Interlachen impact fees by project type
Interlachen: Single-Family Impact Fees
A new single-family home in Interlachen pays at least $500.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee (Town of Interlachen) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
County Public Facilities Impact Fees (Putnam County, in Interlachen) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Interlachen)$500.00Requires confirmationTown of InterlachenTown of Interlachen Ord. 2013-4 (repealing Ord. 2009-8), § 9.9: standard residential connection fee $500.00, which includes 100 ft of pipe, a 3/4-inch meter and a backflow preventer; extra material billed at cost. § 9.10 standard commercial connection $750 plus materials/labor. Town operates three water plants (water only). UNCONFIRMED: the Town posts no ordinances or fee schedule on its website — the 2013 ordinance text was obtained from an ordinance archive and is 13 years old. Confirm the current amount with the Town Clerk / Public Works (386) 684-3811.
- Sewer Connection Fee (Town of Interlachen)$0.00Town of InterlachenCONFIRMED $0 — no central sewer. The Town operates three WATER plants and no wastewater system; the Town's department list has a Water Department and no sewer/wastewater utility, and Ord. 2013-4 (the Town's utility ordinance) regulates water service only. Development uses on-site septic. No municipal sewer connection or impact fee exists to charge.
- City Impact Fees (Town of Interlachen)Requires confirmationTown of Interlachen$0 placeholder. Small town (~1,440). No municipal development impact fees identified; the Town has no codifier (not on Municode) and posts no fee schedule or ordinance list, so a negative finding cannot be proved from a document. Per an interlocal agreement recited in Ord. 2013-4 § 13.1, PUTNAM COUNTY Planning & Development issues all Interlachen building permits, inspections and COs — which is also why the county impact fee is the fee that most likely attaches here. Confirm no town impact fee w/ Town Clerk (386) 684-3811.
- County Public Facilities Impact Fees (Putnam County, in Interlachen)Requires confirmationPutnam CountyUNCONFIRMED applicability, but LIKELY collected. Putnam County Code Ch. 24 (Ord. No. 2025-015, eff. 6-10-2025). § 24-6 defines each facility district as the unincorporated area PLUS any municipality served by that county service; § 24-6(c) requires an interlocal to collect. Interlachen Ord. 2013-4 § 13.1 recites an interlocal under which PUTNAM COUNTY Planning & Development issues ALL Interlachen building permits and COs — and Ch. 24 § 24-8 collects the fee at building-permit issuance, so the county is the collecting agency here. If collected, SFR per du (Table 24-1, ITE 210): Transp $4,927 + Fire $921 + Law Enf $148 + Gov Bldgs $1,270 + Parks $445 = $7,711. Confirm w/ Putnam Dev Svcs (386) 329-0307.
Where in Putnam County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Interlachen: Multifamily Impact Fees
A new multifamily unit in Interlachen pays at least $500.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee (Town of Interlachen, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
County Public Facilities Impact Fees (Putnam County, in Interlachen, MF) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Interlachen, MF)$500.00Requires confirmationTown of InterlachenPER-UNIT basis established. Interlachen Ord. 2013-4 § 9.9: standard residential connection fee $500.00 (incl. 100 ft pipe, 3/4-inch meter, backflow preventer). § 4.1(2): 'No building permits for construction of new dwelling units shall be issued unless separate water meters are provided' and each unit built after 11/1/2001 must connect directly and receive water through a SEPARATE METER; § 6.1 bars joint service to more than one residence/apartment. So each MF dwelling unit takes its own standard residential connection → $500 per unit. UNCONFIRMED: the Town posts no ordinances or fee schedule; the 2013 text came from an ordinance archive and is 13 years old. Confirm w/ Town Clerk (386) 684-3811.
- Sewer Connection Fee (Town of Interlachen, MF)$0.00Town of InterlachenCONFIRMED $0 — no central sewer. The Town runs three water plants and no wastewater system (no sewer/wastewater department; Ord. 2013-4 covers water only). MF development uses on-site septic. No municipal sewer connection or impact fee exists.
- City Impact Fees (Town of Interlachen, MF)Requires confirmationTown of Interlachen$0 placeholder. No municipal development impact fees identified. The Town has no codifier and posts no fee schedule, so the negative cannot be proved from a document. Putnam County Planning & Development issues all Interlachen building permits (interlocal recited in Ord. 2013-4 § 13.1). UNCONFIRMED — confirm w/ Town Clerk (386) 684-3811.
- County Public Facilities Impact Fees (Putnam County, in Interlachen, MF)Requires confirmationPutnam CountyUNCONFIRMED applicability, but LIKELY collected. Putnam County Code Ch. 24 (Ord. 2025-015). Interlachen Ord. 2013-4 § 13.1 recites an interlocal under which PUTNAM COUNTY Planning & Development issues ALL Interlachen building permits and COs, and Ch. 24 collects the fee at building-permit issuance — so the county is the collecting agency here. If collected, MF per du (Table 24-1): 4+ floors $4,408 (Transp $2,199 + Fire $738 + Law $97 + Gov $1,018 + Parks $356); 1-3 floors $5,489 (Transp $3,280). Confirm w/ Putnam Dev Svcs (386) 329-0307.
Where in Putnam County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Interlachen: Commercial Impact Fees
Commercial development in Interlachen pays no per-square-foot impact fees, but owes $750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $750.00. The calculator below adjusts to your exact square footage.
Water Connection Fee (Town of Interlachen) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
County Public Facilities Impact Fees (Putnam County, in Interlachen, Commercial) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Interlachen)$750.00 one-timeRequires confirmationTown of InterlachenUNCONFIRMED. Town of Interlachen Ord. 2013-4 § 9.10: standard commercial connection $750 plus materials/labor. Town operates water only (3 water plants); no sewer. Ord. is 13 years old and the Town posts no current fee schedule — confirm w/ Town Clerk / Public Works (386) 684-3811.
- Sewer Connection Fee (Town of Interlachen)$0.00Town of InterlachenCONFIRMED $0 — no central sewer. Town operates 3 water plants and no wastewater system; Ord. 2013-4 regulates water only; development on septic. No sewer connection/impact fee exists.
- City Impact Fees (Town of Interlachen, Commercial)Requires confirmationTown of Interlachen$0 placeholder, UNCONFIRMED. Small town (~1,440), no codifier, no posted fee schedule - negative cannot be proved from a document. No municipal impact fee identified. Putnam County issues Interlachen building permits (interlocal per Ord. 2013-4 13.1). Confirm w/ Town Clerk (386) 684-3811.
- County Public Facilities Impact Fees (Putnam County, in Interlachen, Commercial)Requires confirmationPutnam CountyUNCONFIRMED but LIKELY collected. Putnam County issues ALL Interlachen building permits (interlocal, Ord. 2013-4 13.1) and Ch. 24 collects at permit issuance; town has no PD/FD (county services). If collected, nonres per 1,000 sfgla (ITE 821 Retail 40-150k): Transp $4,654 + Fire $1,618 + Law $319 + Gov Bldgs $2,631 = $9,222; Parks residential-only. Confirm w/ Putnam Dev Svcs (386) 329-0307.
Where in Putnam County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Interlachen: Industrial Impact Fees
Industrial development in Interlachen pays no per-square-foot impact fees, but owes $750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $750.00. The calculator below adjusts to your exact square footage.
Water Connection Fee (Town of Interlachen) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
County Public Facilities Impact Fees (Putnam County, in Interlachen, Industrial) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Interlachen)$750.00 one-timeRequires confirmationTown of InterlachenUNCONFIRMED. Town of Interlachen Ord. 2013-4 § 9.10: standard commercial connection $750 plus materials/labor. Town operates water only (3 water plants); no sewer. Ord. is 13 years old and the Town posts no current fee schedule — confirm w/ Town Clerk / Public Works (386) 684-3811.
- Sewer Connection Fee (Town of Interlachen)$0.00Town of InterlachenCONFIRMED $0 — no central sewer. Town operates 3 water plants and no wastewater system; Ord. 2013-4 regulates water only; development on septic. No sewer connection/impact fee exists.
- City Impact Fees (Town of Interlachen, Industrial)Requires confirmationTown of Interlachen$0 placeholder, UNCONFIRMED. No codifier / no posted fee schedule. Confirm w/ Town Clerk (386) 684-3811.
- County Public Facilities Impact Fees (Putnam County, in Interlachen, Industrial)Requires confirmationPutnam CountyUNCONFIRMED but LIKELY collected (county issues Interlachen permits). If collected, nonres per 1,000 sf (ITE 110 General Light Industrial): Transp $2,146 + Fire $266 + Law $52 + Gov Bldgs $432 = $2,896; Parks residential-only. Putnam Dev Svcs (386) 329-0307.
Where in Putnam County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Interlachen: Office Impact Fees
Office development in Interlachen pays no per-square-foot impact fees, but owes $750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to at least $750.00. The calculator below adjusts to your exact square footage.
Water Connection Fee (Town of Interlachen) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
County Public Facilities Impact Fees (Putnam County, in Interlachen, Office) is set by the county and has no published standard rate. City Impact Fees (Town of Interlachen, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Interlachen)$750.00 one-timeRequires confirmationTown of InterlachenUNCONFIRMED. Town of Interlachen Ord. 2013-4 § 9.10: standard commercial connection $750 plus materials/labor. Town operates water only (3 water plants); no sewer. Ord. is 13 years old and the Town posts no current fee schedule — confirm w/ Town Clerk / Public Works (386) 684-3811.
- Sewer Connection Fee (Town of Interlachen)$0.00Town of InterlachenCONFIRMED $0 — no central sewer. Town operates 3 water plants and no wastewater system; Ord. 2013-4 regulates water only; development on septic. No sewer connection/impact fee exists.
- City Impact Fees (Town of Interlachen, Office)Requires confirmationTown of Interlachen$0 placeholder, UNCONFIRMED. No codifier / no posted fee schedule. Confirm no town impact fee w/ Town Clerk (386) 684-3811.
- County Public Facilities Impact Fees (Putnam County, in Interlachen, Office)Requires confirmationPutnam CountyUNCONFIRMED but LIKELY collected (county issues Interlachen permits). If collected, nonres per 1,000 sf (ITE 710 General Office): Transp $4,800 + Fire $561 + Law $110 + Gov Bldgs $912 = $6,383; Parks residential-only. Putnam Dev Svcs (386) 329-0307.
Where in Putnam County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Interlachen
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Interlachen, Florida?
A new single-family home in Interlachen pays at least $500.00 per unit in combined impact fees (rates sourced July 18, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Interlachen?
Commercial development in Interlachen pays no per-square-foot impact fees, but owes $750.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Interlachen charge its own impact fees?
Yes. Interlachen levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Interlachen, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Putnam County impact fees page.