Brooksville, Florida Impact Fees

Brooksville applies its own fee schedule: municipal fees plus the Hernando County-levied fees that apply inside city limits. Combined, a new single-family home pays $16,039.00 per unit (rates sourced August 5, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Brooksville impact fees by project type

Brooksville: Single-Family Impact Fees

A new single-family home in Brooksville pays $16,039.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Hernando County-levied fees account for $6,405.00 and municipal or utility fees for $9,634.00.

The largest line items are Sewer Connection Fee (City of Brooksville) ($6,467.00), City Impact Fee (City of Brooksville) ($2,402.00) and Water Connection Fee (City of Brooksville) ($765.00).

County Impact Fee (Brooksville) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$765.00
  • Water Connection Fee (City of Brooksville)
    City of Brooksville Utilities Department
    Internal research note: City of Brooksville Resolution No. 2025-19 (annual fee resolution; Exhibit A, 'Water and Wastewater Connection Fees' page 22). Water Connection Fee Schedule, minimum connection fee per equivalent residential unit: ERU $765.00; Residential Service (per residential dwelling unit) $765.00; Master-metered Residential Service (per residential dwelling unit) $478.00; one commercial unit (1 ERU) $765.00. Code basis: ch. 86 art. V sec. 86-281 (impact fees assessed on an ERU basis; rates fixed by council resolution). Confirmed by rendering p. 22 of the scanned PDF at 160 dpi. Separate charges of record: water meter deposit $250 (5/8 x 3/4), meter installation $500 (meter only) or $2,005 (meter and service line). SB 180 awareness note: Res. 2025-19 is a 2025 fee resolution, i.e. after the 8/1/2024 retroactivity date; utility connection/capacity charges are generally outside the F.S. 163.31801 impact fee definition, but flagging in case Hernando County falls inside an SB 180 designated area. 8/5/2026
    $765.00
Sewer$6,467.00
  • Sewer Connection Fee (City of Brooksville)
    City of Brooksville Utilities Department
    CORRECTED 8/5/2026 (adversarial verification) from $6,476 to $6,467, resolving the ambiguity the 8/5 handoff flagged for an owner call. Brooksville's own document contains both figures; the schedule's internal arithmetic settles which is real. The city prices strictly per fixture unit, and the WATER table fixes the convention: ERU 24 FU at $765.00 = $31.875/FU, so master-metered 15 FU = $478.125, published as $478 (truncated to the dollar). Applying that same convention to wastewater at an ERU rate of $6,467 gives 15/24 x $6,467 = $4,041.875 -> $4,041, which is EXACTLY the city's published master-metered wastewater figure. At $6,476 it would be $4,047.50 -> $4,047/$4,048, which the city does not publish. $6,467 also matches the summary box at the top of the same page ('Wastewater Connection Fee, 1.0 ERU, $6,467') and the water table's structure, where all three ERU-basis lines agree. The two occurrences of '$6,476' are a transposition of 6467. Difference $9.00 (0.14%).
    $6,467.00
City$2,402.00
  • City Impact Fee (City of Brooksville)
    City of Brooksville
    Code Ch. 50, Sec. 50-13 (Ord. No. 955, eff. Jan 9, 2023). Land use 'Single family (2k sf), per du': Fire Rescue $245 + Public Buildings $467 + Parks & Recreation $676 + Multi-Modal $1,014 = $2,402. Re-verified 7/23/2026 against Municode (Supp. 15, codified through Ord. 973, 4/1/2024) — still the operative schedule. The Sec. 50-13 table has ONLY four land-use rows (single family, light industrial, office, retail) — there is NO multifamily row. Adopted study: City of Brooksville 2022 Municipal Impact Fee Study (Benesch, 9/23/2022).
    $2,402.00
County$6,405.00
  • County Impact Fee (Brooksville)
    COMPONENTS PARTIALLY VERIFIABLE, CITY MIX ASSUMED (8/4/2026; Hernando family — Phase 2 schedule eff. 12/2/2025 verified today for the MF sibling). The record's $6,405 needs re-derivation against the Phase 2 SFR column; the in-Brooksville premise (county collects only Education/Library/Law/Jail inside the city) is stated nowhere in the schedule. County Impact Fees (352) 754-4057.
    $6,405.00Requires confirmation
Total (Brooksville): $16,039.00
Sources last checked August 5, 2026Official fee schedules:City of Brooksville Utilities Department City of Brooksville
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hernando County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Hernando County$19,996.00
Brooksville$16,039.00this pageIncludes unconfirmed fees

Brooksville: Multifamily Impact Fees

A new multifamily unit in Brooksville pays $8,565.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Hernando County-levied fees account for $4,046.00 and municipal or utility fees for $4,519.00.

The largest line items are Sewer Connection Fee (City of Brooksville, MF) ($4,041.00) and Water Connection Fee (City of Brooksville, MF) ($478.00).

County Impact Fee — Mid/High Rise 3+ Stories (Brooksville, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$478.00
  • Water Connection Fee (City of Brooksville, MF)
    City of Brooksville Utilities Department
    Internal research note: City of Brooksville Resolution No. 2025-19, Exhibit A, Water Connection Fee Schedule: 'Master-metered Residential Service (per residential dwelling unit)' = $478.00 at 15 fixture units / 156 gpd per unit, versus $765.00 for an individually metered residential dwelling unit. A 4-story apartment building is master-metered, so $478 per unit is the correct MF figure. Directionally consistent with code sec. 86-281(a) assessing multifamily and apartments at 64 percent of the ERU rate ($765 x 0.64 = $490); the resolution controls. Confirmed by rendering p. 22 of the scanned resolution PDF. 8/5/2026
    $478.00
Sewer$4,041.00
  • Sewer Connection Fee (City of Brooksville, MF)
    City of Brooksville Utilities Department
    Internal research note: City of Brooksville Resolution No. 2025-19, Exhibit A, Wastewater Connection Fee Schedule: 'Master-metered Residential Service (per residential dwelling unit)' = $4,041.00, at 15 fixture units / 125 gpd per dwelling unit, versus $6,476 for an individually metered residential dwelling unit. A 4-story apartment building is master-metered, so the per-unit master-metered rate is the correct MF figure. Directionally consistent with code sec. 86-281(a), which assesses multifamily and apartments at 64 percent of the ERU rate ($6,467 x 0.64 = $4,139); the resolution controls over the code's percentage. Confirmed by rendering p. 22 of the scanned PDF. 8/5/2026
    $4,041.00
City$0.00
  • City Impact Fee (City of Brooksville, MF)
    City of Brooksville
    Internal research note: Brooksville City Code ch. 50 (Impact Fees), adopted by Ord. No. 955 on 1-9-2023, imposes fire rescue, public buildings, parks and recreation, and multimodal impact fees. Sec. 50-13(a) sets out the complete adopted schedule and it enumerates exactly four land uses: Single family (2k sf), per du — $245 fire rescue, $467 public buildings, $676 parks and recreation, $1,014 multimodal, $2,402 total; Light Industrial per 1,000 sf $681 total; Office (50k sf) per 1,000 sf $1,476 total; Retail per 1,000 sf $2,610 total. There is no multifamily or apartment land use category and no per-dwelling-unit rate other than single family. Confirmed the code is current (Municode Supp. 15, codified through Ord. No. 973 adopted 4-1-2024) and that the city's separate 2025 annual fee resolution contains no impact fee schedule at all. Note for context: the city's fee schedule page warns that Hernando County impact fees apply to permits issued after 12/1/2024 — that county fee is a distinct charge from this city fee row. 8/5/2026
    $0.00
County$4,046.00
  • County Impact Fee — Mid/High Rise 3+ Stories (Brooksville, MF)
    COMPONENT MATH VERIFIED, BROOKSVILLE CATEGORY MIX UNRESOLVED (re-checked 8/3/2026). $4,046 = Educ $3,846 + Library $81 + Law Enf $114 + Jail $5, exactly matching the Phase 2 column (eff. 12/2/2025, Ord. 2024-10) of the current county schedule for MF Mid/High-Rise 3+ levels (full unincorporated total $6,966 adds Pub Bldgs $352, Parks $358, Roads $1,976, Fire/EMS $234). Flag stays: every fee division in Code Ch. 23 Art. III conditions municipal applicability on an interlocal agreement, no source lists which interlocals Brooksville has executed, and a fire/EMS interlocal was still being negotiated in late 2025. Sec. 23-48(b) confirms Brooksville is its own fire benefit district (supporting the Fire/EMS exclusion). Phone-only for the exact category mix.
    $4,046.00Requires confirmation
Total (Brooksville): $8,565.00
Sources last checked August 5, 2026Official fee schedules:City of Brooksville Utilities Department City of Brooksville
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hernando County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Hernando County$6,966.00
Brooksville$8,565.00this pageIncludes unconfirmed fees

Brooksville: Commercial Impact Fees

Commercial development in Brooksville pays $9.87 per square foot in impact fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to at least $493,550.00. The calculator below adjusts to your exact square footage.

The largest line items are City Impact Fee (City of Brooksville, Commercial) ($2.61/sq ft).

County Impact Fee (Brooksville, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Impact Fee (City of Brooksville) and Water Impact Fee (City of Brooksville) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (City of Brooksville)
    City of Brooksville Utilities Department
    UNCONFIRMED AMOUNT — rate is not published anywhere. Code Ch. 86, Art. V, Sec. 86-281 imposes a water impact fee on an ERU basis (1 ERU = 24 water-supply fixture units = 250 gpd), so a nonresidential building's fee = its fixture-unit count ÷ 24 × the $/ERU rate; there is no meter-size ladder. Sec. 86-281(c): 'Impact fee rates shall be fixed by the city council by resolution' — and that resolution is NOT published: not codified, absent from the city's Amended Final Fee Schedule (permit/administrative fees only), and the New Construction utility application leaves the connection-fee line blank ('subject to the rates in effect at the time of payment'). Sec. 86-281(b): installation/hook-up charges are separate and additional. Web search 7/12/2026 surfaced no posted schedule. Call Utilities Customer Service, 600 S. Brooksville Ave, 352-540-3860, for the current $/ERU.
    Requires confirmation
Sewer$0.00
  • Sewer Impact Fee (City of Brooksville)
    City of Brooksville Utilities Department
    UNCONFIRMED AMOUNT — rate is not published anywhere. Code Ch. 86, Art. V, Sec. 86-281 imposes a sanitary sewer impact fee on an ERU basis (1 ERU = 24 drainage fixture units = 200 gpd sewer); nonresidential fee = fixture-unit count ÷ 24 × the $/ERU rate. No meter-size ladder. Sec. 86-281(c): rates 'fixed by the city council by resolution'; the operative resolution is unpublished (not codified, not in the city fee schedule, blank on the New Construction utility application). Sec. 86-281(b): hook-up/installation charges are separate and additional. Web search 7/12/2026 found no posted schedule. Call Utilities, 352-540-3860.
    Requires confirmation
City$2.61/sq ft
  • City Impact Fee (City of Brooksville, Commercial)
    City of Brooksville
    Code Ch. 50, Sec. 50-13 (Ord. No. 955, eff. 1-9-2023; adopted study: City of Brooksville 2022 Municipal Impact Fee Study, Benesch, 9/23/2022). Schedule row: 'Retail (125 sq ft)' [sic — the printed label is a typo for 125k sq ft], per 1,000 sf. Components: Fire Rescue $433 + Public Buildings $826 + Parks & Recreation — (none) + Multi-Modal $1,351 = $2,610. Parks & Rec is expressly blank for all three nonresidential rows. Sec. 50-13 has only four land-use rows total (single family, light industrial, office, retail). Verified on Municode 7/12/2026.
    $2.61/sq ft
County$7.26/sq ft
  • County Impact Fee (Brooksville, Commercial)
    Hernando County
    Hernando County Impact Fee Schedule; Ord. No. 2024-10 (adopted 7/30/2024), Phase 2 column eff. 12/2/2025 = final phase. Schedule row: RETAIL/SHOPPING CENTER, per 1,000 SF GLA (gross leasable, not GFA). CORRECTED ON AUDIT 2026-07-13 (was $256). County fees apply INSIDE the City of Brooksville by codified applicability, not by assumption: Ch. 23 Art. III has SIX divisions, and Div. 3 Public Capital Facilities (Sec. 23-86(c)) and Div. 5 Roads (Sec. 23-133(c)) each expressly apply 'to the unincorporated area of Hernando County and to the incorporated areas.' Brooksville Code Ch. 50 contains NO credit or offset against county fees, so the city's Ch. 50 fee STACKS on top — the prior 'city fee displaces the county's Roads/Public Buildings components' assumption is unsupported and omitted the $6,318 Roads component. Components applied: Public Buildings $651 + Law Enforcement $246 + Jail $10 (all Div. 3) + Roads $6,318 (Div. 5) + Hernando County EMS $36 = $7,261. Educational, Library and Parks are $0 on every nonres row. FIRE/EMS TREATMENT IS THE REMAINING OPEN ITEM (why still Unconfirmed): Sec. 23-48(b) makes the City of Brooksville its own fire benefit district and Sec. 23-46's schedule carries a separate 'City of Brooksville' fire column ($397 retail) whose trust fund is held and administered by the CITY (Sec. 23-49(a)(1), Sec. 23-50(a)) — so the county column ($512) does NOT apply in-city and the city-district fire fee is excluded here to avoid double-counting the Ch. 50 Fire Rescue component. Only the 'H County EMS' column ($36, eff. 08-14-13) is treated as county-collected. CONFIRM the in-city fire/EMS component with Hernando County Zoning (352-754-4048) or Brooksville Building Division (352-540-3853). Note: Sec. 23-46 has since been amended by Ord. No. 2026-04 (2-3-26); the codified table (current through Ord. 2026-06) still shows the same 12/2/2025 nonres rates, so no rate change.
    $7.26/sq ftRequires confirmation
Total (Brooksville): $9.87/sq ft (≈ $493,550.00 at 50,000 sq ft)
Sources last checked August 5, 2026Official fee schedules:City of Brooksville Utilities Department City of Brooksville Hernando County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hernando County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Hernando County$406,750.00
Brooksville$493,550.00this pageIncludes unconfirmed fees

Brooksville: Industrial Impact Fees

Industrial development in Brooksville pays $2.83 per square foot in impact fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to at least $141,450.00. The calculator below adjusts to your exact square footage.

The largest line items are City Impact Fee (City of Brooksville, Industrial) ($0.68/sq ft).

County Impact Fee (Brooksville, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Impact Fee (City of Brooksville) and Water Impact Fee (City of Brooksville) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (City of Brooksville)
    City of Brooksville Utilities Department
    UNCONFIRMED AMOUNT — rate is not published anywhere. Code Ch. 86, Art. V, Sec. 86-281 imposes a water impact fee on an ERU basis (1 ERU = 24 water-supply fixture units = 250 gpd), so a nonresidential building's fee = its fixture-unit count ÷ 24 × the $/ERU rate; there is no meter-size ladder. Sec. 86-281(c): 'Impact fee rates shall be fixed by the city council by resolution' — and that resolution is NOT published: not codified, absent from the city's Amended Final Fee Schedule (permit/administrative fees only), and the New Construction utility application leaves the connection-fee line blank ('subject to the rates in effect at the time of payment'). Sec. 86-281(b): installation/hook-up charges are separate and additional. Web search 7/12/2026 surfaced no posted schedule. Call Utilities Customer Service, 600 S. Brooksville Ave, 352-540-3860, for the current $/ERU.
    Requires confirmation
Sewer$0.00
  • Sewer Impact Fee (City of Brooksville)
    City of Brooksville Utilities Department
    UNCONFIRMED AMOUNT — rate is not published anywhere. Code Ch. 86, Art. V, Sec. 86-281 imposes a sanitary sewer impact fee on an ERU basis (1 ERU = 24 drainage fixture units = 200 gpd sewer); nonresidential fee = fixture-unit count ÷ 24 × the $/ERU rate. No meter-size ladder. Sec. 86-281(c): rates 'fixed by the city council by resolution'; the operative resolution is unpublished (not codified, not in the city fee schedule, blank on the New Construction utility application). Sec. 86-281(b): hook-up/installation charges are separate and additional. Web search 7/12/2026 found no posted schedule. Call Utilities, 352-540-3860.
    Requires confirmation
City$0.68/sq ft
  • City Impact Fee (City of Brooksville, Industrial)
    City of Brooksville
    Code Ch. 50, Sec. 50-13 (Ord. No. 955, eff. 1-9-2023). Schedule row: 'Light Industrial', per 1,000 sf. Components: Fire Rescue $80 + Public Buildings $154 + Parks & Recreation — (none) + Multi-Modal $447 = $681. Verified on Municode 7/12/2026.
    $0.68/sq ft
County$2.15/sq ft
  • County Impact Fee (Brooksville, Industrial)
    Hernando County
    Hernando County Impact Fee Schedule; Ord. No. 2024-10 (adopted 7/30/2024), Phase 2 column eff. 12/2/2025 = final phase. Schedule row: GENERAL LIGHT INDUSTRIAL, per 1,000 sq ft GFA. CORRECTED ON AUDIT 2026-07-13 (was $49). Same basis as the Brooksville Commercial county record: Ch. 23 Art. III Div. 3 Public Capital Facilities (Sec. 23-86(c)) and Div. 5 Roads (Sec. 23-133(c)) expressly apply in the incorporated areas, and Brooksville Ch. 50 has no credit/offset against county fees, so county fees stack with the city's. The prior amount rested on an unsupported 'displacement' assumption and omitted the $1,922 Roads component. Components: Public Buildings $168 + Law Enforcement $46 + Jail $3 + Roads $1,922 + Hernando County EMS $9 = $2,148 (Educational, Library, Parks $0 on all nonres rows). STILL UNCONFIRMED: the in-city fire/EMS component — Sec. 23-48(b) makes Brooksville its own fire benefit district with a separate city-administered rate column ($77 light industrial), excluded here to avoid double-counting Ch. 50's Fire Rescue line. CONFIRM with Hernando County Zoning (352-754-4048) or Brooksville Building Division (352-540-3853).
    $2.15/sq ftRequires confirmation
Total (Brooksville): $2.83/sq ft (≈ $141,450.00 at 50,000 sq ft)
Sources last checked August 5, 2026Official fee schedules:City of Brooksville Utilities Department City of Brooksville Hernando County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hernando County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Hernando County$131,600.00
Brooksville$141,450.00this pageIncludes unconfirmed fees

Brooksville: Office Impact Fees

Office development in Brooksville pays $6.22 per square foot in impact fees (rates sourced August 5, 2026).

For a 25,000 sq ft building, that comes to at least $155,425.00. The calculator below adjusts to your exact square footage.

The largest line items are City Impact Fee (City of Brooksville, Office) ($1.48/sq ft).

County Impact Fee (Brooksville, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Impact Fee (City of Brooksville) and Water Impact Fee (City of Brooksville) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (City of Brooksville)
    City of Brooksville Utilities Department
    UNCONFIRMED AMOUNT — rate is not published anywhere. Code Ch. 86, Art. V, Sec. 86-281 imposes a water impact fee on an ERU basis (1 ERU = 24 water-supply fixture units = 250 gpd), so a nonresidential building's fee = its fixture-unit count ÷ 24 × the $/ERU rate; there is no meter-size ladder. Sec. 86-281(c): 'Impact fee rates shall be fixed by the city council by resolution' — and that resolution is NOT published: not codified, absent from the city's Amended Final Fee Schedule (permit/administrative fees only), and the New Construction utility application leaves the connection-fee line blank ('subject to the rates in effect at the time of payment'). Sec. 86-281(b): installation/hook-up charges are separate and additional. Web search 7/12/2026 surfaced no posted schedule. Call Utilities Customer Service, 600 S. Brooksville Ave, 352-540-3860, for the current $/ERU.
    Requires confirmation
Sewer$0.00
  • Sewer Impact Fee (City of Brooksville)
    City of Brooksville Utilities Department
    UNCONFIRMED AMOUNT — rate is not published anywhere. Code Ch. 86, Art. V, Sec. 86-281 imposes a sanitary sewer impact fee on an ERU basis (1 ERU = 24 drainage fixture units = 200 gpd sewer); nonresidential fee = fixture-unit count ÷ 24 × the $/ERU rate. No meter-size ladder. Sec. 86-281(c): rates 'fixed by the city council by resolution'; the operative resolution is unpublished (not codified, not in the city fee schedule, blank on the New Construction utility application). Sec. 86-281(b): hook-up/installation charges are separate and additional. Web search 7/12/2026 found no posted schedule. Call Utilities, 352-540-3860.
    Requires confirmation
City$1.48/sq ft
  • City Impact Fee (City of Brooksville, Office)
    City of Brooksville
    Code Ch. 50, Sec. 50-13 (Ord. No. 955, eff. 1-9-2023). Schedule row: 'Office (50k sq ft)', per 1,000 sf. Components: Fire Rescue $164 + Public Buildings $314 + Parks & Recreation — (none) + Multi-Modal $998 = $1,476. Only one office row — not size-tiered; the 50k sq ft label is the study's demand assumption, not a tier boundary. Verified on Municode 7/12/2026.
    $1.48/sq ft
County$4.74/sq ft
  • County Impact Fee (Brooksville, Office)
    Hernando County
    Hernando County Impact Fee Schedule; Ord. No. 2024-10 (adopted 7/30/2024), Phase 2 column eff. 12/2/2025 = final phase. Schedule row: OFFICE, per 1,000 sq ft GFA (general Office row is not size-tiered — only Medical Office splits at 10,000 sq ft — so it covers a 25,000 sq ft office). CORRECTED ON AUDIT 2026-07-13 (was $98). Same basis as the Brooksville Commercial county record: Ch. 23 Art. III Div. 3 Public Capital Facilities (Sec. 23-86(c)) and Div. 5 Roads (Sec. 23-133(c)) expressly apply in the incorporated areas, and Brooksville Ch. 50 has no credit/offset against county fees, so county fees stack with the city's. The prior amount rested on an unsupported 'displacement' assumption and omitted the $4,290 Roads component. Components: Public Buildings $335 + Law Enforcement $93 + Jail $5 + Roads $4,290 + Hernando County EMS $18 = $4,741 (Educational, Library, Parks $0 on all nonres rows). STILL UNCONFIRMED: the in-city fire/EMS component — Sec. 23-48(b) makes Brooksville its own fire benefit district with a separate city-administered rate column ($205 office), excluded here to avoid double-counting Ch. 50's Fire Rescue line. CONFIRM with Hernando County Zoning (352-754-4048) or Brooksville Building Division (352-540-3853).
    $4.74/sq ftRequires confirmation
Total (Brooksville): $6.22/sq ft (≈ $155,425.00 at 25,000 sq ft)
Sources last checked August 5, 2026Official fee schedules:City of Brooksville Utilities Department City of Brooksville Hernando County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hernando County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Hernando County$142,850.00
Brooksville$155,425.00this pageIncludes unconfirmed fees

Estimate your project in Brooksville

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Frequently asked questions

What are the total impact fees for a single-family home in Brooksville, Florida?

A new single-family home in Brooksville pays $16,039.00 per unit in combined impact fees (rates sourced August 5, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Brooksville?

Commercial development in Brooksville pays $9.87 per square foot in impact fees, at least $493,550.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Brooksville charge its own impact fees?

Yes. Brooksville levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Brooksville, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hernando County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000