LaBelle impact fees by project type
LaBelle: Single-Family Impact Fees
A new single-family home in LaBelle pays $14,383.33 per unit in impact fees (rates sourced August 19, 2026). Of that, Hendry County-levied fees account for $6,714.00 and municipal or utility fees for $7,669.33.
The largest line items are County Impact Fees (Hendry County, in LaBelle) ($6,714.00), Water Impact + Meter Fee (City of LaBelle) ($4,116.31) and Sewer Impact + Connection Fee (City of LaBelle) ($3,553.02).
View the full LaBelle impact fee schedule
- Water Impact + Meter Fee (City of LaBelle)$4,116.31City of LaBelleInside city limits, the City of LaBelle charges a one-time water impact fee of $3,378.24 plus a meter installation charge sized to the meter — $738.07 for the standard 5/8x3/4-inch meter, $4,116.31 in total. Larger meters cost more, and service outside the city limits is charged at a higher rate. Rate effective November 12, 2020; the city does not post a newer utility fee schedule online.
- Sewer Impact + Connection Fee (City of LaBelle)$3,553.02City of LaBelleInside city limits, the City of LaBelle charges a one-time sewer impact fee of $3,197.25 plus a connection fee of $355.77 — $3,553.02 in total. An additional $3.50 per running foot applies for any sewer pipe needed to extend the line to the property line. Service outside the city limits is charged at a higher rate. Rate effective November 12, 2020; the city does not post a newer utility fee schedule online.
- City Impact Fees (City of LaBelle) — None$0.00City of LaBelleThe City of LaBelle has no municipal impact-fee program. Hendry County impact fees apply within the city.
- County Impact Fees (Hendry County, in LaBelle)$6,714.00Hendry CountyHendry County impact fees (Ordinance 2024-06, effective Feb 10, 2025) are collected within the City of LaBelle under an interlocal agreement. The single-family amount covers transportation, EMS, correctional, law enforcement, and school (school is the largest component). Law enforcement applies because the Hendry County Sheriff serves LaBelle. Fees are adopted at a percentage of the calculated study rate (transportation 25%, correctional 25%, school 40%; EMS and law enforcement 100%).
Where in Hendry County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
LaBelle: Multifamily Impact Fees
A new multifamily unit in LaBelle pays $12,887.33 per unit in impact fees (rates sourced August 19, 2026). Of that, Hendry County-levied fees account for $5,218.00 and municipal or utility fees for $7,669.33.
The largest line items are County Impact Fees (Hendry County in LaBelle, MF Mid/High-Rise) ($5,218.00), Water Impact + Meter Fee (City of LaBelle, MF) ($4,116.31) and Sewer Impact + Connection Fee (City of LaBelle, MF) ($3,553.02).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full LaBelle impact fee schedule
- Water Impact + Meter Fee (City of LaBelle, MF)$4,116.31City of LaBelleThe City of LaBelle charges a one-time water impact fee of $3,378.24 plus a meter charge ($738.07 for the standard 5/8x3/4-inch meter) for each residential unit — $4,116.31 per unit. Where several units share a master meter, the owner pays the impact and meter charges as if each unit were separately metered. Rate effective November 12, 2020; the city does not post a newer schedule. Service outside the city limits is charged at a higher rate.
- Sewer Impact + Connection Fee (City of LaBelle, MF)$3,553.02City of LaBelleThe City of LaBelle charges a one-time sewer impact fee of $3,197.25 plus a connection fee of $355.77 for each residential unit — $3,553.02 per unit. Where several units share a master meter, the owner pays as if each unit were separately metered. An additional $3.50 per running foot applies for any pipe needed to extend the sewer line to the property line. Rate effective November 12, 2020; the city does not post a newer schedule.
- City Impact Fees (City of LaBelle, MF) — None$0.00City of LaBelleThe City of LaBelle has no municipal impact-fee program. Hendry County impact fees apply within the city.
- County Impact Fees (Hendry County in LaBelle, MF Mid/High-Rise)$5,218.00Mid/High-Rise (4+ floors)Hendry CountyHendry County impact fees (Ordinance 2024-06, effective Feb 10, 2025), collected within the City of LaBelle. Default multifamily rate (mid/high-rise, 4+ floors); the low-rise (1-3 floors) tier carries a higher transportation component. LaBelle pays the full total. Covers transportation, EMS, correctional, law enforcement, and school.
Where in Hendry County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
LaBelle: Commercial Impact Fees
Commercial development in LaBelle pays $2.94 per square foot in impact fees, plus $7,925.64 in one-time water and sewer connection fees (rates sourced August 19, 2026).
For a 50,000 sq ft building, that comes to about $155,175.64. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Charge (City of LaBelle) — 1" meter ($994.38 one-time), Sewer Connection Fee (City of LaBelle) ($355.77 one-time) and County Impact Fee (Hendry County, in LaBelle, Commercial) ($2.94/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of LaBelle) and Water Impact Fee (City of LaBelle) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full LaBelle impact fee schedule
- Water Impact Fee (City of LaBelle)$3,378.24 one-timeRequires confirmationCity of LaBelleCity of LaBelle water impact fee, adopted effective November 12, 2020. Applies inside the city limits; properties outside the city pay a higher rate. A separate water meter (capital) charge, scaled by meter size, also applies.
- Water Meter Charge (City of LaBelle) — 1" meter$994.38 one-timeCity of LaBelleOne-time City of LaBelle water meter (capital) charge, by meter size (amount shown is for a 1-inch meter, inside the city; outside-city rates are higher). Charged in addition to the water impact fee.
- Sewer Impact Fee (City of LaBelle)$3,197.25 one-timeRequires confirmationCity of LaBelleCity of LaBelle sewer impact fee, adopted effective November 12, 2020. Applies inside the city limits. A separate sewer connection fee also applies.
- Sewer Connection Fee (City of LaBelle)$355.77 one-timeCity of LaBelleFlat City of LaBelle sewer connection fee (inside the city limits), charged in addition to the sewer impact fee.
- City Impact Fees (City of LaBelle, Commercial) — None$0.00City of LaBelleThe City of LaBelle levies no municipal impact fee on nonresidential development. Hendry County impact fees still apply within the city (shown separately).
- County Impact Fee (Hendry County, in LaBelle, Commercial)$2.94/sq ft40,000-150,000 sf GLAHendry CountyHendry County impact fee, effective February 10, 2025 (Ord. 2024-06), collected within the City of LaBelle at the full county rate (includes the Law Enforcement component; the County Sheriff serves LaBelle). Rate is for a retail/shopping center of 40,000–150,000 sq ft gross leasable area (the standard tier), per 1,000 sq ft GLA. Smaller and larger centers pay different rates — see the other size tiers.
Where in Hendry County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
LaBelle: Industrial Impact Fees
Industrial development in LaBelle pays $0.79 per square foot in impact fees, plus $7,925.64 in one-time water and sewer connection fees (rates sourced August 19, 2026).
For a 50,000 sq ft building, that comes to about $47,475.64. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Charge (City of LaBelle) — 1" meter ($994.38 one-time), Sewer Connection Fee (City of LaBelle) ($355.77 one-time) and County Impact Fee (Hendry County, in LaBelle, Industrial) ($0.79/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of LaBelle) and Water Impact Fee (City of LaBelle) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full LaBelle impact fee schedule
- Water Impact Fee (City of LaBelle)$3,378.24 one-timeRequires confirmationCity of LaBelleCity of LaBelle water impact fee, adopted effective November 12, 2020. Applies inside the city limits; properties outside the city pay a higher rate. A separate water meter (capital) charge, scaled by meter size, also applies.
- Water Meter Charge (City of LaBelle) — 1" meter$994.38 one-timeCity of LaBelleOne-time City of LaBelle water meter (capital) charge, by meter size (amount shown is for a 1-inch meter, inside the city; outside-city rates are higher). Charged in addition to the water impact fee.
- Sewer Impact Fee (City of LaBelle)$3,197.25 one-timeRequires confirmationCity of LaBelleCity of LaBelle sewer impact fee, adopted effective November 12, 2020. Applies inside the city limits. A separate sewer connection fee also applies.
- Sewer Connection Fee (City of LaBelle)$355.77 one-timeCity of LaBelleFlat City of LaBelle sewer connection fee (inside the city limits), charged in addition to the sewer impact fee.
- City Impact Fees (City of LaBelle, Industrial) — None$0.00City of LaBelleThe City of LaBelle levies no municipal impact fee on nonresidential development. Hendry County impact fees still apply within the city (shown separately).
- County Impact Fee (Hendry County, in LaBelle, Industrial)$0.79/sq ftHendry CountyHendry County impact fee, effective February 10, 2025 (Ord. 2024-06), collected within the City of LaBelle at the full county rate (includes the Law Enforcement component; the County Sheriff serves LaBelle). General light industrial, per 1,000 sq ft gross floor area.
Where in Hendry County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
LaBelle: Office Impact Fees
Office development in LaBelle pays $1.74 per square foot in impact fees, plus $7,925.64 in one-time water and sewer connection fees (rates sourced August 19, 2026).
For a 25,000 sq ft building, that comes to about $51,450.64. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Charge (City of LaBelle) — 1" meter ($994.38 one-time), Sewer Connection Fee (City of LaBelle) ($355.77 one-time) and County Impact Fee (Hendry County, in LaBelle, Office) ($1.74/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of LaBelle) and Water Impact Fee (City of LaBelle) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full LaBelle impact fee schedule
- Water Impact Fee (City of LaBelle)$3,378.24 one-timeRequires confirmationCity of LaBelleCity of LaBelle water impact fee, adopted effective November 12, 2020. Applies inside the city limits; properties outside the city pay a higher rate. A separate water meter (capital) charge, scaled by meter size, also applies.
- Water Meter Charge (City of LaBelle) — 1" meter$994.38 one-timeCity of LaBelleOne-time City of LaBelle water meter (capital) charge, by meter size (amount shown is for a 1-inch meter, inside the city; outside-city rates are higher). Charged in addition to the water impact fee.
- Sewer Impact Fee (City of LaBelle)$3,197.25 one-timeRequires confirmationCity of LaBelleCity of LaBelle sewer impact fee, adopted effective November 12, 2020. Applies inside the city limits. A separate sewer connection fee also applies.
- Sewer Connection Fee (City of LaBelle)$355.77 one-timeCity of LaBelleFlat City of LaBelle sewer connection fee (inside the city limits), charged in addition to the sewer impact fee.
- City Impact Fees (City of LaBelle, Office) — None$0.00City of LaBelleThe City of LaBelle levies no municipal impact fee on nonresidential development. Hendry County impact fees still apply within the city (shown separately).
- County Impact Fee (Hendry County, in LaBelle, Office)$1.74/sq ftHendry CountyHendry County impact fee, effective February 10, 2025 (Ord. 2024-06), collected within the City of LaBelle at the full county rate (includes the Law Enforcement component; the County Sheriff serves LaBelle). General office, per 1,000 sq ft gross floor area.
Where in Hendry County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
LaBelle impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
LaBelle impact fee FAQs
What are the total impact fees for a single-family home in LaBelle, Florida?
A new single-family home in LaBelle pays $14,383.33 per unit in combined impact fees (rates sourced August 19, 2026).
How much are commercial impact fees in LaBelle?
Commercial development in LaBelle pays $2.94 per square foot in impact fees, plus $7,925.64 in one-time water and sewer connection fees (assuming a 1-inch meter), about $155,175.64 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does LaBelle charge its own impact fees?
Yes. LaBelle levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in LaBelle, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.