ladder serving all customer classes, so the nonresidential rate legitimately equals the residential rate at the same meter size (not residential-rate contamination). Full ladder: 3/4" = $300.00; 1" = $450.00; 1.5" = $690.00; 2" = $1,000.00; over 2" = total cost of materials + $1,000.00 (not a fixed amount — no record entered for that tier). Canonical nonres default = 1" meter = $450.00. NO separate water capacity / system-development (impact) charge is published — the tap-in fee is the entire one-time capital connection charge. The $15.00 'initial connect for water' is an account-activation charge, and the commercial water deposits ($50–$245 by meter size) and monthly base rates are refundable/recurring — none are capital fees, so none are entered. Contact City Hall (863) 946-0711. AUDIT 7/12/2026 — full tap-in ladder re-read off moorehaven.org/utilities and confirmed unchanged (3/4" $300 / 1" $450 / 1.5" $690 / 2" $1,000 / over 2" materials + $1,000). Shared residential+commercial ladder re-confirmed — the SFR match is the documented shared-table exception, not contamination. Default correctly sits on the 1" tier.
- Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU$2,000.00 one-timeMoore Haven City/County Public Works Authority (CCPWA)CONFIRMED 7/12/2026. Sewer is provided by the Moore Haven City/County Public Works Authority (CCPWA), a combined special district of the Glades County BOCC + City of Moore Haven. CCPWA Resolution No. 2025-01, adopted in special session 10/27/2025, effective on adoption, supersedes all prior schedules. Exhibit A Sec. A.4: System Development Charge / Capacity Charge = $2,000.00 per ERU. Sec. A.3: 1 ERU = 150 gallons/day design flow. NO meter-size table is published — nonresidential ERU count is derived from the project's design flow: ERUs = design flow (gpd) ÷ 150 gpd, with a 1.0-ERU minimum. Value stored is the published 1-ERU minimum ($2,000.00); multiply by the project's ERU count for a specific building. Additional one-time charges: project plan review $100.00/ERU (Exhibit A Sec. B.9) and project inspection $25.00 (Sec. B.10) — not capital capacity fees, not entered. Source PDF is image-based (https://moorehaven.org/wp-content/uploads/2026/01/CCPWA-RESOLUTION-NO.-2025-01-SIGNED.pdf); the city's own commercial sewer deposits and monthly base rates are recurring/refundable, not capital fees. Contact CCPWA (863) 946-0711.
- City Impact Fee (City of Moore Haven, Industrial)$0.00City of Moore HavenCONFIRMED $0 — verified 7/12/2026, re-verified on audit 7/12/2026. No municipal development impact fee program of any kind. The Moore Haven Code of Ordinances (Municode; codified through Ord. No. 360, adopted 3/18/2025, Supp. No. 9) contains NO impact-fee chapter — the full Part II chapter list (41 chapters, Ch. 26 through Ch. 125) was enumerated on audit and includes Ch. 34 Building Construction, Ch. 66 Land Development, Ch. 115 Utilities and Ch. 125 Zoning, but no impact/development-fee chapter. Only utility tap-in/connection charges apply (see Water Sewer Fees - Nonresidential table). Glades County Ch. 121 fees apply countywide inside the city — see the County records. Contact City Hall (863) 946-0711.
- Park Impact Fee (Glades County, Industrial)$0.00Glades CountyCONFIRMED $0 — verified 7/12/2026. The Glades County park impact fee schedule (Ch. 121 Art. V §121-140) contains ONLY residential rows (single-family, multifamily, mobile home, recreational vehicle, motel/hotel per room). No nonresidential rows — the park impact fee does not reach industrial development. Confirmed $0 independent of the county's collection suspension. Public Education schedule (§121-25) likewise reads 'Nonresidential ..... No fee' — not entered per project convention. AUDIT 7/12/2026 — §121-140 schedule re-read off Municode and confirmed residential-only (single-family detached $390.85; multifamily $363.12; mobile home in a mobile home park $414.02; recreational vehicle $248.67; motel/hotel per room $116.00). No nonresidential row exists, so the confirmed $0 stands and the Unconfirmed box correctly stays unchecked. ⚠️ RECHECK EACH CYCLE: the county's Public Notices page shows 'BOCC Notice of Public Hearings to consider the adoption of Parks and Recreation Impact Fees on June 9, 2026, and June 22, 2026' — a new parks study could add nonresidential rows. No adopted schedule published as of 7/12/2026.
- Emergency Medical Service Impact Fee (Glades County, Industrial)Requires confirmationGlades CountyCOLLECTION SUSPENDED / NOT RESUMED — $0 as of 7/12/2026. Ch. 121 applies COUNTYWIDE incl. inside Moore Haven (§121-63: 'Building permit means the approval issued by the county or any municipality within the county' — re-confirmed verbatim on audit 7/12/2026). BOCC suspension of collection ran to 3/13/2026, not re-extended. REFERENCE — codified rate, Ch. 121 Art. III §121-65 (Ord. 2008-32): schedule row 'Industrial buildings — General industrial' = $43.00 per 1,000 sq ft of floor area (includes 3% admin charge). (Warehouse/storage row = $22.00 — not entered per default-row-only rule.) ⚠️ VERIFY new ordinance no./schedule/effective date → Glades County Community Development (863) 946-6020. AUDIT 7/12/2026 — re-verified; still $0, still Unconfirmed. (1) County Impact Fees page re-read: still shows ONLY the suspension-to-3/13/2026 notice. (2) Municode Ch. 121 still carries the 2008 ordinances (latest amendments 2017) — no 2026 impact-fee ordinance codified. (3) OFFICIAL SOURCE for the pending action (supersedes the WGCU news item, which is a lead only): the county's Public Notices page lists 'BOCC Notice of Public Hearings to consider the adoption of Emergency Medical Services Impact Fees on June 9, 2026, and June 22, 2026' (with separate notices for Transportation, Parks and Recreation, and Public Education). No adopted ordinance, rate schedule or effective date published as of 7/12/2026. (4) Codified reference rates above re-read off Municode §121-65 on audit — correct row, correct amounts.
- Road Impact Fee (Glades County, Industrial)Requires confirmationGlades CountyCOLLECTION SUSPENDED / NOT RESUMED — $0 as of 7/12/2026. Ch. 121 applies COUNTYWIDE incl. inside Moore Haven (§121-63: 'Building permit means the approval issued by the county or any municipality within the county' — re-confirmed verbatim on audit 7/12/2026). BOCC suspension of collection ran to 3/13/2026, not re-extended. REFERENCE — codified rate, Ch. 121 Art. IV §121-100 (Ord. 2008-33; Nicholas Technical Memorandum 7/17/2008): schedule row 'Industrial buildings — General industrial' = $3,644.00 per 1,000 sq ft of floor area. (Warehouse/storage row = $2,597.00 — not entered per default-row-only rule.) ⚠️ VERIFY new ordinance no./schedule/effective date → Glades County Community Development (863) 946-6020. AUDIT 7/12/2026 — re-verified; still $0, still Unconfirmed. (1) County Impact Fees page re-read: still shows ONLY the suspension-to-3/13/2026 notice. (2) Municode Ch. 121 still carries the 2008 ordinances (latest amendments 2017) — no 2026 impact-fee ordinance codified. (3) OFFICIAL SOURCE for the pending action (supersedes the WGCU news item, which is a lead only): the county's Public Notices page lists 'BOCC Notice of Public Hearings to consider the adoption of Transportation Impact Fees on June 9, 2026, and June 22, 2026' (with separate notices for Parks and Recreation, Public Education, and EMS). The road fee is being re-adopted as a TRANSPORTATION impact fee. No adopted ordinance, rate schedule or effective date published as of 7/12/2026. (4) Codified reference rates above re-read off Municode §121-100 on audit — correct row, correct amounts.
Where in Glades County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moore Haven: Office Impact Fees
Office development in Moore Haven pays no per-square-foot impact fees, but owes $2,450.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to at least $2,450.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU ($2,000.00 one-time) and Water Tap-in Fee (City of Moore Haven) — 1" meter ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Emergency Medical Service Impact Fee (Glades County, Office) and Road Impact Fee (Glades County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Tap-in Fee (City of Moore Haven) — 1" meter$450.00 one-timeCity of Moore HavenCONFIRMED — read directly off the City of Moore Haven Utilities page 7/12/2026. The city operates its own water utility. The posted table is titled 'Residential and Commercial Water Tap-in Fees' — ONE meter-size ladder serving all customer classes, so the nonresidential rate legitimately equals the residential rate at the same meter size (not residential-rate contamination). Full ladder: 3/4" = $300.00; 1" = $450.00; 1.5" = $690.00; 2" = $1,000.00; over 2" = total cost of materials + $1,000.00 (not a fixed amount — no record entered for that tier). Canonical nonres default = 1" meter = $450.00. NO separate water capacity / system-development (impact) charge is published — the tap-in fee is the entire one-time capital connection charge. The $15.00 'initial connect for water' is an account-activation charge, and the commercial water deposits ($50–$245 by meter size) and monthly base rates are refundable/recurring — none are capital fees, so none are entered. Contact City Hall (863) 946-0711. AUDIT 7/12/2026 — full tap-in ladder re-read off moorehaven.org/utilities and confirmed unchanged (3/4" $300 / 1" $450 / 1.5" $690 / 2" $1,000 / over 2" materials + $1,000). Shared residential+commercial ladder re-confirmed — the SFR match is the documented shared-table exception, not contamination. Default correctly sits on the 1" tier.
- Sewer System Development Charge (Moore Haven CCPWA) — 1 ERU × $2,000/ERU$2,000.00 one-timeMoore Haven City/County Public Works Authority (CCPWA)CONFIRMED 7/12/2026. Sewer is provided by the Moore Haven City/County Public Works Authority (CCPWA), a combined special district of the Glades County BOCC + City of Moore Haven. CCPWA Resolution No. 2025-01, adopted in special session 10/27/2025, effective on adoption, supersedes all prior schedules. Exhibit A Sec. A.4: System Development Charge / Capacity Charge = $2,000.00 per ERU. Sec. A.3: 1 ERU = 150 gallons/day design flow. NO meter-size table is published — nonresidential ERU count is derived from the project's design flow: ERUs = design flow (gpd) ÷ 150 gpd, with a 1.0-ERU minimum. Value stored is the published 1-ERU minimum ($2,000.00); multiply by the project's ERU count for a specific building. Additional one-time charges: project plan review $100.00/ERU (Exhibit A Sec. B.9) and project inspection $25.00 (Sec. B.10) — not capital capacity fees, not entered. Source PDF is image-based (https://moorehaven.org/wp-content/uploads/2026/01/CCPWA-RESOLUTION-NO.-2025-01-SIGNED.pdf); the city's own commercial sewer deposits and monthly base rates are recurring/refundable, not capital fees. Contact CCPWA (863) 946-0711.
- City Impact Fee (City of Moore Haven, Office)$0.00City of Moore HavenCONFIRMED $0 — verified 7/12/2026, re-verified on audit 7/12/2026. No municipal development impact fee program of any kind. The Moore Haven Code of Ordinances (Municode; codified through Ord. No. 360, adopted 3/18/2025, Supp. No. 9) contains NO impact-fee chapter — the full Part II chapter list (41 chapters, Ch. 26 through Ch. 125) was enumerated on audit and includes Ch. 34 Building Construction, Ch. 66 Land Development, Ch. 115 Utilities and Ch. 125 Zoning, but no impact/development-fee chapter. Only utility tap-in/connection charges apply (see Water Sewer Fees - Nonresidential table). Glades County Ch. 121 fees apply countywide inside the city — see the County records. Contact City Hall (863) 946-0711.
- Park Impact Fee (Glades County, Office)$0.00Glades CountyCONFIRMED $0 — verified 7/12/2026. The Glades County park impact fee schedule (Ch. 121 Art. V §121-140) contains ONLY residential rows (single-family, multifamily, mobile home, recreational vehicle, motel/hotel per room). No nonresidential rows — the park impact fee does not reach office development. Confirmed $0 independent of the county's collection suspension. Public Education schedule (§121-25) likewise reads 'Nonresidential ..... No fee' — not entered per project convention. AUDIT 7/12/2026 — §121-140 schedule re-read off Municode and confirmed residential-only (single-family detached $390.85; multifamily $363.12; mobile home in a mobile home park $414.02; recreational vehicle $248.67; motel/hotel per room $116.00). No nonresidential row exists, so the confirmed $0 stands and the Unconfirmed box correctly stays unchecked. ⚠️ RECHECK EACH CYCLE: the county's Public Notices page shows 'BOCC Notice of Public Hearings to consider the adoption of Parks and Recreation Impact Fees on June 9, 2026, and June 22, 2026' — a new parks study could add nonresidential rows. No adopted schedule published as of 7/12/2026.
- Emergency Medical Service Impact Fee (Glades County, Office)Requires confirmationGlades CountyCOLLECTION SUSPENDED / NOT RESUMED — $0 as of 7/12/2026. Ch. 121 applies COUNTYWIDE incl. inside Moore Haven (§121-63: 'Building permit means the approval issued by the county or any municipality within the county' — re-confirmed verbatim on audit 7/12/2026). BOCC suspension of collection ran to 3/13/2026, not re-extended. REFERENCE — codified rate, Ch. 121 Art. III §121-65 (Ord. 2008-32): schedule row 'Offices — under 100,000 ft²' = $78.00 per 1,000 sq ft of floor area (includes 3% admin charge). Other tiers: 100,000–199,999 = $70.00; 200,000+ = $66.00. (Medical offices row = $106.00 — not entered per default-row-only rule.) ⚠️ VERIFY new ordinance no./schedule/effective date → Glades County Community Development (863) 946-6020. AUDIT 7/12/2026 — re-verified; still $0, still Unconfirmed. (1) County Impact Fees page re-read: still shows ONLY the suspension-to-3/13/2026 notice. (2) Municode Ch. 121 still carries the 2008 ordinances (latest amendments 2017) — no 2026 impact-fee ordinance codified. (3) OFFICIAL SOURCE for the pending action (supersedes the WGCU news item, which is a lead only): the county's Public Notices page lists 'BOCC Notice of Public Hearings to consider the adoption of Emergency Medical Services Impact Fees on June 9, 2026, and June 22, 2026' (with separate notices for Transportation, Parks and Recreation, and Public Education). No adopted ordinance, rate schedule or effective date published as of 7/12/2026. (4) Codified reference rates above re-read off Municode §121-65 on audit — correct row, correct amounts.
- Road Impact Fee (Glades County, Office)Requires confirmationGlades CountyCOLLECTION SUSPENDED / NOT RESUMED — $0 as of 7/12/2026. Ch. 121 applies COUNTYWIDE incl. inside Moore Haven (§121-63: 'Building permit means the approval issued by the county or any municipality within the county' — re-confirmed verbatim on audit 7/12/2026). BOCC suspension of collection ran to 3/13/2026, not re-extended. REFERENCE — codified rate, Ch. 121 Art. IV §121-100 (Ord. 2008-33; Nicholas Technical Memorandum 7/17/2008): schedule row 'Offices — under 100,000 ft²' = $4,831.00 per 1,000 sq ft of floor area. Other tiers: 100,000–199,999 = $3,745.00; 200,000+ = $4,046.00. ⚠️ VERIFY new ordinance no./schedule/effective date → Glades County Community Development (863) 946-6020. AUDIT 7/12/2026 — re-verified; still $0, still Unconfirmed. (1) County Impact Fees page re-read: still shows ONLY the suspension-to-3/13/2026 notice. (2) Municode Ch. 121 still carries the 2008 ordinances (latest amendments 2017) — no 2026 impact-fee ordinance codified. (3) OFFICIAL SOURCE for the pending action (supersedes the WGCU news item, which is a lead only): the county's Public Notices page lists 'BOCC Notice of Public Hearings to consider the adoption of Transportation Impact Fees on June 9, 2026, and June 22, 2026' (with separate notices for Parks and Recreation, Public Education, and EMS). The road fee is being re-adopted as a TRANSPORTATION impact fee. No adopted ordinance, rate schedule or effective date published as of 7/12/2026. (4) Codified reference rates above re-read off Municode §121-100 on audit — correct row, correct amounts.
Where in Glades County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Moore Haven
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Moore Haven, Florida?
A new single-family home in Moore Haven pays at least $2,300.00 per unit in combined impact fees (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Moore Haven?
Commercial development in Moore Haven pays no per-square-foot impact fees, but owes $2,450.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Moore Haven charge its own impact fees?
Yes. Moore Haven levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Moore Haven, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Glades County impact fees page.