Clewiston, Florida Impact Fees

Clewiston applies its own fee schedule: municipal fees plus the Hendry County-levied fees that apply inside city limits. Combined, a new single-family home pays $8,582.00 per unit (rates sourced ). The full breakdown is below.

Clewiston impact fees by project type

Clewiston: Single-Family Impact Fees

A new single-family home in Clewiston pays $8,582.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Hendry County-levied fees account for $6,249.00 and municipal or utility fees for $2,333.00.

The largest line items are County Impact Fees (Hendry County, in Clewiston) ($6,249.00), Water Capacity + Tapping Fee (City of Clewiston) ($1,683.00) and Sewer Capacity + Tapping Fee (City of Clewiston) ($650.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Clewiston impact fee schedule
Water$1,683.00
  • Water Capacity + Tapping Fee (City of Clewiston)
    3/4" meter
    City of Clewiston
    One-time water charge inside the City of Clewiston for a single-family home: a system capacity fee (1.0 ERU) plus a tapping fee for the standard 3/4″ meter. Tapping fees rise with meter size (3/4″, 1″, 1.5″, 2″). Codified in the city's Tax and Fee Schedule (Appendix A), current through 2025. Connections outside the corporate limits are charged 125% of the in-city development fee.
    $1,683.00
Sewer$650.00
  • Sewer Capacity + Tapping Fee (City of Clewiston)
    City of Clewiston
    One-time sewer charge inside the City of Clewiston for a single-family home: a system capacity fee (1.0 ERU) plus a tapping/connection fee. Codified in the city's Tax and Fee Schedule (Appendix A), current through 2025. Connections outside the corporate limits are charged 125% of the in-city development fee.
    $650.00
City$0.00
  • City Impact Fees (City of Clewiston) — None
    City of Clewiston
    The City of Clewiston has no municipal impact-fee program (its code carries only concurrency management, not development impact fees). Hendry County impact fees apply within the city.
    $0.00
County$6,249.00
  • County Impact Fees (Hendry County, in Clewiston)
    Hendry County
    Hendry County impact fees (Ordinance 2024-06, effective Feb 10, 2025) are collected within the City of Clewiston. The single-family amount covers transportation, EMS, correctional, and school; county law enforcement does not apply because Clewiston has its own police department. School is the largest component. Fees are adopted at a percentage of the calculated study rate (transportation 25%, correctional 25%, school 40%; EMS 100%).
    $6,249.00
Total (Clewiston): $8,582.00
Sources last checked Official fee schedules:City of Clewiston Hendry County

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston: Multifamily Impact Fees

A new multifamily unit in Clewiston pays $6,717.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Hendry County-levied fees account for $4,984.00 and municipal or utility fees for $1,733.00.

The largest line items are County Impact Fees (Hendry County in Clewiston, MF Mid/High-Rise) ($4,984.00), Water Capacity Fee (City of Clewiston, MF) ($1,133.00) and Sewer Capacity Fee (City of Clewiston, MF) ($600.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Clewiston impact fee schedule
Water$1,133.00
  • Water Capacity Fee (City of Clewiston, MF)
    City of Clewiston
    One-time water capacity fee inside the City of Clewiston, charged per apartment/condominium unit at 1.0 ERU — the same ERU basis as a single-family home by design (not a copy error). Excludes the tapping fee, which is charged once per building sized to the master meter (3/4″ $550 up to 2″ $800). Codified in the Tax and Fee Schedule (Appendix A), current through 2025. Outside the corporate limits: 125%.
    $1,133.00
Sewer$600.00
  • Sewer Capacity Fee (City of Clewiston, MF)
    City of Clewiston
    One-time sewer capacity fee inside the City of Clewiston, charged per apartment/condominium unit at 1.0 ERU — the same ERU basis as a single-family home by design. Excludes the per-connection sewer tapping fee (charged once per building, not per unit). Codified in the city's Tax and Fee Schedule (Appendix A), current through 2025. Outside the corporate limits: 125%.
    $600.00
City$0.00
County$4,984.00
  • County Impact Fees (Hendry County in Clewiston, MF Mid/High-Rise)
    Mid/High-Rise (4+ floors)
    Hendry County
    Hendry County impact fees (Ordinance 2024-06, effective Feb 10, 2025), collected within the City of Clewiston. Default multifamily rate (mid/high-rise, 4+ floors); the low-rise (1-3 floors) tier carries a higher transportation component. County law enforcement does not apply (Clewiston has its own police department). Covers transportation, EMS, correctional, and school.
    $4,984.00
Total (Clewiston): $6,717.00
Sources last checked Official fee schedules:City of Clewiston Hendry County

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston: Commercial Impact Fees

Commercial development in Clewiston pays $2.26 per square foot in impact fees, plus $2,433.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $115,633.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Capacity Fee (City of Clewiston) — 1.0 ERU base ($1,133.00 one-time), Water Tapping Fee (City of Clewiston) — 1" meter ($650.00 one-time) and Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Clewiston impact fee schedule
Water$1,783.00 one-time
  • Water System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    Clewiston water system capacity (development) fee. The nonresidential charge equals the land-use ERU factor times the $1,133 base — for example retail 0.3, office 0.6, and warehouse 0.15 per 1,000 sq ft; medical/dental office 1.0 per 1,000 sq ft. Properties outside the city limits pay 125%. A separate water tapping fee also applies.
    $1,133.00 one-time
  • Water Tapping Fee (City of Clewiston) — 1" meter
    City of Clewiston
    Clewiston water tapping fee, charged by meter size (amount shown is for a 1-inch meter). Charged in addition to the water system capacity fee.
    $650.00 one-time
Sewer$650.00 one-time
  • Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    Clewiston sewer system capacity (development) fee. The nonresidential charge equals the land-use ERU factor times the $600 base — for example retail 0.3, office 0.6, and warehouse 0.15 per 1,000 sq ft; medical/dental office 1.0 per 1,000 sq ft. Properties outside the city limits pay 125%. A separate sewer tapping fee also applies.
    $600.00 one-time
  • Sewer Tapping Fee (City of Clewiston)
    City of Clewiston
    Flat Clewiston sewer tapping/connection fee, charged in addition to the sewer system capacity fee.
    $50.00 one-time
City$0.00
County$2.26/sq ft
  • County Impact Fee (Hendry County, in Clewiston, Commercial)
    40,000-150,000 sf GLA
    Hendry County
    Hendry County impact fee, effective February 10, 2025 (Ord. 2024-06), collected within the City of Clewiston; the Law Enforcement component is excluded because the city operates its own police department. Rate is for a retail/shopping center of 40,000–150,000 sq ft gross leasable area (the standard tier), per 1,000 sq ft GLA. Smaller and larger centers pay different rates — see the other size tiers.
    $2.26/sq ft
Total (Clewiston): $2.26/sq ft + $2,433.00 one-time (≈ $115,633.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Clewiston Hendry County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston: Industrial Impact Fees

Industrial development in Clewiston pays $0.68 per square foot in impact fees, plus $2,433.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $36,383.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Capacity Fee (City of Clewiston) — 1.0 ERU base ($1,133.00 one-time), Water Tapping Fee (City of Clewiston) — 1" meter ($650.00 one-time) and Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Clewiston impact fee schedule
Water$1,783.00 one-time
  • Water System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    Clewiston water system capacity (development) fee. The nonresidential charge equals the land-use ERU factor times the $1,133 base — for example retail 0.3, office 0.6, and warehouse 0.15 per 1,000 sq ft; medical/dental office 1.0 per 1,000 sq ft. Properties outside the city limits pay 125%. A separate water tapping fee also applies.
    $1,133.00 one-time
  • Water Tapping Fee (City of Clewiston) — 1" meter
    City of Clewiston
    Clewiston water tapping fee, charged by meter size (amount shown is for a 1-inch meter). Charged in addition to the water system capacity fee.
    $650.00 one-time
Sewer$650.00 one-time
  • Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    Clewiston sewer system capacity (development) fee. The nonresidential charge equals the land-use ERU factor times the $600 base — for example retail 0.3, office 0.6, and warehouse 0.15 per 1,000 sq ft; medical/dental office 1.0 per 1,000 sq ft. Properties outside the city limits pay 125%. A separate sewer tapping fee also applies.
    $600.00 one-time
  • Sewer Tapping Fee (City of Clewiston)
    City of Clewiston
    Flat Clewiston sewer tapping/connection fee, charged in addition to the sewer system capacity fee.
    $50.00 one-time
City$0.00
County$0.68/sq ft
  • County Impact Fee (Hendry County, in Clewiston, Industrial)
    Hendry County
    Hendry County impact fee, effective February 10, 2025 (Ord. 2024-06), collected within the City of Clewiston; the Law Enforcement component is excluded because the city operates its own police department. General light industrial, per 1,000 sq ft gross floor area.
    $0.68/sq ft
Total (Clewiston): $0.68/sq ft + $2,433.00 one-time (≈ $36,383.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Clewiston Hendry County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston: Office Impact Fees

Office development in Clewiston pays $1.50 per square foot in impact fees, plus $2,433.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to about $40,058.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Capacity Fee (City of Clewiston) — 1.0 ERU base ($1,133.00 one-time), Water Tapping Fee (City of Clewiston) — 1" meter ($650.00 one-time) and Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Clewiston impact fee schedule
Water$1,783.00 one-time
  • Water System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    Clewiston water system capacity (development) fee. The nonresidential charge equals the land-use ERU factor times the $1,133 base — for example retail 0.3, office 0.6, and warehouse 0.15 per 1,000 sq ft; medical/dental office 1.0 per 1,000 sq ft. Properties outside the city limits pay 125%. A separate water tapping fee also applies.
    $1,133.00 one-time
  • Water Tapping Fee (City of Clewiston) — 1" meter
    City of Clewiston
    Clewiston water tapping fee, charged by meter size (amount shown is for a 1-inch meter). Charged in addition to the water system capacity fee.
    $650.00 one-time
Sewer$650.00 one-time
  • Sewer System Capacity Fee (City of Clewiston) — 1.0 ERU base
    City of Clewiston
    Clewiston sewer system capacity (development) fee. The nonresidential charge equals the land-use ERU factor times the $600 base — for example retail 0.3, office 0.6, and warehouse 0.15 per 1,000 sq ft; medical/dental office 1.0 per 1,000 sq ft. Properties outside the city limits pay 125%. A separate sewer tapping fee also applies.
    $600.00 one-time
  • Sewer Tapping Fee (City of Clewiston)
    City of Clewiston
    Flat Clewiston sewer tapping/connection fee, charged in addition to the sewer system capacity fee.
    $50.00 one-time
City$0.00
County$1.50/sq ft
  • County Impact Fee (Hendry County, in Clewiston, Office)
    Hendry County
    Hendry County impact fee, effective February 10, 2025 (Ord. 2024-06), collected within the City of Clewiston; the Law Enforcement component is excluded because the city operates its own police department. General office, per 1,000 sq ft gross floor area.
    $1.50/sq ft
Total (Clewiston): $1.50/sq ft + $2,433.00 one-time (≈ $40,058.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Clewiston Hendry County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hendry County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Clewiston impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Clewiston impact fee FAQs

What are the total impact fees for a single-family home in Clewiston, Florida?

A new single-family home in Clewiston pays $8,582.00 per unit in combined impact fees (rates sourced July 13, 2026).

How much are commercial impact fees in Clewiston?

Commercial development in Clewiston pays $2.26 per square foot in impact fees, plus $2,433.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $115,633.00 for a 50,000 sq ft building.

Does Clewiston charge its own impact fees?

Yes. Clewiston levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Clewiston, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hendry County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.