Bowling Green impact fees by project type
Bowling Green: Single-Family Impact Fees
Bowling Green has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Water Capacity Fee (City of Bowling Green) and Sewer Capacity Fee (City of Bowling Green) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenAUDIT 7/12/2026 — City of Bowling Green IS codified on Municode (prior note wrongly said the city publishes nothing). Code Ch. 38, Art. II (Water and Wastewater Utility Service Ordinance, Ord. 2007-07 as amended by 2009-06, 2014-01, 2016-10). Sec. 38-23(b) establishes a water CAPACITY FEE per applicant; Sec. 38-23(n)-(o) establish meter-installation and tap/connection fees. All AMOUNTS are set by resolution of the city commission and are on file with the city clerk — none codified, none posted online. Water ERU = 300 gpd. NOTE Sec. 38-23(c)(2): the ordinance itself established an immediate capacity-fee WAIVER moratorium (waiver by contract, max 4 ERCs/applicant), terminable by resolution — confirm whether the waiver is still in force. Amount unconfirmed: City Hall (863) 375-2255.
- Sewer Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenAUDIT 7/12/2026 — PROVIDER RESOLVED: the City of Bowling Green operates its OWN wastewater collection, treatment and disposal system (POTW/WWTP defined in Code Sec. 38-19; Ord. 2007-07). It is not routed to HCUD's Vandolah WWTF. Sec. 38-23(b) establishes a wastewater capacity fee; amount set by commission resolution, not codified and not posted. Wastewater ERU = 225 gpd. Sec. 38-23(c)(2) established an immediate capacity-fee waiver moratorium terminable by resolution — confirm current status. Amount unconfirmed: City Hall (863) 375-2255.
- City Impact Fees (City of Bowling Green) — None$0.00City of Bowling GreenNo municipal development impact fee program. AUDIT 7/12/2026: re-proved from the city's own codifier — Bowling Green Code of Ordinances (Municode) has no impact-fee chapter; Ch. 38 (Utilities) carries only water/wastewater capacity, tap and meter fees. ~3,000 pop. Prior URL was the bare city homepage (fails URL-liveness check); repointed to the codifier.
- County Impact Fees — None$0.00Hardee CountyHardee County does NOT currently levy development impact fees (confirmed BOCC agenda Nov 19, 2024). No county school impact fee. Applies countywide incl. Bowling Green. Researched June 10, 2026.
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green: Multifamily Impact Fees
Bowling Green has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Sewer Capacity Fee (City of Bowling Green, MF) and Water Capacity Fee (City of Bowling Green, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Bowling Green, MF)Requires confirmationCity of Bowling GreenAUDIT 7/12/2026 — Bowling Green IS codified on Municode: Ch. 38, Art. II (Ord. 2007-07 as amended). Sec. 38-23(b) establishes a water capacity fee based on anticipated average daily demand; water ERU = 300 gpd. MF is served by MASTER METER (Sec. 38-19 definition) and capacity is calculated per ERU by the city engineer — do NOT assume the SFR rate per unit. All amounts set by commission resolution (on file with the city clerk), none codified or posted. Sec. 38-23(c)(2) capacity-fee waiver moratorium — confirm status. Amount unconfirmed: City Hall (863) 375-2255.
- Sewer Capacity Fee (City of Bowling Green, MF)Requires confirmationCity of Bowling GreenAUDIT 7/12/2026 — PROVIDER RESOLVED: Bowling Green operates its own wastewater collection/treatment (POTW/WWTP per Code Sec. 38-19, Ord. 2007-07) — not HCUD's Vandolah WWTF. Sec. 38-23(b) wastewater capacity fee; wastewater ERU = 225 gpd; MF assessed by master meter / engineer's ERU calc. Amounts by commission resolution, not codified or posted. Amount unconfirmed: City Hall (863) 375-2255.
- City Impact Fees (City of Bowling Green, MF) — None$0.00City of Bowling GreenNo municipal development impact fee program. AUDIT 7/12/2026: re-proved from the city's codifier — Bowling Green Code of Ordinances (Municode) has no impact-fee chapter; Ch. 38 (Utilities) carries only water/wastewater capacity, tap and meter fees. Prior URL was the bare city homepage (fails URL-liveness check); repointed to the codifier.
- County Impact Fees — None (MF)$0.00Hardee CountyHardee County does NOT currently levy development impact fees (confirmed BOCC agenda Nov 19, 2024). No county school impact fee. Applies countywide incl. Bowling Green. Researched June 10, 2026.
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green: Commercial Impact Fees
Commercial development in Bowling Green pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Capacity Fee (City of Bowling Green) and Sewer Capacity Fee (City of Bowling Green) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenCity of Bowling Green operates its own water utility. Code Ch. 38, Art. II (Water and Wastewater Utility Service Ordinance, Ord. 2007-07 as amended by Ord. 2009-06, 2014-01, 2016-10). Sec. 38-23(b) establishes a water CAPACITY FEE assessed on the applicant's anticipated average daily demand; Sec. 38-23(n)-(o) establish meter-installation and tap/connection fees. Ch. 38 has only Art. I-IV — there is no separate utility impact-fee article. ALL AMOUNTS are set by resolution of the city commission and are on file with the city clerk: none are codified and none are posted online, so NO nonres meter-size ladder and NO per-ERU dollar rate is published anywhere. Water ERU = 300 gpd; commercial/industrial units are never less than 1 ERU regardless of projected flow (Sec. 38-19(b) definition). CAVEAT — Sec. 38-23(c)(2) established an immediate capacity-fee WAIVER moratorium (waiver by contract, max 4 ERCs per applicant), terminable by resolution; confirm whether the waiver is still in force, since it could zero this fee legitimately. AMOUNT UNCONFIRMED — request the current utility rate/fee resolution: City Hall (863) 375-2255, or utilityclerk@bowlinggreenflorida.org / cityclerk@bowlinggreenflorida.org. AUDIT 7/12/2026: Code Ch. 38 Art. II re-read live on Municode — every detail above reconfirmed, still no published amount. ⚠️ DOMAIN MIGRATION: the city's live site is now bowlinggreenfl.net (Elementor, current through 7/2026); the old bowlinggreenfl.org site is STALE (last content 2022) — use .net. Searched the new site's Documentation library end-to-end: no fee schedule, no rate resolution posted. ⚠️ LEAD: the city held a UTILITIES WORKSHOP on 5/21/2026 (agenda posted at bowlinggreenfl.net/ova_doc/utilities-workshop-agenda-may-21-2026/) and issued an RFQ for Engineering Services 5/19/2026 — a rate/capacity-fee study may be underway. Re-check the .net document library each cycle for an adopted rate resolution.
- Sewer Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenPROVIDER: the City of Bowling Green operates its OWN wastewater collection, treatment and disposal system (POTW/WWTP defined in Code Sec. 38-19; Ord. 2007-07) — it is NOT routed to Hardee County Utilities' Vandolah WWTF. Code Ch. 38, Art. II, Sec. 38-23(b) establishes a wastewater CAPACITY FEE assessed on anticipated average daily flow. Wastewater ERU = 225 gpd; commercial/industrial units are never less than 1 ERU regardless of projected flow (Sec. 38-19(b) definition). All amounts are set by commission resolution and held on file with the city clerk — not codified, not posted online; no nonres meter ladder or per-ERU rate published. CAVEAT — Sec. 38-23(c)(2) capacity-fee WAIVER moratorium (max 4 ERCs per applicant, terminable by resolution); confirm current status. AMOUNT UNCONFIRMED — request the current utility rate/fee resolution: City Hall (863) 375-2255, or utilityclerk@bowlinggreenflorida.org / cityclerk@bowlinggreenflorida.org. AUDIT 7/12/2026: Code Ch. 38 Art. II re-read live on Municode — every detail above reconfirmed, still no published amount. ⚠️ DOMAIN MIGRATION: the city's live site is now bowlinggreenfl.net; the old bowlinggreenfl.org site is STALE (last content 2022) — use .net. Searched the new site's Documentation library end-to-end: no fee schedule, no rate resolution posted. ⚠️ LEAD: UTILITIES WORKSHOP held 5/21/2026 (agenda at bowlinggreenfl.net/ova_doc/utilities-workshop-agenda-may-21-2026/) plus an Engineering Services RFQ 5/19/2026 — a rate/capacity-fee study may be underway. Re-check the .net document library each cycle for an adopted rate resolution.
- City Impact Fees (City of Bowling Green, Commercial) — None$0.00City of Bowling GreenNo municipal development impact fee program. Proved from the city's own codifier (Municode): the Code of Ordinances runs Ch. 1 through Ch. 38 plus Appendix A (Unified Land Development Code) with NO impact-fee chapter. Ch. 38 (Utilities) has only Art. I–IV and carries only water/wastewater capacity, tap and meter fees — utility fees, not city impact fees (recorded in the Water/Sewer Fees - Nonresidential table). Confirmed $0. Pop. ~3,000. Verify: City Hall (863) 375-2255. Researched 7/12/2026.
- County Impact Fees (Hardee County, Commercial) — None$0.00Hardee CountyHardee County levies NO development impact fees of any kind. Proved two ways: (1) the county's Unified Land Development Code (Municode, codified through Ord. 2024-10, enacted 11-19-2024) contains 13 articles and NO impact-fee article — Art. 8 is 'Public Facilities Monitoring and Performance' (concurrency), not an impact fee; (2) BOCC agenda 11-19-2024 states 'the County does not currently have impact fees.' County adopted impact fees in 2007-08 (Ord. 2007-07 et al.) then suspended/repealed them (Ord. 2008-22) during the recession; never reinstated. 2026 activity is Ord. 2026-06 'Cost Recovery' (Code Ch. 2, Art. IV) — reimbursement of land-development application REVIEW costs, not an impact fee. No county school impact fee (and FL school fees do not apply to nonres regardless). Confirmed $0; applies countywide incl. Bowling Green. Verify: Community Development (863) 767-1964. Researched 7/12/2026.
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green: Industrial Impact Fees
Industrial development in Bowling Green pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Capacity Fee (City of Bowling Green) and Sewer Capacity Fee (City of Bowling Green) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenCity of Bowling Green operates its own water utility. Code Ch. 38, Art. II (Water and Wastewater Utility Service Ordinance, Ord. 2007-07 as amended by Ord. 2009-06, 2014-01, 2016-10). Sec. 38-23(b) establishes a water CAPACITY FEE assessed on the applicant's anticipated average daily demand; Sec. 38-23(n)-(o) establish meter-installation and tap/connection fees. Ch. 38 has only Art. I-IV — there is no separate utility impact-fee article. ALL AMOUNTS are set by resolution of the city commission and are on file with the city clerk: none are codified and none are posted online, so NO nonres meter-size ladder and NO per-ERU dollar rate is published anywhere. Water ERU = 300 gpd; commercial/industrial units are never less than 1 ERU regardless of projected flow (Sec. 38-19(b) definition). CAVEAT — Sec. 38-23(c)(2) established an immediate capacity-fee WAIVER moratorium (waiver by contract, max 4 ERCs per applicant), terminable by resolution; confirm whether the waiver is still in force, since it could zero this fee legitimately. AMOUNT UNCONFIRMED — request the current utility rate/fee resolution: City Hall (863) 375-2255, or utilityclerk@bowlinggreenflorida.org / cityclerk@bowlinggreenflorida.org. AUDIT 7/12/2026: Code Ch. 38 Art. II re-read live on Municode — every detail above reconfirmed, still no published amount. ⚠️ DOMAIN MIGRATION: the city's live site is now bowlinggreenfl.net (Elementor, current through 7/2026); the old bowlinggreenfl.org site is STALE (last content 2022) — use .net. Searched the new site's Documentation library end-to-end: no fee schedule, no rate resolution posted. ⚠️ LEAD: the city held a UTILITIES WORKSHOP on 5/21/2026 (agenda posted at bowlinggreenfl.net/ova_doc/utilities-workshop-agenda-may-21-2026/) and issued an RFQ for Engineering Services 5/19/2026 — a rate/capacity-fee study may be underway. Re-check the .net document library each cycle for an adopted rate resolution.
- Sewer Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenPROVIDER: the City of Bowling Green operates its OWN wastewater collection, treatment and disposal system (POTW/WWTP defined in Code Sec. 38-19; Ord. 2007-07) — it is NOT routed to Hardee County Utilities' Vandolah WWTF. Code Ch. 38, Art. II, Sec. 38-23(b) establishes a wastewater CAPACITY FEE assessed on anticipated average daily flow. Wastewater ERU = 225 gpd; commercial/industrial units are never less than 1 ERU regardless of projected flow (Sec. 38-19(b) definition). All amounts are set by commission resolution and held on file with the city clerk — not codified, not posted online; no nonres meter ladder or per-ERU rate published. CAVEAT — Sec. 38-23(c)(2) capacity-fee WAIVER moratorium (max 4 ERCs per applicant, terminable by resolution); confirm current status. AMOUNT UNCONFIRMED — request the current utility rate/fee resolution: City Hall (863) 375-2255, or utilityclerk@bowlinggreenflorida.org / cityclerk@bowlinggreenflorida.org. AUDIT 7/12/2026: Code Ch. 38 Art. II re-read live on Municode — every detail above reconfirmed, still no published amount. ⚠️ DOMAIN MIGRATION: the city's live site is now bowlinggreenfl.net; the old bowlinggreenfl.org site is STALE (last content 2022) — use .net. Searched the new site's Documentation library end-to-end: no fee schedule, no rate resolution posted. ⚠️ LEAD: UTILITIES WORKSHOP held 5/21/2026 (agenda at bowlinggreenfl.net/ova_doc/utilities-workshop-agenda-may-21-2026/) plus an Engineering Services RFQ 5/19/2026 — a rate/capacity-fee study may be underway. Re-check the .net document library each cycle for an adopted rate resolution.
- City Impact Fees (City of Bowling Green, Industrial) — None$0.00City of Bowling GreenNo municipal development impact fee program. Proved from the city's own codifier (Municode): the Code of Ordinances runs Ch. 1 through Ch. 38 plus Appendix A (Unified Land Development Code) with NO impact-fee chapter. Ch. 38 (Utilities) has only Art. I–IV and carries only water/wastewater capacity, tap and meter fees — utility fees, not city impact fees (recorded in the Water/Sewer Fees - Nonresidential table). Confirmed $0. Pop. ~3,000. Verify: City Hall (863) 375-2255. Researched 7/12/2026.
- County Impact Fees (Hardee County, Industrial) — None$0.00Hardee CountyHardee County levies NO development impact fees of any kind. Proved two ways: (1) the county's Unified Land Development Code (Municode, codified through Ord. 2024-10, enacted 11-19-2024) contains 13 articles and NO impact-fee article — Art. 8 is 'Public Facilities Monitoring and Performance' (concurrency), not an impact fee; (2) BOCC agenda 11-19-2024 states 'the County does not currently have impact fees.' County adopted impact fees in 2007-08 (Ord. 2007-07 et al.) then suspended/repealed them (Ord. 2008-22) during the recession; never reinstated. 2026 activity is Ord. 2026-06 'Cost Recovery' (Code Ch. 2, Art. IV) — reimbursement of land-development application REVIEW costs, not an impact fee. No county school impact fee (and FL school fees do not apply to nonres regardless). Confirmed $0; applies countywide incl. Bowling Green. Verify: Community Development (863) 767-1964. Researched 7/12/2026.
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green: Office Impact Fees
Office development in Bowling Green pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Capacity Fee (City of Bowling Green) and Sewer Capacity Fee (City of Bowling Green) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenCity of Bowling Green operates its own water utility. Code Ch. 38, Art. II (Water and Wastewater Utility Service Ordinance, Ord. 2007-07 as amended by Ord. 2009-06, 2014-01, 2016-10). Sec. 38-23(b) establishes a water CAPACITY FEE assessed on the applicant's anticipated average daily demand; Sec. 38-23(n)-(o) establish meter-installation and tap/connection fees. Ch. 38 has only Art. I-IV — there is no separate utility impact-fee article. ALL AMOUNTS are set by resolution of the city commission and are on file with the city clerk: none are codified and none are posted online, so NO nonres meter-size ladder and NO per-ERU dollar rate is published anywhere. Water ERU = 300 gpd; commercial/industrial units are never less than 1 ERU regardless of projected flow (Sec. 38-19(b) definition). CAVEAT — Sec. 38-23(c)(2) established an immediate capacity-fee WAIVER moratorium (waiver by contract, max 4 ERCs per applicant), terminable by resolution; confirm whether the waiver is still in force, since it could zero this fee legitimately. AMOUNT UNCONFIRMED — request the current utility rate/fee resolution: City Hall (863) 375-2255, or utilityclerk@bowlinggreenflorida.org / cityclerk@bowlinggreenflorida.org. AUDIT 7/12/2026: Code Ch. 38 Art. II re-read live on Municode — every detail above reconfirmed, still no published amount. ⚠️ DOMAIN MIGRATION: the city's live site is now bowlinggreenfl.net (Elementor, current through 7/2026); the old bowlinggreenfl.org site is STALE (last content 2022) — use .net. Searched the new site's Documentation library end-to-end: no fee schedule, no rate resolution posted. ⚠️ LEAD: the city held a UTILITIES WORKSHOP on 5/21/2026 (agenda posted at bowlinggreenfl.net/ova_doc/utilities-workshop-agenda-may-21-2026/) and issued an RFQ for Engineering Services 5/19/2026 — a rate/capacity-fee study may be underway. Re-check the .net document library each cycle for an adopted rate resolution.
- Sewer Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenPROVIDER: the City of Bowling Green operates its OWN wastewater collection, treatment and disposal system (POTW/WWTP defined in Code Sec. 38-19; Ord. 2007-07) — it is NOT routed to Hardee County Utilities' Vandolah WWTF. Code Ch. 38, Art. II, Sec. 38-23(b) establishes a wastewater CAPACITY FEE assessed on anticipated average daily flow. Wastewater ERU = 225 gpd; commercial/industrial units are never less than 1 ERU regardless of projected flow (Sec. 38-19(b) definition). All amounts are set by commission resolution and held on file with the city clerk — not codified, not posted online; no nonres meter ladder or per-ERU rate published. CAVEAT — Sec. 38-23(c)(2) capacity-fee WAIVER moratorium (max 4 ERCs per applicant, terminable by resolution); confirm current status. AMOUNT UNCONFIRMED — request the current utility rate/fee resolution: City Hall (863) 375-2255, or utilityclerk@bowlinggreenflorida.org / cityclerk@bowlinggreenflorida.org. AUDIT 7/12/2026: Code Ch. 38 Art. II re-read live on Municode — every detail above reconfirmed, still no published amount. ⚠️ DOMAIN MIGRATION: the city's live site is now bowlinggreenfl.net; the old bowlinggreenfl.org site is STALE (last content 2022) — use .net. Searched the new site's Documentation library end-to-end: no fee schedule, no rate resolution posted. ⚠️ LEAD: UTILITIES WORKSHOP held 5/21/2026 (agenda at bowlinggreenfl.net/ova_doc/utilities-workshop-agenda-may-21-2026/) plus an Engineering Services RFQ 5/19/2026 — a rate/capacity-fee study may be underway. Re-check the .net document library each cycle for an adopted rate resolution.
- City Impact Fees (City of Bowling Green, Office) — None$0.00City of Bowling GreenNo municipal development impact fee program. Proved from the city's own codifier (Municode): the Code of Ordinances runs Ch. 1 through Ch. 38 plus Appendix A (Unified Land Development Code) with NO impact-fee chapter. Ch. 38 (Utilities) has only Art. I–IV and carries only water/wastewater capacity, tap and meter fees — utility fees, not city impact fees (recorded in the Water/Sewer Fees - Nonresidential table). Confirmed $0. Pop. ~3,000. Verify: City Hall (863) 375-2255. Researched 7/12/2026.
- County Impact Fees (Hardee County, Office) — None$0.00Hardee CountyHardee County levies NO development impact fees of any kind. Proved two ways: (1) the county's Unified Land Development Code (Municode, codified through Ord. 2024-10, enacted 11-19-2024) contains 13 articles and NO impact-fee article — Art. 8 is 'Public Facilities Monitoring and Performance' (concurrency), not an impact fee; (2) BOCC agenda 11-19-2024 states 'the County does not currently have impact fees.' County adopted impact fees in 2007-08 (Ord. 2007-07 et al.) then suspended/repealed them (Ord. 2008-22) during the recession; never reinstated. 2026 activity is Ord. 2026-06 'Cost Recovery' (Code Ch. 2, Art. IV) — reimbursement of land-development application REVIEW costs, not an impact fee. No county school impact fee (and FL school fees do not apply to nonres regardless). Confirmed $0; applies countywide incl. Bowling Green. Verify: Community Development (863) 767-1964. Researched 7/12/2026.
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Bowling Green
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
How much are commercial impact fees in Bowling Green?
Bowling Green does not currently levy impact fees on commercial development.
Does Bowling Green charge its own impact fees?
Yes. Bowling Green levies its own municipal impact or utility fees. Hardee County does not currently add county-level impact fees inside Bowling Green. The schedule on this page shows every fee that applies to development in Bowling Green.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Hardee County impact fees page.