Brooksville Impact Fees by Project Type
Brooksville: Single-Family Impact Fees
A new single-family home in Brooksville pays $16,294.00 per unit in impact fees (rates sourced October 18, 2026). Of that, Hernando County-levied fees account for $6,405.00 and municipal or utility fees for $9,889.00.
The largest line items are Sewer Connection Fee (City of Brooksville) ($6,467.00), Water Connection Fee (City of Brooksville) ($765.00) and Water Meter Installation Charge (City of Brooksville) — 5/8" x 3/4" meter ($500.00).
City Impact Fee (City of Brooksville) and County Impact Fee (Brooksville) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Brooksville Impact Fee Schedule
- Water Connection Fee (City of Brooksville)$765.00City of Brooksville Utilities DepartmentThe City of Brooksville charges a water connection fee of $765 per residential dwelling unit, set by the city council's 2025 annual fee resolution. Water meter deposit and meter installation charges are billed separately, as are any permitting or impact fees.
- Water Meter Installation Charge (City of Brooksville) — 5/8" x 3/4" meter$500.00City of BrooksvilleCity of Brooksville charge to set a new 5/8" x 3/4" water meter where the service line is already in place, paid in addition to the water connection fee. Installing the meter and service line together costs more ($2,005 to $5,405 by size), and meters over 2 inches are billed at actual cost.
- Sewer Connection Fee (City of Brooksville)$6,467.00City of Brooksville Utilities DepartmentThe City of Brooksville charges a wastewater connection fee of $6,467 per residential dwelling unit, set by the city council's 2025 annual fee resolution. A separate wastewater tap installation charge of $1,260 applies for a residential service installation, and more where boring is required.
- City Impact Fee (City of Brooksville)$2,157.00Requires confirmationCity of BrooksvilleCity of Brooksville municipal impact fee for a single-family home (about 2,000 sq ft): $2,157 per dwelling unit for building permit applications on or after October 1, 2026, comprising Public Buildings $467, Parks & Recreation $676 and Multi-Modal (transportation) $1,014 under Code Sec. 50-13 (Ord. 955). The city's former $245 fire rescue impact fee was repealed by Ordinance 2026-1020 when fire rescue services consolidated with Hernando County. This city fee is in addition to Hernando County impact fees collected on city-issued permits.
- County Impact Fee (Brooksville)$6,405.00Requires confirmationHernando County Board of County CommissionersHernando County impact fees collected on City of Brooksville single-family permits, modeled as Educational Facilities $6,135, Library $107, Law Enforcement $156 and Jail $7, for $6,405 per dwelling unit (Phase Two, effective December 2, 2025, Ordinance 2024-10). County parks and roads fees reach a city only by interlocal agreement, and the city levies its own parks, public buildings and multimodal fees. This county fee is in addition to the city's own impact fee.
Where in Hernando County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brooksville: Multifamily Impact Fees
A new multifamily unit in Brooksville pays $9,065.00 per unit in impact fees (rates sourced October 18, 2026). Of that, Hernando County-levied fees account for $4,046.00 and municipal or utility fees for $5,019.00.
The largest line items are Sewer Connection Fee (City of Brooksville, MF) ($4,041.00), Water Meter Installation Charge (City of Brooksville, MF) — 5/8" x 3/4" meter ($500.00) and Water Connection Fee (City of Brooksville, MF) ($478.00).
County Impact Fee — Mid/High Rise 3+ Stories (Brooksville, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Brooksville Impact Fee Schedule
- Water Meter Installation Charge (City of Brooksville, MF) — 5/8" x 3/4" meter$500.00City of BrooksvilleCity of Brooksville charge to set a new 5/8 by 3/4 inch water meter where the service line is already in place, paid in addition to the water connection fee. It is charged per meter: a building on one master meter pays once for its meter size. Installing the meter and service line together costs more ($2,005 to $5,405 by size), and meters over 2 inches are billed at actual cost.
- Water Connection Fee (City of Brooksville, MF)$478.00City of Brooksville Utilities DepartmentThe City of Brooksville charges a water connection fee of $478 per dwelling unit for master-metered residential service, the rate that applies to apartment and condominium buildings. Individually metered dwelling units pay $765. These amounts come from the city council's 2025 annual fee resolution, and meter deposit and installation charges are billed separately.
- Sewer Connection Fee (City of Brooksville, MF)$4,041.00City of Brooksville Utilities DepartmentThe City of Brooksville charges a wastewater connection fee of $4,041 per dwelling unit for master-metered residential service, the rate that applies to apartment and condominium buildings. Individually metered dwelling units pay the higher single-family rate. These amounts come from the city council's 2025 annual fee resolution.
- City Impact Fee (City of Brooksville, MF)$0.00City of BrooksvilleThe City of Brooksville's adopted impact fee schedule, in effect since 2023, sets fees for four land uses only: single-family residential, light industrial, office and retail. It contains no multifamily category, so the city publishes no multifamily impact fee amount. Hernando County impact fees are a separate charge and do apply to permits issued inside the city.
- County Impact Fee — Mid/High Rise 3+ Stories (Brooksville, MF)$4,046.00Requires confirmationHernando County Board of County CommissionersHernando County impact fees collected on City of Brooksville multifamily permits (mid/high-rise, 3+ stories), modeled as Educational Facilities $3,846, Library $81, Law Enforcement $114 and Jail $5, for $4,046 per dwelling unit (Phase Two, effective December 2, 2025, Ordinance 2024-10). County parks and roads fees reach a city only by interlocal agreement. This is the default multifamily tier (a typical 4-story building).
Where in Hernando County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brooksville: Commercial Impact Fees
Commercial development in Brooksville pays $9.44 per square foot in impact fees, plus $8,027.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).
For a 50,000 sq ft building, that comes to about $479,927.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Brooksville) ($6,467.00 one-time), Water Meter Installation Charge (City of Brooksville) — 1" meter ($795.00 one-time) and Water Connection Fee (City of Brooksville) ($765.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Impact Fee (City of Brooksville, Commercial) and County Impact Fee (Brooksville, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Brooksville Impact Fee Schedule
- Water Meter Installation Charge (City of Brooksville) — 1" meter$795.00 one-timeCity of BrooksvilleCity of Brooksville charge to set a new 1" water meter where the service line is already in place, paid in addition to the water connection fee. Installing the meter and service line together costs more ($2,005 to $5,405 by size), and meters over 2 inches are billed at actual cost.
- Water Connection Fee (City of Brooksville)$765.00 one-timeCity of Brooksville Utilities DepartmentWater connection fee of $765 per equivalent residential unit (ERU) under City of Brooksville Resolution 2026-17, the fiscal year 2026-27 fee schedule adopted September 14, 2026; the city sets the ERU count from the total fixture units on the building plans. The amount shown is one ERU. Water meter installation charges and the meter deposit are billed separately.
- Sewer Connection Fee (City of Brooksville)$6,467.00 one-timeCity of Brooksville Utilities DepartmentWastewater connection fee of $6,467 per equivalent residential unit (ERU) under City of Brooksville Resolution 2026-17, the fiscal year 2026-27 fee schedule adopted September 14, 2026; the city sets the ERU count from the total fixture units on the building plans. The amount shown is one ERU. Wastewater tap installation charges are billed separately.
- City Impact Fee (City of Brooksville, Commercial)$2.18/sq ftRequires confirmationCity of BrooksvilleRate for building permit applications on or after October 1, 2026: Public Buildings $826 plus Multi-Modal (transportation) $1,351 per 1,000 sq ft under Code Sec. 50-13 (Ord. 955, effective January 9, 2023); parks and recreation does not apply to nonresidential uses. The city's former $433 fire rescue component was repealed by Ordinance 2026-1020 when fire rescue consolidated with Hernando County. Hernando County impact fees apply within the city in addition to this fee, with no city offset.
- County Impact Fee (Brooksville, Commercial)$7.26/sq ftRequires confirmationHernando CountyHernando County impact fees apply within the City of Brooksville and stack on top of the city's own impact fees. Rate effective December 2, 2025 (Ord. 2024-10). Excludes the in-city fire component, which is administered separately by the City of Brooksville fire benefit district.
Where in Hernando County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brooksville: Industrial Impact Fees
Industrial development in Brooksville pays $2.75 per square foot in impact fees, plus $8,027.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).
For a 50,000 sq ft building, that comes to about $145,477.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Brooksville) ($6,467.00 one-time), Water Meter Installation Charge (City of Brooksville) — 1" meter ($795.00 one-time) and Water Connection Fee (City of Brooksville) ($765.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fee (Brooksville, Industrial) and City Impact Fee (City of Brooksville, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Brooksville Impact Fee Schedule
- Water Meter Installation Charge (City of Brooksville) — 1" meter$795.00 one-timeCity of BrooksvilleCity of Brooksville charge to set a new 1" water meter where the service line is already in place, paid in addition to the water connection fee. Installing the meter and service line together costs more ($2,005 to $5,405 by size), and meters over 2 inches are billed at actual cost.
- Water Connection Fee (City of Brooksville)$765.00 one-timeCity of Brooksville Utilities DepartmentWater connection fee of $765 per equivalent residential unit (ERU) under City of Brooksville Resolution 2026-17, the fiscal year 2026-27 fee schedule adopted September 14, 2026; the city sets the ERU count from the total fixture units on the building plans. The amount shown is one ERU. Water meter installation charges and the meter deposit are billed separately.
- Sewer Connection Fee (City of Brooksville)$6,467.00 one-timeCity of Brooksville Utilities DepartmentWastewater connection fee of $6,467 per equivalent residential unit (ERU) under City of Brooksville Resolution 2026-17, the fiscal year 2026-27 fee schedule adopted September 14, 2026; the city sets the ERU count from the total fixture units on the building plans. The amount shown is one ERU. Wastewater tap installation charges are billed separately.
- City Impact Fee (City of Brooksville, Industrial)$0.60/sq ftRequires confirmationCity of BrooksvilleRate for building permit applications on or after October 1, 2026: Public Buildings $154 plus Multi-Modal (transportation) $447 per 1,000 sq ft under Code Sec. 50-13 (Ord. 955, effective January 9, 2023); parks and recreation does not apply to nonresidential uses. The city's former $80 fire rescue component was repealed by Ordinance 2026-1020 when fire rescue consolidated with Hernando County. Hernando County impact fees apply within the city in addition to this fee, with no city offset.
- County Impact Fee (Brooksville, Industrial)$2.15/sq ftRequires confirmationHernando CountyHernando County impact fees apply within the City of Brooksville and stack on top of the city's own impact fees. Rate effective December 2, 2025 (Ord. 2024-10). Excludes the in-city fire component, which is administered separately by the City of Brooksville fire benefit district.
Where in Hernando County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brooksville: Office Impact Fees
Office development in Brooksville pays $6.05 per square foot in impact fees, plus $8,027.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).
For a 25,000 sq ft building, that comes to about $159,352.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Brooksville) ($6,467.00 one-time), Water Meter Installation Charge (City of Brooksville) — 1" meter ($795.00 one-time) and Water Connection Fee (City of Brooksville) ($765.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fee (Brooksville, Office) and City Impact Fee (City of Brooksville, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Brooksville Impact Fee Schedule
- Water Meter Installation Charge (City of Brooksville) — 1" meter$795.00 one-timeCity of BrooksvilleCity of Brooksville charge to set a new 1" water meter where the service line is already in place, paid in addition to the water connection fee. Installing the meter and service line together costs more ($2,005 to $5,405 by size), and meters over 2 inches are billed at actual cost.
- Water Connection Fee (City of Brooksville)$765.00 one-timeCity of Brooksville Utilities DepartmentWater connection fee of $765 per equivalent residential unit (ERU) under City of Brooksville Resolution 2026-17, the fiscal year 2026-27 fee schedule adopted September 14, 2026; the city sets the ERU count from the total fixture units on the building plans. The amount shown is one ERU. Water meter installation charges and the meter deposit are billed separately.
- Sewer Connection Fee (City of Brooksville)$6,467.00 one-timeCity of Brooksville Utilities DepartmentWastewater connection fee of $6,467 per equivalent residential unit (ERU) under City of Brooksville Resolution 2026-17, the fiscal year 2026-27 fee schedule adopted September 14, 2026; the city sets the ERU count from the total fixture units on the building plans. The amount shown is one ERU. Wastewater tap installation charges are billed separately.
- City Impact Fee (City of Brooksville, Office)$1.31/sq ftRequires confirmationCity of BrooksvilleRate for building permit applications on or after October 1, 2026: Public Buildings $314 plus Multi-Modal (transportation) $998 per 1,000 sq ft under Code Sec. 50-13 (Ord. 955, effective January 9, 2023); parks and recreation does not apply to nonresidential uses. The city's former $164 fire rescue component was repealed by Ordinance 2026-1020 when fire rescue consolidated with Hernando County. Hernando County impact fees apply within the city in addition to this fee, with no city offset.
- County Impact Fee (Brooksville, Office)$4.74/sq ftRequires confirmationHernando CountyHernando County impact fees apply within the City of Brooksville and stack on top of the city's own impact fees. Rate effective December 2, 2025 (Ord. 2024-10). Excludes the in-city fire component, which is administered separately by the City of Brooksville fire benefit district.
Where in Hernando County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brooksville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Brooksville Impact Fee FAQs
What are the total impact fees for a single-family home in Brooksville, Florida?
A new single-family home in Brooksville pays $16,294.00 per unit in combined impact fees (rates sourced October 18, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Brooksville?
Commercial development in Brooksville pays $9.44 per square foot in impact fees, plus $8,027.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $479,927.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Brooksville charge its own impact fees?
Yes. Brooksville levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Brooksville, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Hernando County impact fees page.