Interlachen, Florida Impact Fees

Interlachen applies its own fee schedule: municipal fees plus the Putnam County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $500.00 per unit (rates sourced July 18, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Interlachen impact fees by project type

Interlachen: Single-Family Impact Fees

A new single-family home in Interlachen pays at least $500.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

Water Connection Fee (Town of Interlachen) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Public Facilities Impact Fees (Putnam County, in Interlachen) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$500.00
  • Water Connection Fee (Town of Interlachen)
    Town of Interlachen
    Town of Interlachen Ord. 2013-4 (repealing Ord. 2009-8), § 9.9: standard residential connection fee $500.00, which includes 100 ft of pipe, a 3/4-inch meter and a backflow preventer; extra material billed at cost. § 9.10 standard commercial connection $750 plus materials/labor. Town operates three water plants (water only). UNCONFIRMED: the Town posts no ordinances or fee schedule on its website — the 2013 ordinance text was obtained from an ordinance archive and is 13 years old. Confirm the current amount with the Town Clerk / Public Works (386) 684-3811.
    $500.00Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Interlachen)
    Town of Interlachen
    CONFIRMED $0 — no central sewer. The Town operates three WATER plants and no wastewater system; the Town's department list has a Water Department and no sewer/wastewater utility, and Ord. 2013-4 (the Town's utility ordinance) regulates water service only. Development uses on-site septic. No municipal sewer connection or impact fee exists to charge.
    $0.00
City$0.00
  • City Impact Fees (Town of Interlachen)
    Town of Interlachen
    [8/4/2026] INFERRED_0 — kept flagged. No Town of Interlachen impact fees identified: town has no codifier and posts no fee schedule; Putnam County issues all Interlachen building permits/COs (interlocal recited in Ord. 2013-4 s.13.1). CORROBORATION [8/4/2026]: Palatka Daily News ('County OKs impact fees') reports Interlachen has NO municipal impact fees. Negative still not provable from a town document. Confirm w/ Town Clerk (386) 684-3811.
    Requires confirmation
County$0.00
  • County Public Facilities Impact Fees (Putnam County, in Interlachen)
    Putnam County
    [8/4/2026] SPLIT_NEEDED — kept flagged. Putnam County Code Ch. 24 (Ord. 2025-015, eff. 6-10-2025): s.24-6 facility districts include municipalities served by the county service, but s.24-6(c) requires an interlocal to collect in-city. Putnam County issues all Interlachen building permits (interlocal recited in Ord. 2013-4 s.13.1) and Ch. 24 collects at permit issuance, so Interlachen remains the most likely municipality where the county fee attaches — but no impact-fee interlocal was identified at the 1/13/2026 meeting. If ever collected in-city, SFR per du (Table 24-1, ITE 210): Transp $4,927 + Fire $921 + Law Enf $148 + Gov Bldgs $1,270 + Parks $445 = $7,711. UPDATE [8/4/2026]: At the 1/13/2026 joint Putnam County/Palatka meeting, officials confirmed NO interlocal agreements yet exist for county impact-fee collection inside municipalities; staff were directed to draft a county-city coordination agreement (~90-day return). Palatka Daily News also reports Palatka and Crescent City levy their own city impact fees while Interlachen, Pomona Park and Welaka have none. Until an interlocal under s.24-6(c) is executed, county Ch. 24 fees are evidently NOT being collected inside city limits. Sources: https://citizenportal.ai/articles/7283002/florida/putnam-county/putnam-county-and-palatka-ask-staff-to-draft-impact-fee-coordination-agreement-after-disputes-over-transportation-fees ; https://www.palatkadailynews.com/local-news/county-oks-impact-fees ; https://www.putnam-fl.gov/wp-content/uploads/2025/09/Impact-Fee-Ordinance.pdf. Re-check for executed interlocals; Putnam Dev Svcs (386) 329-0307.
    Requires confirmation
Total (Interlachen): $500.00
Sources last checked July 18, 2026Official fee schedules:Town of Interlachen Putnam County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Putnam County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Interlachen: Multifamily Impact Fees

A new multifamily unit in Interlachen pays at least $500.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

Water Connection Fee (Town of Interlachen, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Public Facilities Impact Fees (Putnam County, in Interlachen, MF) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$500.00
  • Water Connection Fee (Town of Interlachen, MF)
    Town of Interlachen
    ⚠️ AMOUNT REAL, MF APPLICABILITY DOUBTFUL (8/4/2026). Ord. 2013-4 Sec. 9: standard residential connection $500 incl. 100 ft of pipe — but 'standard' = ≤2" main, 3/4" meter; a 4-story building is NON-standard (commercial connection $750 + costs). No newer schedule since 2013. (386) 684-3811.
    $500.00Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Interlachen, MF)
    Town of Interlachen
    CONFIRMED $0 — no central sewer. The Town runs three water plants and no wastewater system (no sewer/wastewater department; Ord. 2013-4 covers water only). MF development uses on-site septic. No municipal sewer connection or impact fee exists.
    $0.00
City$0.00
  • City Impact Fees (Town of Interlachen, MF)
    Town of Interlachen
    [8/4/2026] INFERRED_0 — kept flagged. No Town of Interlachen impact fees identified: town has no codifier and posts no fee schedule; Putnam County issues all Interlachen building permits/COs (interlocal recited in Ord. 2013-4 s.13.1). CORROBORATION [8/4/2026]: Palatka Daily News ('County OKs impact fees') reports Interlachen has NO municipal impact fees. Negative still not provable from a town document. Confirm w/ Town Clerk (386) 684-3811.
    Requires confirmation
County$0.00
  • County Public Facilities Impact Fees (Putnam County, in Interlachen, MF)
    Putnam County
    [8/4/2026] SPLIT_NEEDED — kept flagged. Putnam County Code Ch. 24 (Ord. 2025-015, eff. 6-10-2025): s.24-6 facility districts include municipalities served by the county service, but s.24-6(c) requires an interlocal to collect in-city. County issues all Interlachen permits (Ord. 2013-4 s.13.1) — most likely city where the county fee attaches, but no impact-fee interlocal identified as of 1/13/2026. If ever collected in-city, MF per du (Table 24-1): 4+ floors $4,408 (Transp $2,199 + Fire $738 + Law $97 + Gov $1,018 + Parks $356); 1-3 floors $5,489 (Transp $3,280). UPDATE [8/4/2026]: At the 1/13/2026 joint Putnam County/Palatka meeting, officials confirmed NO interlocal agreements yet exist for county impact-fee collection inside municipalities; staff were directed to draft a county-city coordination agreement (~90-day return). Palatka Daily News also reports Palatka and Crescent City levy their own city impact fees while Interlachen, Pomona Park and Welaka have none. Until an interlocal under s.24-6(c) is executed, county Ch. 24 fees are evidently NOT being collected inside city limits. Sources: https://citizenportal.ai/articles/7283002/florida/putnam-county/putnam-county-and-palatka-ask-staff-to-draft-impact-fee-coordination-agreement-after-disputes-over-transportation-fees ; https://www.palatkadailynews.com/local-news/county-oks-impact-fees ; https://www.putnam-fl.gov/wp-content/uploads/2025/09/Impact-Fee-Ordinance.pdf. Re-check for executed interlocals; Putnam Dev Svcs (386) 329-0307.
    Requires confirmation
Total (Interlachen): $500.00
Sources last checked July 18, 2026Official fee schedules:Town of Interlachen Putnam County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Putnam County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Interlachen: Commercial Impact Fees

Commercial development in Interlachen pays no per-square-foot impact fees, but owes $750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $750.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Town of Interlachen) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Public Facilities Impact Fees (Putnam County, in Interlachen, Commercial) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$750.00 one-time
  • Water Connection Fee (Town of Interlachen)
    Town of Interlachen
    UNCONFIRMED. Town of Interlachen Ord. 2013-4 § 9.10: standard commercial connection $750 plus materials/labor. Town operates water only (3 water plants); no sewer. Ord. is 13 years old and the Town posts no current fee schedule — confirm w/ Town Clerk / Public Works (386) 684-3811.
    $750.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Interlachen)
    Town of Interlachen
    CONFIRMED $0 — no central sewer. Town operates 3 water plants and no wastewater system; Ord. 2013-4 regulates water only; development on septic. No sewer connection/impact fee exists.
    $0.00
City$0.00
  • City Impact Fees (Town of Interlachen, Commercial)
    Town of Interlachen
    $0 placeholder, UNCONFIRMED. Small town (~1,440), no codifier, no posted fee schedule - negative cannot be proved from a document. No municipal impact fee identified. Putnam County issues Interlachen building permits (interlocal per Ord. 2013-4 13.1). Confirm w/ Town Clerk (386) 684-3811.
    Requires confirmation
County$0.00
  • County Public Facilities Impact Fees (Putnam County, in Interlachen, Commercial)
    Putnam County
    UNCONFIRMED but LIKELY collected. Putnam County issues ALL Interlachen building permits (interlocal, Ord. 2013-4 13.1) and Ch. 24 collects at permit issuance; town has no PD/FD (county services). If collected, nonres per 1,000 sfgla (ITE 821 Retail 40-150k): Transp $4,654 + Fire $1,618 + Law $319 + Gov Bldgs $2,631 = $9,222; Parks residential-only. Confirm w/ Putnam Dev Svcs (386) 329-0307.
    Requires confirmation
Total (Interlachen): $750.00 one-time (≈ $750.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:Town of Interlachen Putnam County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Putnam County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Interlachen: Industrial Impact Fees

Industrial development in Interlachen pays no per-square-foot impact fees, but owes $750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $750.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Town of Interlachen) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Public Facilities Impact Fees (Putnam County, in Interlachen, Industrial) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$750.00 one-time
  • Water Connection Fee (Town of Interlachen)
    Town of Interlachen
    UNCONFIRMED. Town of Interlachen Ord. 2013-4 § 9.10: standard commercial connection $750 plus materials/labor. Town operates water only (3 water plants); no sewer. Ord. is 13 years old and the Town posts no current fee schedule — confirm w/ Town Clerk / Public Works (386) 684-3811.
    $750.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Interlachen)
    Town of Interlachen
    CONFIRMED $0 — no central sewer. Town operates 3 water plants and no wastewater system; Ord. 2013-4 regulates water only; development on septic. No sewer connection/impact fee exists.
    $0.00
City$0.00
County$0.00
Total (Interlachen): $750.00 one-time (≈ $750.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:Town of Interlachen Putnam County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Putnam County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Interlachen: Office Impact Fees

Office development in Interlachen pays no per-square-foot impact fees, but owes $750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to at least $750.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Town of Interlachen) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Public Facilities Impact Fees (Putnam County, in Interlachen, Office) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$750.00 one-time
  • Water Connection Fee (Town of Interlachen)
    Town of Interlachen
    UNCONFIRMED. Town of Interlachen Ord. 2013-4 § 9.10: standard commercial connection $750 plus materials/labor. Town operates water only (3 water plants); no sewer. Ord. is 13 years old and the Town posts no current fee schedule — confirm w/ Town Clerk / Public Works (386) 684-3811.
    $750.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Interlachen)
    Town of Interlachen
    CONFIRMED $0 — no central sewer. Town operates 3 water plants and no wastewater system; Ord. 2013-4 regulates water only; development on septic. No sewer connection/impact fee exists.
    $0.00
City$0.00
County$0.00
Total (Interlachen): $750.00 one-time (≈ $750.00 at 25,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:Town of Interlachen Putnam County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Putnam County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Interlachen

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Frequently asked questions

What are the total impact fees for a single-family home in Interlachen, Florida?

A new single-family home in Interlachen pays at least $500.00 per unit in combined impact fees (rates sourced July 18, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Interlachen?

Commercial development in Interlachen pays no per-square-foot impact fees, but owes $750.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Interlachen charge its own impact fees?

Yes. Interlachen levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Interlachen, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Putnam County impact fees page.

Missing a jurisdiction? Get in touch.