Bowling Green impact fees by project type
Bowling Green: Single-Family Impact Fees
Bowling Green has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Water Capacity Fee (City of Bowling Green) and Sewer Capacity Fee (City of Bowling Green) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bowling Green impact fee schedule
- Water Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenBowling Green operates its own water utility. A one-time water capacity fee applies but the amount is set by city commission resolution and is not published. The city ordinance also established a capacity-fee waiver of up to 4 ERCs per applicant (by contract), which the commission may end by resolution. Water ERU basis = 300 gpd.
- Sewer Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling GreenBowling Green operates its own wastewater system (not connected to the county utility). A one-time sewer capacity fee applies but the amount is set by city commission resolution and is not published. A capacity-fee waiver of up to 4 ERCs per applicant applies (by contract). Wastewater ERU basis = 225 gpd.
- City Impact Fees (City of Bowling Green) — None$0.00City of Bowling GreenBowling Green levies no municipal development impact fees; only utility connection fees apply.
- County Impact Fees — None$0.00Hardee CountyHardee County does not currently levy any development impact fees. Fees adopted in 2007–08 were repealed in 2008 and have not been reinstated. There is no county school impact fee. (Applies countywide, including Bowling Green.)
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green: Multifamily Impact Fees
Bowling Green has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Sewer Capacity Fee (City of Bowling Green, MF) and Water Capacity Fee (City of Bowling Green, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bowling Green impact fee schedule
- Water Capacity Fee (City of Bowling Green, MF)Requires confirmationCity of Bowling GreenBowling Green operates its own water utility. Multifamily is served by a master meter and the capacity fee is calculated per ERU by the city engineer (not a flat per-unit rate). The amount is set by city commission resolution and is not published. A capacity-fee waiver of up to 4 ERCs per applicant applies. Water ERU basis = 300 gpd.
- Sewer Capacity Fee (City of Bowling Green, MF)Requires confirmationCity of Bowling GreenBowling Green operates its own wastewater system (not connected to the county utility). Multifamily is charged per ERU by the city engineer via master meter (not a flat per-unit rate). The amount is set by city commission resolution and is not published. A capacity-fee waiver of up to 4 ERCs per applicant applies. Wastewater ERU basis = 225 gpd.
- City Impact Fees (City of Bowling Green, MF) — None$0.00City of Bowling GreenBowling Green levies no municipal development impact fees; only utility connection fees apply.
- County Impact Fees — None (MF)$0.00Hardee CountyHardee County does not currently levy any development impact fees. Fees adopted in 2007–08 were repealed in 2008 and have not been reinstated. There is no county school impact fee. (Applies countywide, including Bowling Green.)
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green: Commercial Impact Fees
Commercial development in Bowling Green pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Capacity Fee (City of Bowling Green) and Sewer Capacity Fee (City of Bowling Green) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bowling Green impact fee schedule
- Water Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling Green
- Sewer Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling Green
- City Impact Fees (City of Bowling Green, Commercial) — None$0.00City of Bowling Green
- $0.00
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green: Industrial Impact Fees
Industrial development in Bowling Green pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Capacity Fee (City of Bowling Green) and Sewer Capacity Fee (City of Bowling Green) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bowling Green impact fee schedule
- Water Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling Green
- Sewer Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling Green
- City Impact Fees (City of Bowling Green, Industrial) — None$0.00City of Bowling Green
- $0.00
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green: Office Impact Fees
Office development in Bowling Green pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Capacity Fee (City of Bowling Green) and Sewer Capacity Fee (City of Bowling Green) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bowling Green impact fee schedule
- Water Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling Green
- Sewer Capacity Fee (City of Bowling Green)Requires confirmationCity of Bowling Green
- City Impact Fees (City of Bowling Green, Office) — None$0.00City of Bowling Green
- County Impact Fees (Hardee County, Office) — None$0.00Hardee County
Where in Hardee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bowling Green impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Bowling Green impact fee FAQs
How much are commercial impact fees in Bowling Green?
Bowling Green does not currently levy impact fees on commercial development.
Does Bowling Green charge its own impact fees?
Yes. Bowling Green levies its own municipal impact or utility fees. Hardee County does not currently add county-level impact fees inside Bowling Green. The schedule on this page shows every fee that applies to development in Bowling Green.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Hardee County impact fees page.