Gulf County, Florida Impact Fees

Impact fees in Gulf County depend on where you build. This page details the rates for unincorporated Gulf County: $4,932.00 per single-family unit as of . Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Gulf County impact fees by project type

Where in Gulf County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gulf County$4,932.00this page
Port St. Joe$4,932.00Wewahitchka$0.00Includes unconfirmed fees

Unincorporated Gulf County: Single-Family Impact Fees

A new single-family home in unincorporated Gulf County pays $4,932.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capital Facilities Charge (City of Port St. Joe) ($2,765.00) and Water Capital Facilities Charge (City of Port St. Joe) ($2,167.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Gulf County impact fee schedule
Water$2,167.00
  • Water Capital Facilities Charge (City of Port St. Joe)
    PSJ-served unincorporated (St. Joe Beach / Highland View / White City / Overstreet / Beacon Hill / Gulf Aire)
    City of Port St. Joe
    Water in the unincorporated communities served by the City of Port St. Joe (St. Joe Beach, Highland View, White City — water+sewer; Overstreet, Beacon Hill, Gulf Aire — water only). Water capital facilities charge $2,167 at the standard 5/8"×3/4" meter (rate current 2026). Tap $400 and deposit $100 are additional. This is the default unincorporated water record; the Gulf County Water Dept service area (Cape San Blas/CR-30A) levies no capital fee.
    $2,167.00
Sewer$2,765.00
  • Sewer Capital Facilities Charge (City of Port St. Joe)
    PSJ-served unincorporated (Cape San Blas / CR-30 / St. Joe Beach / Highland View / White City)
    City of Port St. Joe
    Sewer in the coastal unincorporated communities served by the City of Port St. Joe (Cape San Blas, CR-30, St. Joe Beach, Highland View, White City). Sewer capital facilities charge $2,765 at the standard 5/8"×3/4" meter (rate current 2026). Tap $400 and deposit $100 are additional; pressure-system areas also require a grinder pump (~$3,377.50 + tax) and an engineer evaluation ($350 on Cape San Blas/CR-30). Rural interior unincorporated areas are on septic.
    $2,765.00
City$0.00
County$0.00
Total (unincorporated Gulf County): $4,932.00
Sources last checked Official fee schedules:City of Port St. Joe N/A Gulf County

Where in Gulf County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gulf County$4,932.00this page
Port St. Joe$4,932.00Wewahitchka$0.00Includes unconfirmed fees

Unincorporated Gulf County: Multifamily Impact Fees

A new multifamily unit in unincorporated Gulf County pays $4,932.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capital Facilities Charge (City of Port St. Joe, MF) ($2,765.00) and Water Capital Facilities Charge (City of Port St. Joe, MF) ($2,167.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Gulf County impact fee schedule
Water$2,167.00
  • Water Capital Facilities Charge (City of Port St. Joe, MF)
    PSJ-served unincorporated (St. Joe Beach / Highland View / White City / Overstreet / Beacon Hill / Gulf Aire)
    City of Port St. Joe
    Water in the unincorporated communities served by the City of Port St. Joe (St. Joe Beach, Highland View, White City — water+sewer; Overstreet, Beacon Hill, Gulf Aire — water only). Water capital facilities charge $2,167 at the 5/8"×3/4" base meter (rate current 2026); meter-size based, so a multifamily project is assessed on its master meter (base-meter rate shown). Default unincorporated water record; the Gulf County Water Dept area levies no capital fee.
    $2,167.00
Sewer$2,765.00
  • Sewer Capital Facilities Charge (City of Port St. Joe, MF)
    PSJ-served unincorporated (Cape San Blas / CR-30 / St. Joe Beach / Highland View / White City)
    City of Port St. Joe
    Sewer in the coastal unincorporated communities served by the City of Port St. Joe (Cape San Blas, CR-30, St. Joe Beach, Highland View, White City). Sewer capital facilities charge $2,765 at the 5/8"×3/4" base meter (rate current 2026); meter-size based, so a multifamily project is assessed on its master meter (base-meter rate shown). Rural interior unincorporated areas are on septic.
    $2,765.00
City$0.00
County$0.00
Total (unincorporated Gulf County): $4,932.00
Sources last checked Official fee schedules:City of Port St. Joe N/A Gulf County

Where in Gulf County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gulf County$12,331.00*this pageIncludes unconfirmed fees
Port St. Joe$12,331.00*Wewahitchka$0.00Includes unconfirmed fees

Unincorporated Gulf County: Commercial Impact Fees

Commercial development in unincorporated Gulf County pays no per-square-foot impact fees, but owes $12,331.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $12,331.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capital Facilities Charge (City of Port St. Joe) — 1" meter ($6,913.00 one-time) and Water Capital Facilities Charge (City of Port St. Joe) — 1" meter ($5,418.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Capital/Connection Fee (Gulf County Water Department) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Gulf County impact fee schedule
Water$5,418.00 one-time
  • Water Capital Facilities Charge (City of Port St. Joe) — 1" meter
    City of Port St. Joe
    The City of Port St. Joe supplies water to much of the developed unincorporated coast; rural interior parcels use private wells. The capital facilities charge is set by water-meter size under Ordinance 577, effective January 1, 2021, under a single schedule for all customer classes. Amount shown is for a 1-inch meter; the full meter-size ladder (5/8-inch through 6-inch) is published in Ordinance 577.
    $5,418.00 one-time
  • Water Capital/Connection Fee (Gulf County Water Department)
    Gulf County Water Department
    Within unincorporated Gulf County, the Cape San Blas / CR-30A corridor is served by the Gulf County Water Department, which publishes no one-time capital, capacity, or system-development charge; new-meter costs are quoted per request. The canonical published unincorporated water charge is the City of Port St. Joe meter-ladder.
    Requires confirmation
Sewer$6,913.00 one-time
  • Sewer Capital Facilities Charge (City of Port St. Joe) — 1" meter
    City of Port St. Joe
    The City of Port St. Joe supplies sewer to much of the developed unincorporated coast; rural interior parcels use septic. The capital facilities charge is set by water-meter size under Ordinance 577, effective January 1, 2021, under a single schedule for all customer classes. Amount shown is for a 1-inch meter; the full meter-size ladder (5/8-inch through 6-inch) is published in Ordinance 577. Pressure-sewer areas additionally require a grinder pump (not an impact fee).
    $6,913.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Gulf County, Commercial)
    Gulf County
    Gulf County levies no nonresidential development impact fees; this applies county-wide, including within incorporated municipalities. Confirmed current through the county's most recently adopted ordinances (May 2026).
    $0.00
Total (unincorporated Gulf County): $12,331.00 one-time (≈ $12,331.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Port St. Joe Gulf County Water Department N/A Gulf County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gulf County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gulf County$12,331.00*this pageIncludes unconfirmed fees
Port St. Joe$12,331.00*Wewahitchka$0.00Includes unconfirmed fees

Unincorporated Gulf County: Industrial Impact Fees

Industrial development in unincorporated Gulf County pays no per-square-foot impact fees, but owes $12,331.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $12,331.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capital Facilities Charge (City of Port St. Joe) — 1" meter ($6,913.00 one-time) and Water Capital Facilities Charge (City of Port St. Joe) — 1" meter ($5,418.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Capital/Connection Fee (Gulf County Water Department) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Gulf County impact fee schedule
Water$5,418.00 one-time
  • Water Capital Facilities Charge (City of Port St. Joe) — 1" meter
    City of Port St. Joe
    The City of Port St. Joe supplies water to much of the developed unincorporated coast; rural interior parcels use private wells. The capital facilities charge is set by water-meter size under Ordinance 577, effective January 1, 2021, under a single schedule for all customer classes. Amount shown is for a 1-inch meter; the full meter-size ladder (5/8-inch through 6-inch) is published in Ordinance 577.
    $5,418.00 one-time
  • Water Capital/Connection Fee (Gulf County Water Department)
    Gulf County Water Department
    Within unincorporated Gulf County, the Cape San Blas / CR-30A corridor is served by the Gulf County Water Department, which publishes no one-time capital, capacity, or system-development charge; new-meter costs are quoted per request. The canonical published unincorporated water charge is the City of Port St. Joe meter-ladder.
    Requires confirmation
Sewer$6,913.00 one-time
  • Sewer Capital Facilities Charge (City of Port St. Joe) — 1" meter
    City of Port St. Joe
    The City of Port St. Joe supplies sewer to much of the developed unincorporated coast; rural interior parcels use septic. The capital facilities charge is set by water-meter size under Ordinance 577, effective January 1, 2021, under a single schedule for all customer classes. Amount shown is for a 1-inch meter; the full meter-size ladder (5/8-inch through 6-inch) is published in Ordinance 577. Pressure-sewer areas additionally require a grinder pump (not an impact fee).
    $6,913.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Gulf County, Industrial)
    Gulf County
    Gulf County levies no nonresidential development impact fees; this applies county-wide, including within incorporated municipalities. Confirmed current through the county's most recently adopted ordinances (May 2026).
    $0.00
Total (unincorporated Gulf County): $12,331.00 one-time (≈ $12,331.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Port St. Joe Gulf County Water Department N/A Gulf County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gulf County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gulf County$12,331.00*this pageIncludes unconfirmed fees
Port St. Joe$12,331.00*Wewahitchka$0.00Includes unconfirmed fees

Unincorporated Gulf County: Office Impact Fees

Office development in unincorporated Gulf County pays no per-square-foot impact fees, but owes $12,331.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to at least $12,331.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capital Facilities Charge (City of Port St. Joe) — 1" meter ($6,913.00 one-time) and Water Capital Facilities Charge (City of Port St. Joe) — 1" meter ($5,418.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Capital/Connection Fee (Gulf County Water Department) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Gulf County impact fee schedule
Water$5,418.00 one-time
  • Water Capital Facilities Charge (City of Port St. Joe) — 1" meter
    City of Port St. Joe
    The City of Port St. Joe supplies water to much of the developed unincorporated coast; rural interior parcels use private wells. The capital facilities charge is set by water-meter size under Ordinance 577, effective January 1, 2021, under a single schedule for all customer classes. Amount shown is for a 1-inch meter; the full meter-size ladder (5/8-inch through 6-inch) is published in Ordinance 577.
    $5,418.00 one-time
  • Water Capital/Connection Fee (Gulf County Water Department)
    Gulf County Water Department
    Within unincorporated Gulf County, the Cape San Blas / CR-30A corridor is served by the Gulf County Water Department, which publishes no one-time capital, capacity, or system-development charge; new-meter costs are quoted per request. The canonical published unincorporated water charge is the City of Port St. Joe meter-ladder.
    Requires confirmation
Sewer$6,913.00 one-time
  • Sewer Capital Facilities Charge (City of Port St. Joe) — 1" meter
    City of Port St. Joe
    The City of Port St. Joe supplies sewer to much of the developed unincorporated coast; rural interior parcels use septic. The capital facilities charge is set by water-meter size under Ordinance 577, effective January 1, 2021, under a single schedule for all customer classes. Amount shown is for a 1-inch meter; the full meter-size ladder (5/8-inch through 6-inch) is published in Ordinance 577. Pressure-sewer areas additionally require a grinder pump (not an impact fee).
    $6,913.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Gulf County, Office)
    Gulf County
    Gulf County levies no nonresidential development impact fees; this applies county-wide, including within incorporated municipalities. Confirmed current through the county's most recently adopted ordinances (May 2026).
    $0.00
Total (unincorporated Gulf County): $12,331.00 one-time (≈ $12,331.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Port St. Joe Gulf County Water Department N/A Gulf County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Gulf County impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Gulf County impact fee FAQs

What are single-family impact fees in Gulf County, Florida?

A new single-family home in unincorporated Gulf County pays $4,932.00 per unit in impact fees (rates sourced July 12, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Gulf County?

Multifamily development in unincorporated Gulf County pays $4,932.00 per unit in impact fees (rates sourced July 12, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Gulf County?

Commercial development in unincorporated Gulf County pays no per-square-foot impact fees, but owes $12,331.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Do cities in Gulf County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 1 of 2 cities in Gulf County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000