Clewiston, Florida Impact Fees

Clewiston applies its own fee schedule: municipal fees plus the Hendry County-levied fees that apply inside city limits. Combined, a new single-family home pays $8,582.00 per unit (rates sourced July 13, 2026). The full breakdown is below.

Clewiston impact fees by project type

Clewiston: Single-Family Impact Fees

A new single-family home in Clewiston pays $8,582.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Hendry County-levied fees account for $6,249.00 and municipal or utility fees for $2,333.00.

The largest line items are County Impact Fees (Hendry County, in Clewiston) ($6,249.00), Water Capacity + Tapping Fee (City of Clewiston) — $1,133 capacity + $550 3/4" tap ($1,683.00) and Sewer Capacity + Tapping Fee (City of Clewiston) — $600 capacity + $50 tap ($650.00).

View the full fee schedule
Water$1,683.00
  • Water Capacity + Tapping Fee (City of Clewiston) — $1,133 capacity + $550 3/4" tap
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A (Tax and Fee Schedule), codified through Ord. 2025-08 (7-21-2025), Supp. 9. Sec. 22 'Water and sewer development fee' — Single-family residence: water system capacity fee $1,133.00 (1.0 ERU). Sec. 16 'Water and sewer tapping fees' — 3/4-inch meter (including backflow preventer) $550.00. Total one-time water charge inside city = $1,683.00. Outside corporate limits = 125% of the in-city development fee (Sec. 22(c)); SSWA connections billed at the in-city rate. Amounts are codified in Appendix A, not a separate resolution.
    $1,683.00
Sewer$650.00
  • Sewer Capacity + Tapping Fee (City of Clewiston) — $600 capacity + $50 tap
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A (Tax and Fee Schedule), codified through Ord. 2025-08 (7-21-2025), Supp. 9. Sec. 22 'Water and sewer development fee' — Single-family residence: sewer system capacity fee $600.00 (1.0 ERU). Sec. 16(b) — sewer tapping/connection fee $50.00. Total one-time sewer charge inside city = $650.00. Outside corporate limits = 125% of the in-city development fee (Sec. 22(c)).
    $650.00
City$0.00
  • City Impact Fees (City of Clewiston) — None
    City of Clewiston
    No municipal impact fee program. Full Clewiston Code chapter list reviewed (Ch. 1–102+) — no Impact Fees chapter (Ch. 90 Concurrency Management only, no dev. impact fee). County impact fees apply within city (see County record). $0 None.
    $0.00
County$6,249.00
  • County Impact Fees (Hendry County, in Clewiston)
    Hendry County
    Hendry County impact fees, Ord. 2024-06 (eff. Feb 10, 2025), collected within City of Clewiston. SFR (LUC 210) Clewiston total $6,249/du = Transportation $1,400 + EMS $221 + Correctional $97 + School $4,531. Law Enforcement ($465) N/A in Clewiston — city has its own police dept (per 'Total Clewiston' column). Source: Hendry Master Fee Schedule.
    $6,249.00
Total (Clewiston): $8,582.00
Sources last checked July 13, 2026Official fee schedules:City of Clewiston Hendry County

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston: Multifamily Impact Fees

A new multifamily unit in Clewiston pays $6,717.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Hendry County-levied fees account for $4,984.00 and municipal or utility fees for $1,733.00.

The largest line items are County Impact Fees (Hendry County in Clewiston, MF Mid/High-Rise) ($4,984.00), Water Capacity Fee (City of Clewiston, MF) ($1,133.00) and Sewer Capacity Fee (City of Clewiston, MF) ($600.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,133.00
  • Water Capacity Fee (City of Clewiston, MF)
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A, Sec. 22 'Water and sewer development fee' (codified through Ord. 2025-08, 7-21-2025, Supp. 9). Apartment/condominium: water system capacity fee $1,133.00 per unit, 1.0 Equivalent Residential Unit — the schedule assigns MF the same 1.0 ERU as a single-family residence by design, so MF = SFR capacity fee here (not a copy error). Excludes the Sec. 16 tapping fee, which is charged per METER (3/4" $550 / 1" $650 / 1.5" $700 / 2" $800), not per unit — a master-metered apartment building pays one tap fee sized to its meter. Outside corporate limits = 125% (Sec. 22(c)).
    $1,133.00
Sewer$600.00
  • Sewer Capacity Fee (City of Clewiston, MF)
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A, Sec. 22 'Water and sewer development fee' (codified through Ord. 2025-08, 7-21-2025, Supp. 9). Apartment/condominium: sewer system capacity fee $600.00 per unit, 1.0 ERU — same ERU basis as single-family by design. Excludes the Sec. 16(b) sewer tapping fee ($50.00 per connection, not per unit). Outside corporate limits = 125% (Sec. 22(c)).
    $600.00
City$0.00
County$4,984.00
  • County Impact Fees (Hendry County in Clewiston, MF Mid/High-Rise)
    Hendry County
    Hendry County impact fees, Ord. 2024-06 (eff. Feb 10, 2025), in City of Clewiston. MF Mid/High-Rise 4+ floors (LUC 221/222) Clewiston total $4,984/du = Transportation $635 + EMS $75 + Correctional $53 + School $4,221. Law Enforcement N/A — Clewiston own police. Default MF tier (4+ floors). Source: Hendry Master Fee Schedule.
    $4,984.00
Total (Clewiston): $6,717.00
Sources last checked July 13, 2026Official fee schedules:City of Clewiston Hendry County

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston: Commercial Impact Fees

Commercial development in Clewiston pays $2.26 per square foot in impact fees, plus $1,783.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $114,983.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Capacity Fee (City of Clewiston) — 1.0 ERU base ($1,133.00 one-time), Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base ($600.00 one-time) and Sewer Tapping Fee (City of Clewiston) ($50.00 one-time).

View the full fee schedule
Water$1,133.00 one-time
  • Water System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A (Tax and Fee Schedule), Sec. 22 'Water and sewer development fee', codified through Ord. 2025-08 (7-21-2025), Supp. 9. NO METER-SIZE TABLE for the capacity fee — Clewiston sets it by ERU factor per land-use unit, base 1.0 ERU = $1,133.00 water (§22(a)). Nonres formula = ERU factor × $1,133. Published nonres ERU factors (§22(b)): Retail/wholesale store 0.3 per 1,000 sq ft ($340/1,000 sf); Office 0.6 per 1,000 sq ft ($680/1,000 sf); Storage/warehouse 0.15 per 1,000 sq ft ($170/1,000 sf); Dentist/doctor office 1.0 per 1,000 sq ft ($1,133); Restaurant 1.0 per 10 seats; Carwash 3.0 per bay; Motel/hotel 0.6 per room. Outside corporate limits = 125% of the in-city amount (§22(c)). Tapping fee is a separate charge (see Water Tapping Fee records). Fee Amount here holds the 1.0-ERU base per Guide's no-meter-table rule.
    $1,133.00 one-time
Sewer$650.00 one-time
  • Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A, Sec. 22 'Water and sewer development fee' (thru Ord. 2025-08, Supp. 9). NO METER-SIZE TABLE — set by ERU factor per land-use unit, base 1.0 ERU = $600.00 sewer (§22(a)). Nonres formula = ERU factor × $600. Published nonres ERU factors (§22(b)): Retail/wholesale store 0.3 per 1,000 sq ft ($180/1,000 sf); Office 0.6 per 1,000 sq ft ($360/1,000 sf); Storage/warehouse 0.15 per 1,000 sq ft ($90/1,000 sf); Dentist/doctor office 1.0 per 1,000 sq ft ($600); Restaurant 1.0 per 10 seats; Carwash 3.0 per bay. Outside corporate limits = 125% (§22(c)). Sewer tapping fee is separate (see Sewer Tapping Fee record).
    $600.00 one-time
  • Sewer Tapping Fee (City of Clewiston)
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A, Sec. 16(b) (thru Ord. 2025-08, Supp. 9): flat $50.00 tapping/connection fee for every person connecting to the city sewer system — not scaled by meter size or ERU. Charged in addition to the Sec. 22 sewer system capacity fee.
    $50.00 one-time
City$0.00
  • City Impact Fees (City of Clewiston, Commercial) — None
    City of Clewiston
    CONFIRMED $0 — Clewiston levies NO municipal impact/development fee of any kind on nonresidential development. Proved two ways: (1) Appendix A (Tax and Fee Schedule), codified through Ord. 2025-08 (7-21-2025), Supp. 9 — the city's complete adopted fee schedule contains ZERO occurrences of the word 'impact'; its only development-related charges are building/permit fees (Sec. 1), tapping fees (Sec. 16) and water/sewer development (capacity) fees (Sec. 22), all captured in the W/S table. (2) Full chapter list reviewed — no Impact Fees chapter (Ch. 90 is Concurrency Management, no development impact fee). Hendry County impact fees DO apply inside Clewiston (see County records, 'Total Clewiston' column).
    $0.00
County$2.26/sq ft
  • County Impact Fee (Hendry County, in Clewiston, Commercial)
    Hendry County
    Hendry County impact fees, Ord. 2024-06 (eff. 2-10-2025), collected within the City of Clewiston. Read from the schedule's dedicated 'Total Clewiston' ADOPTED column — the Law Enforcement component ($681) is EXCLUDED in Clewiston because the city runs its own police department. Schedule row: ITE LUC 821 Commercial/Shopping Center 40,000 to 150,000 sfgla; basis per 1,000 sf GLA. $2,264 = Transportation $1,908 + EMS $216 + Correctional $140. No school fee on nonres.
    $2.26/sq ft
Total (Clewiston): $2.26/sq ft + $1,783.00 one-time (≈ $114,983.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Clewiston Hendry County

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston: Industrial Impact Fees

Industrial development in Clewiston pays $0.68 per square foot in impact fees, plus $1,783.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $35,733.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Capacity Fee (City of Clewiston) — 1.0 ERU base ($1,133.00 one-time), Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base ($600.00 one-time) and Sewer Tapping Fee (City of Clewiston) ($50.00 one-time).

View the full fee schedule
Water$1,133.00 one-time
  • Water System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A (Tax and Fee Schedule), Sec. 22 'Water and sewer development fee', codified through Ord. 2025-08 (7-21-2025), Supp. 9. NO METER-SIZE TABLE for the capacity fee — Clewiston sets it by ERU factor per land-use unit, base 1.0 ERU = $1,133.00 water (§22(a)). Nonres formula = ERU factor × $1,133. Published nonres ERU factors (§22(b)): Retail/wholesale store 0.3 per 1,000 sq ft ($340/1,000 sf); Office 0.6 per 1,000 sq ft ($680/1,000 sf); Storage/warehouse 0.15 per 1,000 sq ft ($170/1,000 sf); Dentist/doctor office 1.0 per 1,000 sq ft ($1,133); Restaurant 1.0 per 10 seats; Carwash 3.0 per bay; Motel/hotel 0.6 per room. Outside corporate limits = 125% of the in-city amount (§22(c)). Tapping fee is a separate charge (see Water Tapping Fee records). Fee Amount here holds the 1.0-ERU base per Guide's no-meter-table rule.
    $1,133.00 one-time
Sewer$650.00 one-time
  • Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A, Sec. 22 'Water and sewer development fee' (thru Ord. 2025-08, Supp. 9). NO METER-SIZE TABLE — set by ERU factor per land-use unit, base 1.0 ERU = $600.00 sewer (§22(a)). Nonres formula = ERU factor × $600. Published nonres ERU factors (§22(b)): Retail/wholesale store 0.3 per 1,000 sq ft ($180/1,000 sf); Office 0.6 per 1,000 sq ft ($360/1,000 sf); Storage/warehouse 0.15 per 1,000 sq ft ($90/1,000 sf); Dentist/doctor office 1.0 per 1,000 sq ft ($600); Restaurant 1.0 per 10 seats; Carwash 3.0 per bay. Outside corporate limits = 125% (§22(c)). Sewer tapping fee is separate (see Sewer Tapping Fee record).
    $600.00 one-time
  • Sewer Tapping Fee (City of Clewiston)
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A, Sec. 16(b) (thru Ord. 2025-08, Supp. 9): flat $50.00 tapping/connection fee for every person connecting to the city sewer system — not scaled by meter size or ERU. Charged in addition to the Sec. 22 sewer system capacity fee.
    $50.00 one-time
City$0.00
  • City Impact Fees (City of Clewiston, Industrial) — None
    City of Clewiston
    CONFIRMED $0 — Clewiston levies no municipal impact/development fee. Appendix A (Tax and Fee Schedule, thru Ord. 2025-08, Supp. 9) contains no impact fee; full chapter list has no Impact Fees chapter. Hendry County impact fees apply inside the city (see County records).
    $0.00
County$0.68/sq ft
  • County Impact Fee (Hendry County, in Clewiston, Industrial)
    Hendry County
    Hendry County impact fees, Ord. 2024-06 (eff. 2-10-2025), collected within the City of Clewiston. 'Total Clewiston' ADOPTED column — Law Enforcement ($112) excluded (city has its own PD). Schedule row: ITE LUC 110 General Light Industrial, per 1,000 sf GFA. $679 = Transportation $621 + EMS $35 + Correctional $23. No school fee on nonres.
    $0.68/sq ft
Total (Clewiston): $0.68/sq ft + $1,783.00 one-time (≈ $35,733.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Clewiston Hendry County

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston: Office Impact Fees

Office development in Clewiston pays $1.50 per square foot in impact fees, plus $1,783.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to about $39,408.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Capacity Fee (City of Clewiston) — 1.0 ERU base ($1,133.00 one-time), Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base ($600.00 one-time) and Sewer Tapping Fee (City of Clewiston) ($50.00 one-time).

View the full fee schedule
Water$1,133.00 one-time
  • Water System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A (Tax and Fee Schedule), Sec. 22 'Water and sewer development fee', codified through Ord. 2025-08 (7-21-2025), Supp. 9. NO METER-SIZE TABLE for the capacity fee — Clewiston sets it by ERU factor per land-use unit, base 1.0 ERU = $1,133.00 water (§22(a)). Nonres formula = ERU factor × $1,133. Published nonres ERU factors (§22(b)): Retail/wholesale store 0.3 per 1,000 sq ft ($340/1,000 sf); Office 0.6 per 1,000 sq ft ($680/1,000 sf); Storage/warehouse 0.15 per 1,000 sq ft ($170/1,000 sf); Dentist/doctor office 1.0 per 1,000 sq ft ($1,133); Restaurant 1.0 per 10 seats; Carwash 3.0 per bay; Motel/hotel 0.6 per room. Outside corporate limits = 125% of the in-city amount (§22(c)). Tapping fee is a separate charge (see Water Tapping Fee records). Fee Amount here holds the 1.0-ERU base per Guide's no-meter-table rule.
    $1,133.00 one-time
Sewer$650.00 one-time
  • Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A, Sec. 22 'Water and sewer development fee' (thru Ord. 2025-08, Supp. 9). NO METER-SIZE TABLE — set by ERU factor per land-use unit, base 1.0 ERU = $600.00 sewer (§22(a)). Nonres formula = ERU factor × $600. Published nonres ERU factors (§22(b)): Retail/wholesale store 0.3 per 1,000 sq ft ($180/1,000 sf); Office 0.6 per 1,000 sq ft ($360/1,000 sf); Storage/warehouse 0.15 per 1,000 sq ft ($90/1,000 sf); Dentist/doctor office 1.0 per 1,000 sq ft ($600); Restaurant 1.0 per 10 seats; Carwash 3.0 per bay. Outside corporate limits = 125% (§22(c)). Sewer tapping fee is separate (see Sewer Tapping Fee record).
    $600.00 one-time
  • Sewer Tapping Fee (City of Clewiston)
    City of Clewiston
    CONFIRMED. Clewiston Code Appendix A, Sec. 16(b) (thru Ord. 2025-08, Supp. 9): flat $50.00 tapping/connection fee for every person connecting to the city sewer system — not scaled by meter size or ERU. Charged in addition to the Sec. 22 sewer system capacity fee.
    $50.00 one-time
City$0.00
  • City Impact Fees (City of Clewiston, Office) — None
    City of Clewiston
    CONFIRMED $0 — Clewiston levies no municipal impact/development fee. Appendix A (Tax and Fee Schedule, thru Ord. 2025-08, Supp. 9) contains no impact fee; full chapter list has no Impact Fees chapter. Hendry County impact fees apply inside the city (see County records).
    $0.00
County$1.50/sq ft
  • County Impact Fee (Hendry County, in Clewiston, Office)
    Hendry County
    Hendry County impact fees, Ord. 2024-06 (eff. 2-10-2025), collected within the City of Clewiston. 'Total Clewiston' ADOPTED column — Law Enforcement ($236) excluded (city has its own PD). Schedule row: ITE LUC 710 Office, per 1,000 sf GFA. $1,505 = Transportation $1,381 + EMS $75 + Correctional $49. No school fee on nonres.
    $1.50/sq ft
Total (Clewiston): $1.50/sq ft + $1,783.00 one-time (≈ $39,408.00 at 25,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Clewiston Hendry County

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Clewiston

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Clewiston, Florida?

A new single-family home in Clewiston pays $8,582.00 per unit in combined impact fees (rates sourced July 13, 2026).

How much are commercial impact fees in Clewiston?

Commercial development in Clewiston pays $2.26 per square foot in impact fees, plus $1,783.00 in one-time water and sewer connection fees, about $114,983.00 for a 50,000 sq ft building.

Does Clewiston charge its own impact fees?

Yes. Clewiston levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Clewiston, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hendry County impact fees page.