Zolfo Springs, Florida Impact Fees

Zolfo Springs applies its own fee schedule. Hardee County does not currently add county-level impact fees inside city limits. A new single-family home pays $2,000.00 per unit (rates sourced ). The full breakdown is below.

Zolfo Springs impact fees by project type

Zolfo Springs: Single-Family Impact Fees

A new single-family home in Zolfo Springs pays $2,000.00 per unit in impact fees (rates sourced August 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (Town of Zolfo Springs) ($1,500.00) and Water Capacity Fee (Town of Zolfo Springs) ($500.00).

View the full Zolfo Springs impact fee schedule
Water$500.00
  • Water Capacity Fee (Town of Zolfo Springs)
    Town of Zolfo Springs
    The Town of Zolfo Springs charges a potable water capacity fee of $500 per equivalent residential connection for properties connecting inside the town limits ($624 per connection outside the town). One equivalent residential connection is 250 gallons per day, defined as a single three-bedroom, two-bath home, so a detached house pays $500. A separate meter/connection charge set administratively may also apply. The amounts have been in place since 2010 and may be amended by town council resolution.
    $500.00
Sewer$1,500.00
  • Sewer Capacity Fee (Town of Zolfo Springs)
    Town of Zolfo Springs
    The Town of Zolfo Springs charges a wastewater capacity fee of $1,500 per equivalent residential connection for properties connecting inside the town limits ($1,875 per connection outside the town). One equivalent residential connection is 250 gallons per day, defined as a single three-bedroom, two-bath home, so a detached house pays $1,500. A separate connection charge set administratively may also apply. The amounts have been in place since 2010 and may be amended by town council resolution.
    $1,500.00
City$0.00
County$0.00
  • County Impact Fees — None
    Hardee County
    Hardee County does not currently levy any development impact fees. Fees adopted in 2007–08 were repealed in 2008 and have not been reinstated. There is no county school impact fee. (Applies countywide, including Zolfo Springs.)
    $0.00
Total (Zolfo Springs): $2,000.00
Sources last checked Official fee schedules:Town of Zolfo Springs Hardee County

Where in Hardee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Zolfo Springs: Multifamily Impact Fees

Zolfo Springs has no published impact fee amounts for a new multifamily unit (rates sourced August 5, 2026). The schedule below documents the status of each fee.

Sewer Connection Fee (Town of Zolfo Springs, MF) and Water Connection Fee (Town of Zolfo Springs, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Zolfo Springs impact fee schedule
Water$0.00
  • Water Connection Fee (Town of Zolfo Springs, MF)
    Town of Zolfo Springs
    Zolfo Springs operates its own water utility. No water connection/capacity fee schedule is currently published, and no per-unit multifamily basis is available.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Zolfo Springs, MF)
    Town of Zolfo Springs
    Zolfo Springs operates its own sewer utility. No sewer connection/capacity fee schedule is currently published, and no per-unit multifamily basis is available.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fees — None (MF)
    Hardee County
    Hardee County does not currently levy any development impact fees. Fees adopted in 2007–08 were repealed in 2008 and have not been reinstated. There is no county school impact fee. (Applies countywide, including Zolfo Springs.)
    $0.00
Total (Zolfo Springs): $0.00
Sources last checked Official fee schedules:Town of Zolfo Springs Hardee County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Hardee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Zolfo Springs: Commercial Impact Fees

Commercial development in Zolfo Springs pays no per-square-foot impact fees, but owes $2,000.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to about $2,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Town of Zolfo Springs) — 1 ERC ($1,500.00 one-time) and Water Capacity Fee (Town of Zolfo Springs) — 1 ERC ($500.00 one-time).

View the full Zolfo Springs impact fee schedule
Water$500.00 one-time
  • Water Capacity Fee (Town of Zolfo Springs) — 1 ERC
    Town of Zolfo Springs
    Potable-water capacity fee of $500 per ERC for connections inside town limits ($624 per ERC outside town limits). One ERC equals 250 gallons per day; a nonresidential project's fee is the town engineer's estimated average daily demand divided by 250, times the per-ERC rate. A separate meter-connection fee also applies.
    $500.00 one-time
Sewer$1,500.00 one-time
  • Sewer Capacity Fee (Town of Zolfo Springs) — 1 ERC
    Town of Zolfo Springs
    Wastewater capacity fee of $1,500 per ERC for connections inside town limits ($1,875 per ERC outside town limits). One ERC equals 250 gallons per day; a nonresidential project's fee is the estimated average daily flow divided by 250, times the per-ERC rate. Industrial or unusually high-strength wastewater may be charged an increased capacity fee.
    $1,500.00 one-time
Total (Zolfo Springs): $2,000.00 one-time (≈ $2,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Zolfo Springs Hardee County

Where in Hardee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Zolfo Springs: Industrial Impact Fees

Industrial development in Zolfo Springs pays no per-square-foot impact fees, but owes $2,000.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to about $2,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Town of Zolfo Springs) — 1 ERC ($1,500.00 one-time) and Water Capacity Fee (Town of Zolfo Springs) — 1 ERC ($500.00 one-time).

View the full Zolfo Springs impact fee schedule
Water$500.00 one-time
  • Water Capacity Fee (Town of Zolfo Springs) — 1 ERC
    Town of Zolfo Springs
    Potable-water capacity fee of $500 per ERC for connections inside town limits ($624 per ERC outside town limits). One ERC equals 250 gallons per day; a nonresidential project's fee is the town engineer's estimated average daily demand divided by 250, times the per-ERC rate. A separate meter-connection fee also applies.
    $500.00 one-time
Sewer$1,500.00 one-time
  • Sewer Capacity Fee (Town of Zolfo Springs) — 1 ERC
    Town of Zolfo Springs
    Wastewater capacity fee of $1,500 per ERC for connections inside town limits ($1,875 per ERC outside town limits). One ERC equals 250 gallons per day; a nonresidential project's fee is the estimated average daily flow divided by 250, times the per-ERC rate. Industrial or unusually high-strength wastewater may be charged an increased capacity fee.
    $1,500.00 one-time
Total (Zolfo Springs): $2,000.00 one-time (≈ $2,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Zolfo Springs Hardee County

Where in Hardee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Zolfo Springs: Office Impact Fees

Office development in Zolfo Springs pays no per-square-foot impact fees, but owes $2,000.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 25,000 sq ft building, that comes to about $2,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Town of Zolfo Springs) — 1 ERC ($1,500.00 one-time) and Water Capacity Fee (Town of Zolfo Springs) — 1 ERC ($500.00 one-time).

View the full Zolfo Springs impact fee schedule
Water$500.00 one-time
  • Water Capacity Fee (Town of Zolfo Springs) — 1 ERC
    Town of Zolfo Springs
    Potable-water capacity fee of $500 per ERC for connections inside town limits ($624 per ERC outside town limits). One ERC equals 250 gallons per day; a nonresidential project's fee is the town engineer's estimated average daily demand divided by 250, times the per-ERC rate. A separate meter-connection fee also applies.
    $500.00 one-time
Sewer$1,500.00 one-time
  • Sewer Capacity Fee (Town of Zolfo Springs) — 1 ERC
    Town of Zolfo Springs
    Wastewater capacity fee of $1,500 per ERC for connections inside town limits ($1,875 per ERC outside town limits). One ERC equals 250 gallons per day; a nonresidential project's fee is the estimated average daily flow divided by 250, times the per-ERC rate. Industrial or unusually high-strength wastewater may be charged an increased capacity fee.
    $1,500.00 one-time
Total (Zolfo Springs): $2,000.00 one-time (≈ $2,000.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Zolfo Springs Hardee County

Where in Hardee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Zolfo Springs impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Zolfo Springs impact fee FAQs

What are the total impact fees for a single-family home in Zolfo Springs, Florida?

A new single-family home in Zolfo Springs pays $2,000.00 per unit in combined impact fees (rates sourced August 5, 2026).

How much are commercial impact fees in Zolfo Springs?

Commercial development in Zolfo Springs pays no per-square-foot impact fees, but owes $2,000.00 in one-time water and sewer connection fees.

Does Zolfo Springs charge its own impact fees?

Yes. Zolfo Springs levies its own municipal impact or utility fees. Hardee County does not currently add county-level impact fees inside Zolfo Springs. The schedule on this page shows every fee that applies to development in Zolfo Springs.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hardee County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.