Key Colony Beach impact fees by project type
Key Colony Beach: Single-Family Impact Fees
A new single-family home in Key Colony Beach pays at least $5,279.00 per unit in impact fees (rates sourced July 17, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water System Development Charge (FKAA) ($5,279.00).
Sewer System Development/Capacity Fee (Key Colony Beach) is set by the utility and not published online. County Impact Fees within Key Colony Beach (applicability) is set by the county and has no published standard rate. City Impact Fees (City of Key Colony Beach) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water System Development Charge (FKAA)$5,279.00Florida Keys Aqueduct AuthorityFKAA 'Summary of Water Rates, Fees and Charges' Sec. 48-204, eff 10/1/2025 (FY26): Residential single-family Water SDC = $5,279.00 at 5/8"x3/4" meter ($13,196 at 1"). Separate tapping/meter-install fee $1,760. Supersedes FY22 $3,750. FY26 still current per FKAA Rules & Regs rev. 10/1/25. Meter-size tiers above 5/8" not yet exploded.
- Sewer System Development/Capacity Fee (Key Colony Beach)Requires confirmationCity of Key Colony BeachFEE EXISTS, AMOUNT UNPUBLISHED 8/4/2026: Key Colony Beach operates its own wastewater system (not FKAA) with a standing Utility Board; a connection/capacity fee applies to new connections but no schedule is published on keycolonybeach.net. Amount null; keep flagged. City Hall/Utility Board (305) 289-1212. Re-checked 8/4/2026.
- City Impact Fees (City of Key Colony Beach)Requires confirmationCity of Key Colony BeachINFERRED $0 8/4/2026: Key Colony Beach (~800 pop) publishes no municipal impact-fee schedule anywhere on keycolonybeach.net and no impact-fee ordinance is findable online; likely levies none, but city code not fully web-published so $0 stays inferred. Keep flagged. Confirm with City Hall (305) 289-1212. Re-checked 8/4/2026.
- County Impact Fees within Key Colony Beach (applicability)Requires confirmationMonroe County BOCCINFERRED $0 8/4/2026: Monroe County Ch. 126 fair-share fees apply in the unincorporated county; they reach a municipality only via interlocal agreement (Sec. 126-4(e)(2)). No interlocal with Key Colony Beach (inc. 1957) has been identified, and county amounts are set by unpublished BOCC resolution. $0 inferred inside Key Colony Beach; keep flagged. Confirm interlocal status with Monroe County Planning & Environmental Resources (305) 289-2500. Re-checked 8/4/2026.
Where in Monroe County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Key Colony Beach: Multifamily Impact Fees
A new multifamily unit in Key Colony Beach pays at least $1,060.00 per unit in impact fees (rates sourced July 17, 2026). Every line item is levied at the municipal or utility level.
Water SDC (FKAA, MF 4+ units) — 10 FV × $106/FV is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer SDC/Capacity Fee (Key Colony Beach, MF) is set by the utility and not published online. County Impact Fees within Key Colony Beach (applicability, MF) is set by the county and has no published standard rate. City Impact Fees (City of Key Colony Beach, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water SDC (FKAA, MF 4+ units) — 10 FV × $106/FV$1,060.00Requires confirmationFlorida Keys Aqueduct AuthorityFIXTURE-VALUE METHOD, RE-STAMPED 8/4/2026 (FKAA family): 10 FV × $106 = $1,060 modeled. (305) 296-2454.
- Sewer SDC/Capacity Fee (Key Colony Beach, MF)Requires confirmationCity of Key Colony BeachFEE EXISTS, AMOUNT UNPUBLISHED 8/4/2026: Key Colony Beach operates its own wastewater system (not FKAA) with a standing Utility Board; a connection/capacity fee applies to new connections but no schedule is published on keycolonybeach.net. Amount null; keep flagged. City Hall/Utility Board (305) 289-1212. Re-checked 8/4/2026.
- City Impact Fees (City of Key Colony Beach, MF)Requires confirmationCity of Key Colony BeachINFERRED $0 8/4/2026: Key Colony Beach (~800 pop) publishes no municipal impact-fee schedule anywhere on keycolonybeach.net and no impact-fee ordinance is findable online; likely levies none, but city code not fully web-published so $0 stays inferred. Keep flagged. Confirm with City Hall (305) 289-1212. Re-checked 8/4/2026.
- County Impact Fees within Key Colony Beach (applicability, MF)Requires confirmationMonroe County BOCCINFERRED $0 8/4/2026: Monroe County Ch. 126 fair-share fees apply in the unincorporated county; they reach a municipality only via interlocal agreement (Sec. 126-4(e)(2)). No interlocal with Key Colony Beach (inc. 1957) has been identified, and county amounts are set by unpublished BOCC resolution. $0 inferred inside Key Colony Beach; keep flagged. Confirm interlocal status with Monroe County Planning & Environmental Resources (305) 289-2500. Re-checked 8/4/2026.
Where in Monroe County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Key Colony Beach: Commercial Impact Fees
Commercial development in Key Colony Beach pays no per-square-foot impact fees (rates sourced July 17, 2026).
Water System Development Charge (FKAA) and Sewer System Development/Capacity Fee (Key Colony Beach) are set by the utility and not published online. City Impact Fees (City of Key Colony Beach, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water System Development Charge (FKAA)Contact jurisdiction/utility to verifyFlorida Keys Aqueduct AuthorityFKAA §48-204 Commercial Water System Development Charge, eff 10/1/2025 (FY26 schedule adopted Oct 2025). PRIMARY basis: $106.00 per Fixture Value (total FV at premises incl. irrigation). Meter-based SDC only where FV cannot be determined: 5/8"=$5,279; 1"=$13,196; 1.5"=$26,390; 2"=$42,224; 3"=$79,170; 4"=$131,950; 6"=$263,899; 8"=$422,239. Separate one-time Tapping/Meter Installation Fee (1"=$2,346). FKAA is the sole countywide potable water provider (all Florida Keys).
- Sewer System Development/Capacity Fee (Key Colony Beach)Requires confirmationCity of Key Colony BeachKey Colony Beach operates its own wastewater system (not FKAA); standing Utility Board (agendas on keycolonybeach.net). Nonres connection/capacity fee not published. Call 305-289-1212 (Utility Board). $0 placeholder pending confirmation.
- City Impact Fees (City of Key Colony Beach, Commercial)Requires confirmationCity of Key Colony BeachSmall city (~790 pop). No municipal impact-fee schedule posted on keycolonybeach.net (WordPress); likely minimal/none. Confirm — 305-289-1212. $0 placeholder pending confirmation.
Where in Monroe County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Key Colony Beach: Industrial Impact Fees
Industrial development in Key Colony Beach pays no per-square-foot impact fees (rates sourced July 17, 2026).
Water System Development Charge (FKAA) and Sewer System Development/Capacity Fee (Key Colony Beach) are set by the utility and not published online. City Impact Fees (City of Key Colony Beach, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water System Development Charge (FKAA)Contact jurisdiction/utility to verifyFlorida Keys Aqueduct AuthorityFKAA §48-204 Commercial Water System Development Charge, eff 10/1/2025 (FY26 schedule adopted Oct 2025). PRIMARY basis: $106.00 per Fixture Value (total FV at premises incl. irrigation). Meter-based SDC only where FV cannot be determined: 5/8"=$5,279; 1"=$13,196; 1.5"=$26,390; 2"=$42,224; 3"=$79,170; 4"=$131,950; 6"=$263,899; 8"=$422,239. Separate one-time Tapping/Meter Installation Fee (1"=$2,346). FKAA is the sole countywide potable water provider (all Florida Keys).
- Sewer System Development/Capacity Fee (Key Colony Beach)Requires confirmationCity of Key Colony BeachKey Colony Beach operates its own wastewater system (not FKAA); standing Utility Board (agendas on keycolonybeach.net). Nonres connection/capacity fee not published. Call 305-289-1212 (Utility Board). $0 placeholder pending confirmation.
- City Impact Fees (City of Key Colony Beach, Industrial)Requires confirmationCity of Key Colony BeachSmall city (~790 pop). No municipal impact-fee schedule posted on keycolonybeach.net; likely minimal/none. Confirm — 305-289-1212. $0 placeholder pending confirmation.
Where in Monroe County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Key Colony Beach: Office Impact Fees
Office development in Key Colony Beach pays no per-square-foot impact fees (rates sourced July 17, 2026).
Water System Development Charge (FKAA) and Sewer System Development/Capacity Fee (Key Colony Beach) are set by the utility and not published online. City Impact Fees (City of Key Colony Beach, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water System Development Charge (FKAA)Contact jurisdiction/utility to verifyFlorida Keys Aqueduct AuthorityFKAA §48-204 Commercial Water System Development Charge, eff 10/1/2025 (FY26 schedule adopted Oct 2025). PRIMARY basis: $106.00 per Fixture Value (total FV at premises incl. irrigation). Meter-based SDC only where FV cannot be determined: 5/8"=$5,279; 1"=$13,196; 1.5"=$26,390; 2"=$42,224; 3"=$79,170; 4"=$131,950; 6"=$263,899; 8"=$422,239. Separate one-time Tapping/Meter Installation Fee (1"=$2,346). FKAA is the sole countywide potable water provider (all Florida Keys).
- Sewer System Development/Capacity Fee (Key Colony Beach)Requires confirmationCity of Key Colony BeachKey Colony Beach operates its own wastewater system (not FKAA); standing Utility Board (agendas on keycolonybeach.net). Nonres connection/capacity fee not published. Call 305-289-1212 (Utility Board). $0 placeholder pending confirmation.
- City Impact Fees (City of Key Colony Beach, Office)Requires confirmationCity of Key Colony BeachSmall city (~790 pop). No municipal impact-fee schedule posted on keycolonybeach.net; likely minimal/none. Confirm — 305-289-1212. $0 placeholder pending confirmation.
Where in Monroe County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Key Colony Beach
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Frequently asked questions
What are the total impact fees for a single-family home in Key Colony Beach, Florida?
A new single-family home in Key Colony Beach pays at least $5,279.00 per unit in combined impact fees (rates sourced July 17, 2026). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Key Colony Beach?
Key Colony Beach does not currently levy impact fees on commercial development.
Does Key Colony Beach charge its own impact fees?
Yes. Key Colony Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Key Colony Beach, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Monroe County impact fees page.